NRC-13-0041, Submittal of Initial License Operator Examination

From kanterella
Jump to navigation Jump to search
Submittal of Initial License Operator Examination
ML13207A372
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/25/2013
From: Rad Z
DTE Electric Company
To: Hironori Peterson
Operations Branch III
References
NRC-13-0041
Download: ML13207A372 (2)


Text

10 CFR 55.40 July 25, 2013 NRC-13-0041 Mr. Hironori Peterson Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) NRC letter dated March 11, 2013, "Fermi Power Plant Confirmation of Initial License Examination"

Subject:

Fermi 2 Initial License Operator Examination Enclosed please find the following examination material in preparation for the Fermi 2 Initial License Operator Examination scheduled to occur during the week of September 9, 2013:

" Modified Examination Outlines (modified during the examination development process)

" Seventy-five (75) written examination items for the Reactor Operator examination

" Twenty-five (25) written examination items for the Senior Reactor Operator examination

" Eleven (11) Plant Systems related Job Performance Measures

. Eight (8) Administrative topic Job Performance Measures

. Two (2) Simulator Scenarios

" Supporting Reference Material

- Quality Verification Checklists from NUREG 1021, Revision 9.

USNRC NRC-13-0041 Page 2 The examination material was developed using the appropriate guidance contained in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"

Revision 9, Supplement 1. The examination material shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or conments regarding the contents of the items listed above, please contact Mr. David G. Coseo, General Supervisor, Operations Training, at (734) 586-4055.

Sincerely, Zackary W. Rad Enclosures cc: [w/o Enclosures]

NRC Project Manager Reactor Projects Chief, Branch 5, Region III NRC Resident Office Document Control Desk Washington D C