| Q | CCA | Title |
---|
05000285/FIN-2013009-05 | 2013Q3 | | Submittal of Leak-Before-Break Analysis |
05000285/FIN-2013009-04 | 2013Q3 | | Thermal Aging Embrittlement of CASS Nozzles in the Reactor Coolant System |
05000285/FIN-2013009-03 | 2013Q3 | | Flaw Tolerance Evaluation for Thermal Aging Embrittlement of CASS Components |
05000285/FIN-2013009-02 | 2013Q3 | | Evaluation of Operating Cycles for Fatigue Monitoring Program |
05000285/FIN-2013009-01 | 2013Q3 | | Evaluation of Environmentally-Assisted Fatigue for Charging Line Nozzle |
05000285/FIN-2013201-01 | 2013Q4 | P.2 | Security |
05000285/FIN-2013019-01 | 2013Q4 | P.3 | Failure to Correct Deficiencies in Operations Support Center Functions |
05000285/FIN-2014407-01 | 2013Q4 | | Security |
05000285/FIN-2014404-05 | 2014Q1 | | Security |
05000285/FIN-2014404-04 | 2014Q1 | | Security |
05000285/FIN-2014404-03 | 2014Q1 | | Security |
05000285/FIN-2013017-01 | 2014Q1 | P.2 | Failure to Ensure Tornado Missile Protection for Site Components |
05000285/FIN-2014002-01 | 2014Q1 | | Failure to Make Required 10 CFR 50.46 Report Within Required Time |
05000285/FIN-2014002-02 | 2014Q1 | | Failure to Translate HPSI Pump Design Requirements to Design Documents (Section 4OA3.2) |
05000285/FIN-2014002-03 | 2014Q1 | | Failure to Maintain Design Control of HPSI Injection Valve |
05000285/FIN-2014002-04 | 2014Q1 | H.9 | Failure to Request a License Amendment for Required Change to Technical Specifications |
05000285/FIN-2014002-08 | 2014Q1 | | Failure to Adequately Design Anchorage for Containment Spray and Raw Water System Pipe Supports |
05000285/FIN-2014002-09 | 2014Q1 | | Failure to Adequately Implement Design Requirements for Containment Air Cooler Pipe Supports |
05000285/FIN-2014007-01 | 2014Q1 | H.9 | Failure to Follow Procedures for Classifying Component Failures |
05000285/FIN-2014007-02 | 2014Q1 | H.7 | Failure to follow an immediate operability determination procedure |
05000285/FIN-2014007-03 | 2014Q1 | P.2 | Failure to implement an adequate PMT procedure |
05000285/FIN-2014007-04 | 2014Q1 | H.9 | Failure to perform an immediate operability determination |
05000285/FIN-2014007-05 | 2014Q1 | | Failure to correct conditions adverse to quality in the containment internal structure and auxiliary building |
05000285/FIN-2014007-06 | 2014Q1 | H.6 | Failure to check the adequacy of the design for the Reactor Vessel Head structural elements |
05000285/FIN-2013013-04 | 2014Q1 | | Failure to Submit Licensee Event Report |
05000285/FIN-2013017-05 | 2014Q1 | | Failure to Obtain Prior NRC Approval for a Change in Method of Evaluation |
05000285/FIN-2014002-05 | 2014Q1 | | Untimely Submittal of Required Licensee Event Reports |
05000285/FIN-2013013-22 | 2014Q1 | | Shutdown Cooling Piping and Pipe Supports Calculation Has Incorrect Acceptance Criteria for Anchor Displacement |
05000285/FIN-2013013-17 | 2014Q1 | P.2 | Failure to Translate Design Sluice Gate Leakage Into Operating Procedure |
05000285/FIN-2013013-02 | 2014Q1 | H.7 | Failure to Furnish Evidence of an Activity Affecting Quality |
05000285/FIN-2013013-05 | 2014Q1 | P.2 | Inadequate Corrective Actions to Prevent Repetition of a Significant Condition Adverse to Quality, a White MSPI SSFF Degrading Trend |
05000285/FIN-2013013-06 | 2014Q1 | | Failure to Control Deviations From the Design Basis Requirements for Structural Calculations Related to the Reactor Coolant System |
05000285/FIN-2013013-07 | 2014Q1 | H.8 | Programmatic Failure to Evaluate Safety Impact of Degraded Conditions During Use of Interim Operability Criteria |
05000285/FIN-2013013-08 | 2014Q1 | P.1 | Failure to Correct Overstressed Components |
05000285/FIN-2013013-09 | 2014Q1 | | Non-conservative Criteria in Operability Procedure |
05000285/FIN-2013013-10 | 2014Q1 | H.14 | Failure to Follow Operability Procedure |
05000285/FIN-2013013-11 | 2014Q1 | H.14 | Failure to Evaluate the Effects of Modifying the Turbine Driven Auxiliary Feedwater Pump |
05000285/FIN-2013013-12 | 2014Q1 | P.5 | Failure to Perform Adequate Operating Experience Reviews |
05000285/FIN-2013013-13 | 2014Q1 | P.2 | Failure to Incorporate Design Requirements for Switchgear Room Cooling |
05000285/FIN-2013013-14 | 2014Q1 | H.14 | Inadequate Corrective Action for Non-Seismic Category 1 Piping |
05000285/FIN-2013013-15 | 2014Q1 | P.2 | Lack of an Adequate Operability Evaluation for Class 1 Raw Water Piping in Non-Class 1 Service Building |
05000285/FIN-2013013-16 | 2014Q1 | H.5 | Inadequate Operability Determination Due to Failure to Consider an Unavailable Raw Water Pu |
05000285/FIN-2013013-01 | 2014Q1 | H.1 | Failure to Complete all Testing for a Condition Adverse to Quality |
05000285/FIN-2013013-18 | 2014Q1 | P.2 | Inadequate Procedure for Intake Cell Level Control During a Flooding Event |
05000285/FIN-2013013-19 | 2014Q1 | | Failure to Translate Appendix R license Exemptions into the Plants Fire Protection Program Design |
05000285/FIN-2013013-20 | 2014Q1 | | Failure to Provide Complete and Accurate Information to the NRC |
05000285/FIN-2013013-21 | 2014Q1 | P.2 | Failure to Perform Adequate Extent of Condition Reviews |
05000285/FIN-2013017-02 | 2014Q1 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality |
05000285/FIN-2013017-03 | 2014Q1 | H.14 | Failure to Follow Operability Procedure |
05000285/FIN-2013017-04 | 2014Q1 | H.2 | Inadequate Temporary Modification to Protect Against Tornado Generated Missiles |