0CAN030403, February 2004 Monthly Operating Report for Arkansas Units 1 and 2

From kanterella
(Redirected from 0CAN030403)
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Arkansas Units 1 and 2
ML040770296
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/15/2004
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN030403
Download: ML040770296 (4)


Text

Entergy Operations, Inc.

Entergy 1448 S.R. 333 Russellville, AR 72802 Tel 501 858 5000 OCAN030403 March 15, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir of Madam:

Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 5.6.4 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter is to complete the reporting requirement for February 2004.

There are no new commitments contained in this submittal.

Sincerely, Dale E. James Manager, Licensing DEJ/SLP Attachment(s)

"J

OCAN030403 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Alexion Mail Stop 0-7 D1 Washington, DC 20555-0001

OPERATING DATA REPORT DOCKET NO. 50-313 UNIT NAME Arkansas Nuclear One - Unit I DATE March 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE (479) 858-5560 REPORTING PERIOD: February 2004

1. Design Electrical Rating (MWe-Net): 850
2. Maximum Dependable Capacity (MWe-Net): 836 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 696.00 1,440.00 202,012.89
4. Number of Hours Generator On-Line 696.00 1,440.00 199,256.72
5. Unit Reserve Shutdown Hours 0.0 0.0 817.5
6. Net Electrical Energy Generated (MWh1) 598,183 1,237,983 153,852,615 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective No. Date S: Scheduled (Hours) Reason Down2 Action I Comments None

SUMMARY

The Unit Operated the entire month at full reactor power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

OPERATING DATA REPORT DOCKET NO. 50-368 UNIT NAME Arkansas Nuclear ' One - Unit 2 DATE March 15, 2004 COMPLETED BY Steven L. Coffman TELEPHONE ,(479) 858-5560 REPORTING PERIOD: February 2004

1. Design Electrical Rating (MWe-Net): 912
2. Maximum Dependable Capacity (MWe-Net): 858 MONTH YR-TO-DATE CUMULATIVE
3. Number of Hours Reactor Was Critical 636.15 1,380.15 171,436.97
4. Number of Hours Generator On-Line 619.65 1,363.65 168,862.66
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 618,958 1,374,213.0 145,490,199 UNIT SHUTDOWNS Type Method of Cause &

F: Forced Duration Shutting Corrective Action No. Date S: Scheduled (Hours) Reason' Down2 Comments 2004-01 040206 S 65.65 B 1 Scheduled Outage to perform maintenance on a Reactor Coolant Pump

____ ____ ____ ____M otor 2004-02 040209 F .10.70 A 5 The scheduled outage was extended when the Main Turbine Generator automatically tripped on anti-motoring after being tied to the grid. The Reactor remained critical.

SUMMARY

The Unit began the month at full power. On 02/06/2004, the Unit was taken off line to perform planned maintenance on a Reactor Coolant Pump Motor. On 02/09/2004, the Unit was briefly tied to the grid when the Main Turbine Generator tripped on anti-motoring. The Unit was reconnected to the grid that same day and achieved full power 02/10/2004. From 02/24/2004 to 02/28/2004, Reactor power was allowed to drift down to -99.5% to replace resin in an RCS Letdown demineralizer.

The Unit operated the remainder of the month at full power.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)