Finding | |
---|---|
Title | Failure to Recognize Adverse Design Changes |
Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, associated with the licensees failure to maintain design control of the auxiliary feedwater system. Specifically, the licensee implemented a modification to the facility that placed vent holes in the steam supply line guard piping for the steam driven auxiliary feedwater pump which were located below the evaluated flood height in Room 81 and potentially rendered the pump inoperable. The licensee implemented a facility modification to protect the vent holes from water intrusion. The licensee entered this deficiency into their corrective action program for resolution as Condition Reports CR 2013-18308 and CR 2013-18605. The failure to ensure that design requirements were correctly translated into installed plant equipment was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it was associated with the design control attribute of the Mitigating Systems Cornerstone and affected the associated objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensees failure to translate the design requirements into installed plant equipment resulted in a condition where the steam driven auxiliary feedwater pump may not have been able to perform its specified safety function. The team evaluated the finding using Inspection Manual Chapter (IMC) 0609, Appendix A, The Significance Determination Process (SDP) for Findings at Power, dated June 19, 2012, and determined that this finding required a detailed risk evaluation because the turbine driven auxiliary feedwater pump was inoperable for longer than the technical specification allowed outage time. A regional senior reactor analyst performed a detailed risk evaluation and determined this finding to be of very low safety significance (Green) because the bounding change to the core damage frequency was approximately 1.2E-9/year. The dominant core damage sequences included feedwater and main steam line breaks with the consequential failure of the turbine driven auxiliary feedwater pump combined with other random failures of Train A and B equipment trains. Equipment that helped mitigate the risk included the diesel driven and motor-driven auxiliary feedwater pumps, which remained functional for the vast majority of sequences. This finding has a cross-cutting aspect in the area of human performance associated with the decision-making component because the licensee failed to use conservative assumptions in decision-making and adopt a requirement to demonstrate that the proposed action is safe in order to proceed rather than a requirement to demonstrate it is unsafe in order to disapprove the action. |
Site: | Fort Calhoun ![]() |
---|---|
Report | IR 05000285/2013018 Section 1R18 |
Date counted | Dec 31, 2014 (2014Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.18 |
Inspectors (proximate) | A Vegel C Smith J Josey J Wingebach N Patel T Lighty |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |