Forwards BAW-1878, Haddam Neck Plant Technical Rept Supporting Cycle 14 Operation. Cycle 14 Tech Spec Operating Limits Submitted W/Reload License Amend Request Still Valid & Supported by Revised Fuel Burnups
ML20205K343
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/18/1986
From: Opeka J, Sears C
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
Shared Package
ML20205K348 List:
References
B11999, NUDOCS 8602270312
Download: ML20205K343 (2)


Text

r CONNECTICUT YANKEE ATOMIC POWER COMPANY

[

B E R L I N, CO N N E C TIC UT P o box 270 HARTFORD. CONNECTICUT 06141-0270 TELEPHCNE 203-66s-5000 February 18, 1986 Docket No. 50-213 B11999 Office of Nuclear Reactor Regulation A ttn: Mr. Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Haddam Neck Plant Technical Report Supporting Cycle 14 Operation In a letter dated February 6, 1986(l), Connecticut Yankee Atomic Power Company (CYAPCO), committed to submit the final Cycle 14 Reload Report to the NRC Staff. A draf t copy of the reload report was informally submitted on January 20, 1986 and discussed during a meeting with the NRC Staff on January 23, 1986. The draft report was based on a projected nominal end-of-cycle 13 burnup and operating window.

The purpose of this letter is to submit three copies of the final Cycle 14 Reload Report for the Haddam Neck Plant. Enclosed are three copies of the Reload Report entitled "Haddam Neck Plant, Technical Report Supporting Cycle 14 Operation", BAW-1878, February 1986. This report utilized actual end-of-cycle fuel assembly burnups to determine the relevant operating parameters for Cycle

14. It should be noted that the Cycle 14 Technical Specification operating limits submitted previously with the reload license amendment request (2i are still valid and are supported by the revised fuel burnups.

(1) J. F. Opeka letter to C.1. Grimes, dated February 6,1986,

Subject:

Additional Information for Proposed Revision to Technical Specifications, Cycle 14 Reload.

(2) 3. F. Opeka letter to C. I. Grimes, dated December 11, 1985,

Subject:

Revision to Technical Specifications, Cycle 14 Reload, ge$

8602270312 e6021s u, i PDR ADOCK 05000213 p PDR

s..s ,

It is our understanding that the enclosed reload report completes the commitments made during the January 23, 1986 meeting with the NRC Staff to provide additional information for your review.- If you need any additional information, please let us know.

Enclosures Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY k .S. D

3. F. Opeka '

Senior Vice President By:- C. F. Sears Vice President

-