Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr
ML18106B056
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/31/1999
From: Bakken A, Knieriem R
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N99-0081, LR-N99-81, NUDOCS 9902170353
Download: ML18106B056 (4)


Text

... . e OPS~G P~blic Ser.vice Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit LR-N99-0081 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk MONTHLY OPERA TING REPORT SALEM UNIT NO. 2 DOCKET NO. 50-311 Gentlemen:

In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original Monthly Operating report for January 1999 is attached. I Sincerely, A. C. Bakken Ill General Manager -

Salem Operations

/rbk Enclosures C Mr. H. J. Miller Regional Administrator USNRC, Region 1 475 Allendale Road

-~!nJ_:9!fffJ:!~~~*_PA_!9_04~ _______ .

,- ---- 9902170353 990131 PDR ADOC~ 05000311 .

R PDR . ~

l he power is myour hands.

95-2168 REV. 6/94

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 2/15/99 COMPLETED BY: R. Knieriem TELEPHONE: (609) 339-1782 Reporting Period: January 1999 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1115 Maximum Dependable Capacity (MWe-Net) 1106 Month Year-to-date Cumulative No. of hours reactor was critical 744 744 89362 No. of hours generator was on line (service 744 744 86095 hours)

Unit reserve shutdown hours 0.0 0.0 0.0 Net Electrical Energy (MWH) 821484 821484 85794315 UNIT SHUTDOWNS NO DATE TYPE DURATION REASON METHOD OF CORRECTIVE F=FORCED (HOURS) ( 1) SHUTTING ACTION/COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F -Administrative G - Operational Error (Explain)

H - Other Summary:

Salem Unit 2 operated at full power throughout the month of January 1999.

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 2/15/99 COMPLETED BY: R. B. Knieriem TELEPHONE: (609) 339-1782

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS FOR THE SALEM UNIT 2 GENERATING STATION MONTH: January 1999 The following items completed during January 1999 have been evaluated to determine:

1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
3. If the margin of safety as defined in the basis for any technical specification is reduced.

The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant; nor did they affect the safe shutdown of the reactor. These items did not change the plant effluent releases and did not alter the existing environmental impact. The 10CFR50.59 Safety Evaluations determined that no unreviewed safety or environmental questions are involved.

Design Changes - Summary of Safety Evaluations Minor Modification S97-016, 2B Emergency Diesel Generator (EOG) Turbo Boost Air Pressure Low Alarm and EOG Turbo Boost Air Receiver Pressure Switch Setpoint Change This minor modification raised the 28 EOG turbo boost air pressure low alarm setpoint from 190 psig to 206 psig. This change will provide additional margin to assure that air pressure will be available for the loading of the EOG in all plant modes.

This change was reportable under 10CFR50.59 because the setpoint of the turbo boost low-pressure alarm is described in the UFSAR. This change did not increase the probability or the consequences of an accident previously evaluated in the SAR, nor increase the probability of occurrence or the consequences of a malfunction of equipment important to safety. The turbo boost air pressure low alarm provides indication only and does not provide any control function related to the EOGs. This change supports the availability of the 28 EOG by providing operators with an earlier warning of EOG turbo boost air receiver low-pressure conditions. The change did not increase the possibility of an accident of a

('

different type from any previously evaluated in the SAR because no new failure modes were created by the change. Finally, the change did not affect the margin of safety, as defined in the Technical Specification Bases.

Temporary Modifications - Summary of Safety Evaluations There were no changes in this category implemented during January 1999.

Procedures - Summary of Safety Evaluations Radiation Protection Program Procedure, NC.NA-AP .ZZ-0024(Q), Revision 9 This procedural change was made to align the Radiation Protection Program procedure with the current organizational structure of the Nuclear Business Unit.

In addition, minor changes were made to reflect changes to 10 CFR 20 that changed the doses to minors and pregnant members of the public to 0.1 rem, making the doses consistent with doses to other members of the public.

This change did not increase the probability or the consequences of an accident previously evaluated in the SAR. The change did not increase the probability of occurrence or the consequences of a malfunction of equipment important to safety because no changes were made to any system or component required to safely operate or to shut down the reactor. The change did not increase the possibility of an accident of a different type from any previously evaluated in the SAR because no new failure modes were created by the change. Finally, the change did not affect the margin of safety, as defined in the Technical Specification Bases.

UFSAR Change Notices - Summary of Safety Evaluations There were no changes in this category implemented during January 1999.

Deficiency Reports - Summary of Safety Evaluations There were no changes in this category implemented during January 1999.

Other - Summary of Safety Evaluations There were no changes in this category implemented during January 1999.