Forwards LER 82-010/03L-0.Detailed Event Analysis Encl
ML20041F340
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/03/1982
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20041F341 List:
References
NUDOCS 8203160409
Download: ML20041F340 (3)


LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111982010R00 - NRC Website

text

,

O PSIEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station March 3, 1982 o

k Mr.

R.

C.

Ilaynes 8

Regional Administrator REC EO

'3 USNRC MARJ5IbO2h j/

Region 1 631 Park Avenue um King of Prussia, Pennsylvania 19406 9

mr Q p

  1. /

Dear Mr. tiaynes:

'b 16 LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 82-10/03L Pursuant to the requirements of Salem Generating Station Unit No.

2, Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 82-10/03L.

Thi s report is required within thirty (30) days of the occurrence.

Sincerely yours, d-I W e H.

J.

Midura General Manager -

Salem Operations g FD:al CC:

Distribution B203160409 820303 PDR ADOCK 05000311 S

PDR n

l The Energy People

Report Number:

82-10/03L Report Date:

03-03-82 Occurrence Date:

02-01-82 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Individual Rod Position Indication - 2C2 - Inoperable.

This report was initiated by Incident Report 82-028.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 96% - Unit Load 1100 MWe DESCRIPTION OF OCCURRENCE:

On February 1, 1982, the control operator noticed that the Individual Rod Position Indicator (IRPI) and Control Rod Bank Demand Indicator for Rod 2C2 werk in disagreement by greater than + 12 steps.

The IRPI was declared inoperable at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />, and Action Statement 3.1.3.2.1.a was entered.

This occurrence constituted operation in a degraded mode in accordance with Technical Specification 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The IRPI had drifted out of calibration.

ANALYSIS OF OCCURRENCE:

~

Technical Specification 3.1.3.2.1.a requires that in modes 1 and 2 with a maximum of one rod position indicator per bank inoperable eitner:

1.

Determine the position of the non-indicating rod (s) indirectly by the movable ince e detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and immediately after any motion of the non-indicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or 2.

Reduce thermal power to less than 5,% of rated thermal power within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

J LER 82-10/03L 2-J i

i

CORRECTIVE ACTION

.The IRPI was properly recalibrated and tested satisfactorily.

i At 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br />, the IRPI-for Rod 2C2 was declared operable and Action Statement 3.1.3.2.1.a was terminated.

i FAILURE DATA:

Bailey' Instrument Co.,

Inc.

Bailey Edgewise Indicator Model RY2 i '

k i'

i f

l l

J (b'

Prepared By F.

Dickey

- %h General Manager _ ~

Salem Operations i

SORC Meeting No.

82-24 i

3 1

4 t

r 4

J

,.7-

.v---ww.v,-

-,w-,

,,m-,

,c-vm

-,,r-m

%,-,m--

e,--.,-

, - -.-,,,7y,-

.-_,--,my-s,...,

. - - - = ~, _