Forwards LER 94-004 Re Loss of Voltage Relays Not Calibr to TS Limits
ML20082T017
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/27/1995
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082T020 List:
References
VPNPD-95-041, VPNPD-95-41, NUDOCS 9505030329
Download: ML20082T017 (1)


LER-2094-004, Forwards LER 94-004 Re Loss of Voltage Relays Not Calibr to TS Limits
Event date:
Report date:
2662094004R00 - NRC Website

text

V

. c<.

Wisconsin ,

Electnc POWER COMPANY 231 W Michgan. PO Box 2046. Mdwoukee.WI S3201-2046 (414)221 2345 VPNPD-95-041 NRC-95-027

April 27, 1995 Document Control Desk '

U.S. NUCLEAR REGULATORY COMMISSION Mail Station F1-137 '

Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 LICENSE EVENT REPORT 95-004-00 LOSS OF VOLTAGE RELAYS NOT CALIBRATED TO TECHNICAL SPECIFICATION LIMITS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed is License Event Report 95-004-00 for Point Beach Nuclear Plant, Units 1 and 2. This report is provided in cccordance with 10 CFR 50.73 (a) (2) (i) , "Any operation or condition prohibited by the plant's Technical Specifications." This report describes a condition in which the setpoints for the loss of voltage relays i for a 4160 volt safeguards bus did not meet Point Beach Technical Specification requirements.

If you require additional information, please contact us.

Sincerely, Bob Link Vice President Nuclear Power KVA/jg Attachment cc: NRC Resident Inspector NRC Regional Administrator, Region III  ;

l 9505030329 950427 PDR ADDCK 05000266 S FDR ,