Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20240122024-11-0101 November 2024 Commercial Grade Dedication Inspection Report 05000341/2024012 IR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20244042024-08-21021 August 2024 Public-Fermi Power Plant, Unit 2 - Material Control and Accounting Program Inspection Report 05000341/2024404 IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 – Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 05000341/LER-2023-002, Technical Specification Completion Time Exceeded Due to Repairs on the MDCT Fan D2023-09-15015 September 2023 Technical Specification Completion Time Exceeded Due to Repairs on the MDCT Fan D 05000341/LER-2023-001-01, Loss of Mechanical Draft Cooling Tower Fan Brakes During High Speeds Leads to Loss of Safety Function and Inoperability2023-06-23023 June 2023 Loss of Mechanical Draft Cooling Tower Fan Brakes During High Speeds Leads to Loss of Safety Function and Inoperability 05000341/LER-2023-001, Loss of Mechanical Draft Cooling Tower Fan Brakes During High Speeds Leads to Loss of Safety Function and Inoperability2023-05-22022 May 2023 Loss of Mechanical Draft Cooling Tower Fan Brakes During High Speeds Leads to Loss of Safety Function and Inoperability 05000341/LER-2022-004, Containment Isolation Valve Actuator Found Disconnected from Its Bonnet Resulting in Condition Prohibited by Technical Specifications2022-10-31031 October 2022 Containment Isolation Valve Actuator Found Disconnected from Its Bonnet Resulting in Condition Prohibited by Technical Specifications 05000341/LER-2022-003, Turbine Trip and Subsequent Reactor Trip Due to Mayflies2022-08-23023 August 2022 Turbine Trip and Subsequent Reactor Trip Due to Mayflies 05000341/LER-2022-002, Unexpected High Pressure Coolant Injection Turbine Trip2022-07-0606 July 2022 Unexpected High Pressure Coolant Injection Turbine Trip 05000341/LER-2022-001, Reactor Scram on Low Reactor Pressure Vessel Level2022-04-0404 April 2022 Reactor Scram on Low Reactor Pressure Vessel Level 05000341/LER-2021-002-01, Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure2022-03-15015 March 2022 Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure 05000341/LER-2021-003, High Pressure Coolant Injection Inoperable Due to Contact Oxidation2021-12-29029 December 2021 High Pressure Coolant Injection Inoperable Due to Contact Oxidation 05000341/LER-2021-002, Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure2021-10-21021 October 2021 Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure 05000341/LER-2017-0052017-11-0303 November 2017 Non-Functional Mechanical Draft Cooling Tower Fan Brakes Leads to HPCI Being Declared Inoperable and Loss of Safety Function, LER 17-005-00 for Fermi 2 Regarding Non-Functional Mechanical Draft Cooling Tower Fan Brakes Leads to HPCI Being Declared Inoperable and Loss of Safety Function 05000341/LER-2017-0042017-10-0909 October 2017 Inadequate Procedural Cuidance for Residual I feat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss if Safety Function, LER 17-004-00 for Fermi 2 Regarding Inadequate Procedural Guidance for Residual Heat Removal Complex Ventilation Systems Leads to Condition Prohibited by Technical Specifications and Loss of Safety Function 05000341/LER-2017-0032017-07-21021 July 2017 Division 2 Residual Heat Removal Service Water System (RHRSW) Inoperable Due to an Inoperable RHRSW Flow Control Valve, LER 17-003-00 for Fermi 2 Regarding Division 2 Residual Heat Removal Service Water System (RHRSW) Inoperable Due to an Inoperable RHRSW Flow Control Valve NRC-17-0040, (LER) SER 17-S01-00 for Fermi 2 Regarding Unescorted Access Granted for Individual Subsequent to Being Denied Unescorted Access at Another Nuclear Facility2017-05-15015 May 2017 (LER) SER 17-S01-00 for Fermi 2 Regarding Unescorted Access Granted for Individual Subsequent to Being Denied Unescorted Access at Another Nuclear Facility 05000341/LER-2017-0022017-03-16016 March 2017 High Water Level Indications at Low Reactor Pressures Causes Some Functions of High Pressure Coolant Injection System and Reactor Core Isolation Cooling System to be Inoperable, LER 17-002-00 for Fermi 2 Regarding High Water Level Indications at Low Reactor Pressures Causes Some Functions of High Pressure Coolant Injection System and Reactor Core Isolation Cooling System to be Inoperable 05000341/LER-2017-0012017-03-0606 March 2017 Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests due to Use of a Test Box, LER 17-001-00 for Fermi 2 Regarding Loss of Reactor Protection System Scram Function During the Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests due to Use of a Test Box 05000341/LER-2016-0012017-01-23023 January 2017 Turbine Stop Valve Closure and Turbine Control Valve Fast Closure Reactor Protection System Functions Considered Inoperable Due to Open Turbine Bypass Valves, LER 16-001-01 for Fermi 2 Regarding Turbine Stop Valve Closure and Turbine Control Valve Fast Closure Reactor Protection System Functions Considered Inoperable Due to Open Turbine Bypass Valves ML16138A3352016-05-17017 May 2016 ASP Screening Analysis - Reject Fermi Unit 2 (341-15-002) 05000341/LER-2016-0022016-03-22022 March 2016 Both Residual Heat Removal Low Pressure Coolant Injection Divisions Inoperable Due to Inoperable Injection Valve, LER 16-002-00 for Fermi 2, Regarding Both Residual Heat Removal Low Pressure Coolant Injection Divisions Inoperable Due to Inoperable Injection Valve NRC-13-0041, Submittal of Initial License Operator Examination2013-07-25025 July 2013 Submittal of Initial License Operator Examination NRC-09-0004, LER 08-S02-00 for Fermi 2 Regarding Fitness for Duty (FFD) Drug Testing Results in Reinstated Access Authorization Being Revoked2009-01-26026 January 2009 LER 08-S02-00 for Fermi 2 Regarding Fitness for Duty (FFD) Drug Testing Results in Reinstated Access Authorization Being Revoked NRC-08-0062, LER 08-S01-00 for Fermi 2 Regarding Unescorted Access Revoked Upon Discovery of Adverse Information2008-09-29029 September 2008 LER 08-S01-00 for Fermi 2 Regarding Unescorted Access Revoked Upon Discovery of Adverse Information ML0509505552004-12-17017 December 2004 Final Precursor Analysis - Fermi Grid Loop NRC-04-0083, LER 04-S02-00, Fermi 2 Unescorted Access Revoked Upon Discovery of Adverse Information in Background Check2004-11-0808 November 2004 LER 04-S02-00, Fermi 2 Unescorted Access Revoked Upon Discovery of Adverse Information in Background Check NRC-03-0020, LER 03-S01-00, Fermi 2, Unescorted Access Granted Prior to Verification of Fitness for Duty Drug Testing Results2003-03-0505 March 2003 LER 03-S01-00, Fermi 2, Unescorted Access Granted Prior to Verification of Fitness for Duty Drug Testing Results 2024-05-16
[Table view] |
LER-2021-002, Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure |
Event date: |
|
---|
Report date: |
|
---|
3412021002R00 - NRC Website |
|
text
Enclosure to NRC-21-0051
Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43
Licensee Event Report (LER) No. 2021-002 Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure
Abstract
At 0529 Eastern Daylight Savings Time (EDT) on August 22, 2021, while in Mode 1 at 100% power, alarms occurred for the Division 2 emergency diesel generator (EDG) load sequencer and the High Pressure Coolant Injection (HPCI) inverter circuit.
These issues led to Division 2 EDGs and HPCI being declared inoperable per Technical Specification (TS) 3.8.1 and TS 3.5.1, respectively. Subsequent failures of the Division 2 battery charger and inoperability of the Division 2 direct current (DC) electrical power distribution subsystem were identified under TS 3.8.4 and TS 3.8.7, respectively. The cause of the event is unknown.
However, the Division 2 battery charger was replaced with an available spare and the replacement of the power supplies for the load sequencer and HPCI inverter eliminated the problem and allowed for all the systems to be returned to service with no further issues by (or before) 0956 EDT on August 24, 2021. Other safety systems such as the Reactor Core Isolation Cooling (RCIC) system and Division 1 EDGs remained operable throughout the event. Although no violations of TS occurred, the unplanned inoperability of HPCI is a reportable condition. The safety significance of this event was determined to be very low and there were no radiological releases.
INITIAL PLANT CONDITIONS
Mode - 1 Reactor Power - 100%
There were no structures, systems, or components (SSCs) that were inoperable at the start of this event that contributed to this event.
DESCRIPTION OF THE EVENT
At 0529 Eastern Daylight Savings Time (EDT) on August 22, 2021, alarms [ALM] occurred for the Division 2 emergency diesel generator (EDG) [DG] load sequencer and the High Pressure Coolant Injection (HPCI) [BJ] inverter circuit. These issues led to Division 2 EDGs and HPCI being declared inoperable per TS 3.8.1, Alternating Current (AC) Sources -
Operating, Required Action B.4 and TS 3.5.1, Emergency Core Cooling Systems (ECCS) - Operating, Condition E.1, respectively. Offsite power circuits and Division 1 EDGs were verified to be operable in accordance with TS 3.8.1 Required Actions B.1 and B.3.1, respectively. The Reactor Core Isolation Cooling (RCIC) [BN] system was verified operable in accordance with TS 3.5.1 Required Action E.1.
The HPCI system and the EDG load sequencer are powered by the Division 2 battery. The initial investigation identified blown fuses associated with the power supplies of both the Division 2 EDG load sequencer and HPCI. The fuses were replaced but blew again. The blown replacement fuses were removed and additional troubleshooting activities were performed. During the subsequent troubleshooting activities, fluctuations were identified in the Division 2 battery charger
[BYC] in the direct current (DC) electrical power subsystem [EI]. The Division 2 battery charger was declared inoperable at 2223 EDT on August 22, 2021, and TS 3.8.4, DC Sources - Operating, Condition A was entered. Shortly thereafter, at 2331 EDT, the Division 2 DC electrical power distribution subsystem was also declared inoperable due to low voltage and TS 3.8.7, Distribution Systems - Operating, Condition B was entered. The battery charger was replaced with an available spare battery charger. Using the spare, the Division 2 battery charger was restored to an operable status at 0046 EDT on August 23, 2021 and TS 3.8.4 Condition A was exited. Replacement of the battery charger with the spare also stabilized voltage on the Division 2 DC electrical power distribution subsystem such that TS 3.8.7 Condition B was exited at 0055 EDT on August 23, 2021. The durations of the inoperabilities of the Division 2 battery charger and DC electrical power distribution subsystem were approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, respectively which were both within the TS allowable durations of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, respectively. No other safety-related systems were out of service during the event.
Following replacement of the Division 2 battery charger, the power supplies for the Division 2 EDG load sequencer and HPCI Inverter were replaced. The Division 2 EDG load sequencer was restored to service and the EDGs were declared operable at 2132 EDT on August 23, 2021. The duration of the Division 2 EDG inoperability was approximately 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> which was within the TS 3.8.1 Condition B allowance of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> since offsite power sources were available. HPCI was restored to service and declared operable at 0956 EDT on August 24, 2021. The duration of the HPCI inoperability was approximately 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> which was within the TS 3.5.1 Condition E allowance of 14 days since RCIC was operable. A review verified that the offsite power sources, Division 1 EDGs, and RCIC were operable during the entire event. All TS required actions were taken within the allowable times and no violation of TS occurred.
An 8-hour event notification (EN 55423) was made to the NRC on August 22, 2021 based on meeting the reporting criteria of Title 10 Code of Federal Regulations (10 CFR) 50.72(b)(3)(v)(D) since an unplanned HPCI inoperability is an event or condition that at the time of discovery could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident. This LER is being made under the corresponding criteria of 10 CFR 50.73(a)
(2)(v)(D); specifically, that the 52-hour unplanned inoperability of the HPCI system was an event or condition that could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident.
No reportability criteria were met for the EDGs, Division 2 battery charger, or Division 2 DC electrical power distribution subsystem.
SIGNIFICANT SAFETY CONSEQUENCES AND IMPLICATIONS
During the time HPCI was inoperable the RCIC system remained available for high pressure injection in the event of an emergency. The Standby Feedwater (SBFW) [SJ] system was also available for high pressure injection. Additionally, the Automatic Depressurization System (ADS) was available to reduce reactor pressure to within the capabilities of the low pressure Emergency Core Cooling Systems (ECCS) [BO][BM]. TS 3.5.1 allows HPCI to be taken out of service for up to 14 days provided that RCIC is available. The duration of the HPCI inoperability, although unplanned, was short relative to the allowable time. HPCI is required for design basis accidents such as a loss of coolant accident (LOCA). No accidents or transients requiring HPCI occurred or were in progress during the HPCI inoperability.
Offsite power was operable throughout the event, being supplied to both the 120 kV and 345 kV switchyards from the transmission network by five transmission lines. Division 1 of the onsite power sources (EDGs 11 and 12) remained operable throughout the event. Division 2 EDGs (EDGs 13 and 14) were declared inoperable due to the condition affecting the Division 2 EDG load sequencer. However, further review identified that the condition affecting the sequencer did not impact operation of the EDGs themselves. In the event of a loss of offsite power, EDGs 13 and 14 would still have started automatically and Division 2 loads would have been shed to prepare to accept the required loads. Due to failure of the sequencer, loads would not have automatically been added. However, with operator actions to close breakers (two per EDG), many of the ESF loads would then have been manually added as needed. These operator actions are performed from the Main Control Room (MCR) and are identified in existing Fermi 2 procedures which operators are trained to utilize. As a result, EDGs 13 and 14 were considered inoperable but available. In a postulated transient or accident where offsite power and the Division 1 EDGs were both lost, the Division 2 EDGs could still have been utilized with operator actions to supply power to required ESF loads.
Based on this discussion, the safety significance of this event is very low. There were no radiological releases associated with this event.
CAUSE OF THE EVENT
The cause of this event is unknown. During initial troubleshooting both the Division 2 EDG Automatic Load Sequencer power supply and HPCI Inverter were found to have a short between the positive and negative input terminals and the inputs remained isolated from the chassis.
During the troubleshooting of the charger's cycling voltage it was found that the phase "A" auxiliary transformer was having intermittent problems before it had a hard failure. It was turning on and off causing the silicone-controlled rectifiers (SCRs) to shut off. The voltage output of the transformer should be approximately 45v, but it was 0v while the primary side had 120v. The transformer was replaced with a new one and the battery charger functioned as expected and eventually was placed back into service.
The cause of this event is still under investigation. Failure analysis is being performed on the HPCI inverter, EDG sequencer power supply, and the 2B-2 battery charger auxiliary transformer to see what caused the failure of each device.
A preliminary report for both the HPCI inverter and EDG sequencer has been completed but still waiting on the final report.
The preliminary report for EDG sequencer found two switching transistors shorted and the HPCI inverter found five MOSFETs shorted and a possible capacitor disintegrated. A subject matter expert independent review will be performed to evaluate the failed components and associated 125V DC bus metering and ground fault detection circuits for possible circuit path that could result in tripped fuses.
CORRECTIVE ACTIONS
The failed components have been replaced but no cause was determined. The cause will be further explained in the final LER.
PREVIOUS OCCURRENCES
There have been previous occurrences of unplanned HPCI inoperability in the past several years, for example LERs 2018-005 and 2019-004. However, those occurrences were due to a support system, the Mechanical Draft Cooling Towers (MDCT), not being able to support operability of the Division 2 Emergency Equipment Cooling Water (EECW) system which is required for the operability of the HPCI room cooler. Therefore, the corrective actions taken to resolve those previous occurrences would not have prevented the issue described in this LER.
In addition, on 8/11/21 HPCI was declared inoperable (EN 55403) for a HPCI failure due to poor connections associated with the flow controller. EN55403 was recently retracted as HPCI was determined to be operable. The cause and corrective actions associated with EN55403 event were reviewed from the perspective of the event being report in this LER and it was determined that the two events were independent. Therefore, the corrective actions taken to resolve would not have prevented the issue described in this LER.