ENS 55423

From kanterella
Jump to navigation Jump to search
ENS 55423 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
LER: 05000341/LER-2021-002
Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure
05000341/LER-2021-002-01
Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure
Time - Person (Reporting Time:+2.68 h0.112 days <br />0.016 weeks <br />0.00367 months <br />)
Opened: Whitney Hemingway
12:10 Aug 22, 2021
NRC Officer: Thomas Kendzia
Last Updated: Aug 22, 2021
55423 - NRC Website
Loading map...