Finding | |
---|---|
Title | Failure to Adequately Design Anchorage for Containment Spray and Raw Water System Pipe Supports |
Description | During a previous inspection, the NRC reviewed multiple calculations for pipe supports on the raw water and containment spray systems and found that the calculations had several errors related to the design requirements for anchorage. The NRC issued an apparent violation AV 05000285/2013012-08, Failure to adequately design anchorage for containment spray and raw water system pipe supports in NRC Inspection Report 05000285/2013-012 (ML 13144A772). The licensee performed an operability determination for the affected calculations and found that the anchorage for the raw water and containment spray piping supports were operable. The NRC reviewed the evaluations and concluded that reasonable assurance of operability existed for the affected components. The inspectors determined that the failure to ensure adequacy of the anchorage of the aforementioned Containment Spray Pipe Supports and Raw Water Pipe Supports was not in accordance with design basis requirements and was a performance deficiency. The performance deficiency was determined to be more than minor because it required calculations to be re-performed to prove the system was operable, and it was associated with the Mitigating Systems cornerstone attribute of design control and affected the cornerstone objective of ensuring the availability, reliability, and capability of the containment spray system and raw water system. Using Inspection Manual Chapter 0609, Attachment 4 Initial Characterization of Findings, and Appendix A The Significance Determination Process (SDP) for findings at-power, both dated 6/19/12, the inspectors determined the performance deficiency affected the mitigating systems cornerstone and screened to Green because the finding affected the design and qualification of a mitigating SSC but remained operable. The inspectors used the at-power SDP because the condition existed since construction and while the plant was predominantly at power. The inspectors determined there was no cross-cutting aspect associated with this finding because the calculations were from the 1980s and therefore were not reflective of current performance. Title 10 CFR Part 50, Appendix B, Criterion III, Design Control states, in part, that the design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Contrary to this requirement the inspectors identified that calculations FC00607, FC01785, FC01786, FC01791, FC01864, FC01691, FC01902, FC02409, FC02412, FC04228, FC02433, FC02436, and FC02425 for the raw water and containment spray systems failed to ensure adequacy of the design. Specifically, these anchorage calculations did not conform to applicable design requirements from approximately 1980 until June 2013. The licensee entered these issues into the corrective action program as CR 2013-05304 and performed an operability determination as immediate actions. Long term actions to resolve the errors in the calculations are also implemented by the referenced CR. This violation is being treated as an NCV, consistent with Section 2.3.2.a of the Enforcement Policy. |
Site: | Fort Calhoun |
---|---|
Report | IR 05000285/2014002 Section 4OA5 |
Date counted | Mar 31, 2014 (2014Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | A Guzzetta A Sallman J Kirkland J Wingebach M Chambers M Farnan M Hay N Taylor W Lyon W Smith |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |