IR 05000285/2014405

From kanterella
Jump to navigation Jump to search
IR 05000285-14-405, 05/30/2014, Fort Calhoun, NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7.
ML14176B202
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/25/2014
From: John Dixon
NRC/RGN-IV/DRS/EB-2
To: Cortopassi L
Omaha Public Power District
G. Pick
References
IR-14-405
Download: ML14176B202 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION une 25, 2014

SUBJECT:

FORT CALHOUN STATION - NRC TEMPORARY INSTRUCTION 2201/004, INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7, INSPECTION REPORT 05000285/2014405

Dear Mr. Cortopassi:

On May 30, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a cyber security inspection at your Fort Calhoun Station. The inspection covered the implementation of interim milestones associated with your cyber security program, as outlined in your approved cyber security plan and described in Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7. The enclosed inspection report documents the inspection results, which were discussed on May 30, 2014, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to cyber security and compliance with the Commissions rules and regulations and conditions of your license.

The team reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the NRC has identified three findings that were evaluated under the risk significance determination process as having very low significance.

The team also documented two licensee-identified violations that were determined to be of very low significance in Section 4OA7 of this report. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy. In accordance with the Security Issues Forum Charter, the NRC can exercise enforcement discretion during inspection of the interim cyber security measures for licensees who demonstrate a good-faith attempt to implement Milestones 1-7. This discretion applies to licensees who have tried to implement the new requirements but failed to be in full compliance. The issues identified in this report were discussed and reviewed during the Security Issues Forum meeting conducted on May 28, 2014. The results of the Security Issues Forum panel review concluded that although these issues constitute violations of 10 CFR 73.54, the NRC is not pursuing enforcement action because of your good-faith attempt to interpret and implement Milestones 1-7 and because of -2-your prompt actions to enter these issues into your corrective action program. As described in Enclosure 1 of NRC Enforcement Guidance Memorandum, Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for Good-Faith Attempt Discretion, dated July 1, 2013, Omaha Public Power District is requested to provide written notification to the NRCs regional office when the corrective actions for the identified issues have been completed and closed.

If you contest the violations or significance of these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Fort Calhoun Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

John L. Dixon, Jr, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket: 50-285 License: DPR-40 cc w/o enclosure:

Electronic Distribution to Fort Calhoun Station: ML14176B202 Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: __GAP_

OFFICE SRI:EB2 RI:EB2 SRA:NSIR SRA:NSIR CSC:HQ C:PF C:EB2 NAME GPick\tk SMakor SOpara DJohnson JKnight MHay JDixon SIGNATURE /RA/ /E/ /E/ /E/ /E/ /RA/ /RA/

DATE 6/18/14 6/17/14 6/17/14 6/11/14 6/14/14 6/23/14 6/25/14 Report to Lou Cortopassi from John Dixon SUBJECT: FORT CALHOUN STATION - NRC TEMPORARY INSTRUCTION 2201/004, INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7, INSPECTION REPORT 05000285/2014405 RIV Distribution without enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Senior PE, DRP/F (Peter.Jayroe@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Janise.Schwee@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Joseph.Sebrosky@nrc.gov)

RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Chen.Yen-Ju@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4ACES@nrc.gov)

MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)

MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)

MC 0350 Panel Member (Michael.Balazik@nrc.gov)

MC 0350 Panel Member (Michael.Markley@nrc.gov)

ROPreports