B10528, Final Significant Deficiency Rept Re Gould Starters,Used in QA Category 1 Motor Control Ctrs,W/Possible Contact Carrier Assembly Seizure Problems,Initially Reported 820525. Manufacturer Sending Retrofit Kits & Mod Instructions

From kanterella
Jump to navigation Jump to search
Final Significant Deficiency Rept Re Gould Starters,Used in QA Category 1 Motor Control Ctrs,W/Possible Contact Carrier Assembly Seizure Problems,Initially Reported 820525. Manufacturer Sending Retrofit Kits & Mod Instructions
ML20055A796
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/02/1982
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, B10528, NUDOCS 8207190461
Download: ML20055A796 (2)


Text

us .

o ..

  • "**'""*5'"*"5"""*"C*""""'"'

NORTHEAT. r trrILFFIES 3

"~

IOnEfo*nE CCNNECTICUT 06101

~l?::::.l "?'. ":,%: am) 6666915 L c J "T l ? :::""ll ,

July 2, 1982 Docket No. 50-423 AEC-MP3-276 B10528 Mr. Ronald C. Haynes, Director Region 1 Office of Inspection and Enforcement.

U. S. Nuc1 car Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Gentlemen:

MILLSTONE NUCLEAR POWER STATION, UNIT No. 3 REPORTING OF A POTENTIAL SIGNIFICANT DEFICIENCY IN DESIGN; COULD STARTERS, CLASS A821, A822 AND A823, NEMA SIZES 1 & 2 As required by Title 10, Code of Federal Regulations Part 50, Paragraph 55(e), on May 25, 1982 our Mr. R. E. Lefebvre called your L. Briggs and reported a potential significant deficiency in the construction of Millstone Unit No. 3. The potential significant deficiency involved Gould starters manufactured between May 11, 1981 and March 12, 1982 of class A821, A822 and A823, sizes 1 and 2. These are used in QA Category 1 motor control centers and were identified because possible binding or seizure of the contact carrier assembly could occur causing their associated motor not to start.

To eliminate this problem with the identified starters, (all were shipped per purchase order 2425.600-244 on January 30, 1982) the manufacturer is sending to the jobsite, retrofit kits and instructions for modification.

The manufacturer will also send a representative to the site to advise on the repairs and installation which will be performed by our field personnel.

8207190461 820702 PDR ADOCK 05000423 S PDR

$O 1

c .e m -

4 V We trust this final report provides you with sufficient detail describing our disposition of this significant deficiency in design.

Per telephone conversation between our Mr. J. M. Powers and Mr. E. J. Brunner's office, this final report is being forwarded one week later than the required 30 day response period.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

$hll04 W.*C.~Couns'il Senior Vice President 1

cc: Mr. E. J. Brunner Mr. L. Briggs-9, f

,