05000272/LER-1999-006-02, :on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With1999-08-26026 August 1999
- on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With
ML18107A5201999-08-12012 August 1999
Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO 9) Second Interval,Second Period, First Outage (96RF)
LR-N99-0380, Monthly Operating Rept for July 1999 for Salem,Unit 2.With1999-07-31031 July 1999
Monthly Operating Rept for July 1999 for Salem,Unit 2.With
LR-N99-0379, Monthly Operating Rept for July 1999 for Salem,Unit 1.With1999-07-31031 July 1999
Monthly Operating Rept for July 1999 for Salem,Unit 1.With
05000311/LER-1999-008, :on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With1999-07-28028 July 1999
- on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With
ML20210B7371999-07-21021 July 1999
Safety Evaluation Supporting Amends 223 & 204 to Licenses DPR-70 & DPR-75,respectively
ML18107A4411999-07-0909 July 1999
SER Denying Licensee 980730 & 990222 Requests to Revise TS 3/4.7.6, Control Room Emergency Air Conditioning Sys, & Associated Bases to Change Acceptable Criteria for Control Room Emergency Air Conditioning System
05000311/LER-1999-007, :on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With1999-07-0606 July 1999
- on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With
05000272/LER-1999-005-02, :on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With1999-07-0202 July 1999
- on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With
05000311/LER-1999-006, :on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With1999-07-0101 July 1999
- on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With
05000311/LER-1999-002, :on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With1999-07-0101 July 1999
- on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With
ML18107A5211999-07-0101 July 1999
Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO 10) Second Interval,Second Period,Second Outage (99RF)
LR-N99-0324, Monthly Operating Rept for June 1999 for Salem,Unit 1.With1999-06-30030 June 1999
Monthly Operating Rept for June 1999 for Salem,Unit 1.With
ML20196H8621999-06-30030 June 1999
NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept
LR-N99-0325, Monthly Operating Rept for June 1999 for Salem,Unit 2.With1999-06-30030 June 1999
Monthly Operating Rept for June 1999 for Salem,Unit 2.With
ML18107A3931999-06-23023 June 1999
Safety Evaluation Supporting Licensee Response to GL 95-07
ML18107A4161999-06-23023 June 1999
Safety Evaluation Accepting Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions
05000272/LER-1999-004-02, :on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With1999-06-17017 June 1999
- on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With
ML18107A3751999-06-15015 June 1999
Safety Evaluation Accepting Licensee Request for Approval of Proposed Changes to Nuclear Business Unit EP for Hope Creek & Salem Generating Stations,Iaw 10CFR50.54(q)
05000272/LER-1999-003-02, :on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With1999-06-0909 June 1999
- on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With
05000311/LER-1999-005-01, :on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With1999-06-0202 June 1999
- on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With
ML18107A3441999-06-0101 June 1999
Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716
LR-N99-0278, Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With1999-05-31031 May 1999
Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With
LR-N99-0275, Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With1999-05-31031 May 1999
Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With
ML18107A3111999-05-21021 May 1999
SER Accepting GL-88-20,suppl 4, IPEEEs for Severe Accident Vulnerabilities, for Plant,Units 1 & 2
05000272/LER-1999-002-02, :on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With1999-05-12012 May 1999
- on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With
05000311/LER-1999-004-01, :on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With1999-05-10010 May 1999
- on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With
05000311/LER-1999-003-01, :on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With1999-05-0404 May 1999
- on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With
ML20206H2631999-05-0404 May 1999
Safety Evaluation Supporting Amend 222 to License DPR-70
05000311/LER-1999-002-01, :on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With1999-05-0303 May 1999
- on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With
ML18107A3151999-04-30030 April 1999
Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1
LR-N99-0225, Monthly Operating Rept for Apr 1999 for Salem Unit 1.With1999-04-30030 April 1999
Monthly Operating Rept for Apr 1999 for Salem Unit 1.With
ML18107A3711999-04-30030 April 1999
Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1
LR-N99-0226, Monthly Operating Rept for Apr 1999 for Salem Unit 2.With1999-04-30030 April 1999
Monthly Operating Rept for Apr 1999 for Salem Unit 2.With
ML20206B4761999-04-26026 April 1999
Safety Evaluation Supporting Amends 220 & 202 to Licenses DPR-70 & DPR-75,respectively
05000311/LER-1999-001-03, :on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With1999-04-23023 April 1999
- on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With
ML18107A1791999-04-15015 April 1999
Safety Evaluation Supporting Changes to QA Program in That QA Program Continues to Meet Requirements of App B to 10CFR50
ML18107A2881999-04-0707 April 1999
Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11
ML18107A1601999-04-0707 April 1999
Safety Evaluation Accepting Request for Exemption from Update Requirements of 10CFR50.71(e)(4)
ML18106B1461999-04-0101 April 1999
SER Accepting Util Proposed Request to Use 1992 Edition of ASME Boiler & Pressure Vessel Code,Section Xi,Article, IWA-4500,for Potential Repair of Feedwater Nozzles for Salem Nuclear Generating Station,Unit 2
LR-N99-0176, Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With1999-03-31031 March 1999
Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With
LR-N99-0177, Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With1999-03-31031 March 1999
Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With
05000272/LER-1999-001-02, :on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with1999-03-29029 March 1999
- on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with
05000272/LER-1999-001-01, :on 990228,reactor Scram Resulted in Turbine Trip.Caused by Personnel Error.Revised Lesson Plans to Explicitly Demonstrate Manner in Which Valve Functions. with1999-03-29029 March 1999
- on 990228,reactor Scram Resulted in Turbine Trip.Caused by Personnel Error.Revised Lesson Plans to Explicitly Demonstrate Manner in Which Valve Functions. with