BVY-93-100, Retracts 930827 Request That Condition Be Removed from LP Amirault License SOP-10859,per Determination That Already Sent & Amend to Subj License Issued.Proprietary Documentation Encl.Documentation Withheld

From kanterella
Jump to navigation Jump to search
Retracts 930827 Request That Condition Be Removed from LP Amirault License SOP-10859,per Determination That Already Sent & Amend to Subj License Issued.Proprietary Documentation Encl.Documentation Withheld
ML20057C350
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/17/1993
From: Wanczyk R
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310E827 List:
References
BVY-93-100, TDL-93-28, NUDOCS 9309280254
Download: ML20057C350 (1)


Text

L f

VERMONT YANKEE NUCLEAR POWER CORPORATION

~ .

+ -

. .s y Ferry Road, Brattleboro, VT 05301-7002

). ENGINEERING OFFICE N -- -

%0 M AIN STREET September 17,1993 pot 70,4 VA 0170

- -~ BVY 93-100 isos,773 e,7,3 TDL 93-28 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) 10 CFR 55.51, Issuance of Licenses (c) Letter VY to NRC 6ated August 27,1993 (d) Letter VY to NRC dated April 11, 1990 (e) Telecon A. Burritt to E. Harms 9/3/93

Dear Sir:

Subject:

License Modification in regards to Mr. Laurence P. Amirault (License No. SOP 10859. Docket No. 55-60500), reference (c),

was sent requesting that a condition be removed from his license. From discussions with Mrs. Virgil Curley and Mr. Art Burritt on September 3,1993, both from the USNRC Region 1 office, it was determined that a previous letter, reference (d), had already been sent and that an amendment to Mr. Amirault's license bad been issued. We have since been faxed a copy of this amendment, but have been unable to document that we, or Mr. Amirault, previously received a copy of this amendment.

Therefore, based on the existence of the amendment, we wish to retract reference (c). Also, we have attached documentation of Mr. Amirault's completion of his three months of *on-shift" time for your review, per your request from reference (e).

In accordance with 10 CFR 2.791 we are requesting that Attachment I be withheld from public disclosure.

If you have any questions about this matter please do not hesitate to call us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION l C k rts e' Robert J. 'anczyk Plant Manager WITHHOLD ATTACHMENT I FROM PUBLIC DISCLOSURE Attachment I c: USNRC Region 1 Administrator w/o enclosure +

l USNRC Resident Inspector - VYNPS w/o enclosure USNRC Project Manager - VYNPS w/o enclosure j Mrs. Virgil Curley, USNRC Region I Mr. Art Bunitt. USNRC Region I g'f- f,y/ ,

9309280254 930917 m

p

/

t/

/

/

-l {/ /' l PDR ADOCK 05000271 Oj / [_ > / O V . PDR G