B12558, Withdraws 860312 Request for Exemption from 10CFR50,App J, Section III.A.4.(a) to Allow Continued Integrated Leak Rate Testing (ILRT) at Reduced Pressure of 15 Psig.Ilrt Will Be Conducted at Test Pressure of 40 Psig

From kanterella
(Redirected from B12558)
Jump to navigation Jump to search
Withdraws 860312 Request for Exemption from 10CFR50,App J,Section III.A.4.(a) to Allow Continued Integrated Leak Rate Testing (ILRT) at Reduced Pressure of 15 Psig.Ilrt Will Be Conducted at Test Pressure of 40 Psig
ML20215C270
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/10/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
B12558, NUDOCS 8706180052
Download: ML20215C270 (1)


Text

_

CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N, CONNECTICUT P.O. Box 270

  • HARTFORD. CONNECTICUT 06141-0270 June 10,1987 TELEPHONE 25 ** ]

Docket No. 50-213 i B12558 Re: 10CFR50, Appendix 3 U.S. Nuclear Regulatory Commission Attn: Document Control Desk i Washington, D.C. 20555 j Gentlemen:

Haddam Neck Plant 10CFR50, Appendix 3 By letter dated March 12, 1986,(1) Connecticut Yankee Atomic Power Company (CYAPCO), on behalf of the Haddam Neck Plant, requested an exemption from the requirements of 10CFR50, Appendix 3,Section III.A.4.(a) to allow continued 1 Integrated Leak Rate Testing (ILRT) at a reduced pressure of 15 psig, in '

accordance with the current Technical Specifications.

CYAPCO plans to perform the upcoming Haddam Neck Plant ILRT at a test pressure of 40 psig. A Technical Specification change is not required as the 40 ,

psig test will be conducted in accordance with the Haddam Neck Plant Technical '

Specificat. ion Acceptance Criteria 4.4.1.B.I. As such, CYAPCO, on behalf of the Haddam Neck Plant, hereby formally withdraws its March 12, 1986 request for ,

exemption from the requirements of 10CFR50, Appendix 3,Section III.A.4.(a). J It should be noted that CYAPCO reserves the right to perform future ILRTs at a reduced test pressure, in accordance with the current Technical Specifications. .

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY e

E.'J/Woczka /

Senior Vice President cc: W. T. Russell, Region I Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant P. D. Swetland, Resident Inspector, Haddam Neck Plant (l) 3. F. Opeka letter to C. I. Grimes, "10CFR50, Appendix 3 - Request for Exemption," dated March 12,1986. \q-g61 BOOS 2870610l p ADOCK 05000213 I\b PDR