Forwards LER 82-093/01T-0.Detailed Event Analysis Encl
ML20065F827
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/16/1982
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20065F835 List:
References
NUDOCS 8210010419
Download: ML20065F827 (4)


LER-2082-093, Forwards LER 82-093/01T-0.Detailed Event Analysis Encl
Event date:
Report date:
3112082093R00 - NRC Website

text

~

D PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station September 16, 1982 Mr. R. C. Haynes Regional Administrator USNRC Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Haynes:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 82-093/0lT Pursuant to the requirements of Salem Generating Station Unit No. 2, Technical Specifications, Section 6.9.1.8.c, we are submitting Licensee Event Report for Reportable Occurrence 82-093/0lT. This report is required within fourteen (14) days of the occurrence.

Sincerely yours,

/k 'k H. J. Midura General Manager -

Salem Operations RH:ksg,f CC: Distribution 8210010419 820916 PDR ADOCK 05000311 S PDR The Energy People. pqh" w nw ren n e, 6 -

Report Number: 82-093/0lT Report Date: 09-16-82 Occurrence Date: 09-10-82 Facility: Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 0J038 IDENTIFICATION OF OCCURRENCE:

Containment Service Water Leak - No. 21 Containment Fan Coil Unit - Inoperable.

This report was initiated by Incident Report 82-265.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 25% - Unit Load 180 MWe.

DESCRIPTION OF OCCURRENCE:

At 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />, September 10, 1982, during routine surveillance, an operator discovered a service water leak on No. 21 Contain-ment Fan Coil Unit (CFCU). No. 21 CFCU was declared inoperable and was isolated, and Limiting Condition for Operation Action Statement 3.6.2.3a was entered at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />. In accordance with NRC IE Bulletin 80-24, the NRC was notified by telephone at 0635 hours0.00735 days <br />0.176 hours <br />0.00105 weeks <br />2.416175e-4 months <br />, with written confirmation transmitted on September 10, 1982. Both containment spray systems were operable throughout the occurrence.

DE!jIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Irvestigation of the problem showed that the leakage was due t ., failure of the cooling coils. The coils are fabricated of copper nickel alloy which is susceptible to erosion by silt laden service water. Similar failures of other CFCU's have been noted, with most leaks occurring at bends where erosion is more significant. '

ANALYSIS OF OCCURRENCE:

Primary containment is a design feature which ensures that the release of radioactive materials in the event of accident l conditions will be restricted such that site boundary radiation doses will be within the limits of 10CFR100.

l l

i l

l l

LER 82-093/01T ANALYSIS OF OCCURRENCE: (continued)

NRC IE Bulletin 80-24 requires that any service water leak inside the containment be considered as a degradation of the containment boundary. If containment pressure increased to the design pressure of 47 psig during an accident, there is a possibility of the release of radioactive materials through the service water discharge. The occurrence therefore consti-tutes an abnormal degradation of the primary containment and is reportable in accordance with Technical Specification v 6.9.1.8.c.

The CFCU's operate in conjunction with the containment spray systems to remove heat and radioactive contamination from the containment atmosphere in the event of a design basis accident.

Operability of either all fan coil groups or of both contain-ment spray systems is necessary to ensure offsite radiation dose is maintained within the limits of 10CFR100.

Because the leakage was immediately isolated, containment integrity was maintained. Redundant containment cooling capability was provided by the containment spray systems.

The occurrence therefore involved no risk to the health or l safety of the public.

l l Due to the inoperability of the CFCU, the event constituted operation in a degraded mode permitted by a limiting condition for operation. Action Statement 3.6.2.3a requires: with one group of containment cooling fans inoperable, restore the inoperable group of cooling fans to operable status within the j next 7 days, or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

CORRECTIVE ACTION:

As noted, the leak was isolated and prompt notification was made to the NRC in accordance with NRC IE Bulletin 80-24. The leaking coil was blanked off and No. 21 CFCU was satisfactorily tested. At 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br />, September 11, 1982, No. 21 CFCU was declared operable, and Limiting Condition for Operation Action Statement 3.6.2.3a was terminated.

Design Change Request 2EC-0505 has been issued to replace the CFCU cooling coils with coils manufactured of AL-6X steel, for improved erosion and corrosion resistance in the service water environment. This change is scheduled for implementation during the next refueling outage. A commitment to submit a Supplemental Report upon completion was made in LER 82-070/0lT.

. LE.R 82-093/OlT FAILURE DATA:

- A number of containment service water-leaks due to similar failures of CFCU cooling coils have occurred since January.

1, 1982.

Westinghouse Electric Corporation Containment Fan Coil Unit U-Tube Cooling Coil 1

. Prepared By R. Heller / 9 x) _/

' General Manager -

, Salem Operations SORC Meeting No. 82-84' 1

.-