05000206/LER-1998-001, Forwards LER 98-001-00 Which Provides 30-day follow-up Rept Required by 10CFR73.71(d) for Security Computer Sys Being Inoperable for Few Minutes

From kanterella
Jump to navigation Jump to search
Forwards LER 98-001-00 Which Provides 30-day follow-up Rept Required by 10CFR73.71(d) for Security Computer Sys Being Inoperable for Few Minutes
ML20202F262
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/12/1998
From: Krieger R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202F266 List:
References
NUDOCS 9802190164
Download: ML20202F262 (1)


LER-2098-001, Forwards LER 98-001-00 Which Provides 30-day follow-up Rept Required by 10CFR73.71(d) for Security Computer Sys Being Inoperable for Few Minutes
Event date:
Report date:
2062098001R00 - NRC Website

text

. _ - - - - _ - - - _ - - _ - - _ - - - - - . .

O -h 50VIHtRN CAtlFORN14 R. W. Krieger ts EDISON ET21.

An unsov ivrrmpow c on,.n,--

February 12,1998 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361 and 50-362 L 30 Day Report j

! Licensee Event Report No. 1-98-001 San Onofre Nuclear Generating Station, Units 1,2 and 3 This submhtal provides the 30-day follow-up report required by 10 CFR 73.71(d) for the security computer system being inoperable for a few minutes.

Neither the health nor the safety of plant personnel or the public was affected by this occurrence.

ncerely, t

\ ,-

Enclosure:

LER No.98-001 cc: E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creck Field Office, NR, Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 gg 4 I Institute of Nuclear Power Operations (INPO) ) /- f 9802190164 980212 I PDR ADOCK 05000206'.-

S PDR,2 P. O.Ikn 128 at:;r" **" 8 l'ai 714 368-6183 ll******

lllllll11lll llll

_ _ - _ _ _ _ _ _ _ _ .