Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
GO2-24-004, License Amendment Request to Revise Emergency Plan | 30 January 2024 | License Amendment Request to Revise Emergency Plan | |
GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing | 29 January 2024 | Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing | |
IR 05000397/2023004 | 29 January 2024 | Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 | Non-Destructive Examination Offsite Dose Calculation Manual Temporary Modification Functionality Assessment Aging Management Process Control Program Operability Determination Maintenance Rule Program Fire Protection Program Scaffolding |
ML24011A152 | 10 January 2024 | March 2024 Emergency Preparedness Exercise Inspection-Request for Information | Siren |
GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 | 8 January 2024 | Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 | High Radiation Area |
ML24008A002 | 5 January 2024 | NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 | |
GO2-23-136, Guarantee of Payment of Deferred Premium | 20 December 2023 | Guarantee of Payment of Deferred Premium | |
GO2-23-135, Notice of Readiness for Supplemental Inspection | 14 December 2023 | Notice of Readiness for Supplemental Inspection | |
GO2-23-130, Reply to a Notice of Violation; EA-23-054 | 14 December 2023 | Reply to a Notice of Violation; EA-23-054 | |
GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report | 12 December 2023 | Licensing Basis Document Update and Biennial Commitment Change Report | Aging Management License Renewal |
ML23288A000 | 7 December 2023 | Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program |
GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | 5 December 2023 | Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level |
GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 | 28 November 2023 | Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 | |
GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 27 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
IR 05000397/2023012 | 20 November 2023 | Commercial Grade Dedication Inspection Report 05000397/2023012 | Commercial Grade Dedication Scram Discharge Volume |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000397/2023010 | 9 November 2023 | Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 | High Radiation Area Locked High Radiation Area Operability Determination |
ML23297A264 | 6 November 2023 | October 5, 2023, Summary of Teleconference with Energy Northwest Regarding Proposed License Amendment Request to Revise the Emergency Plan for Columbia Generating Station | |
IR 05000397/2023093 | 1 November 2023 | Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 | Significance Determination Process Preliminary White Finding Substantial potential for overexposure Overexposure |
ML23299A207 | 26 October 2023 | Biennial Requalification Inspection Request for Information | |
IR 05000397/2023003 | 25 October 2023 | Integrated Inspection Report 05000397/2023003 | Fire Barrier Stroke time Functionality Assessment FLEX Excess Flow Check Valve Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Weak link |
ML23275A242 | 5 October 2023 | Pre-Submittal Meeting Slides | Minimum staff |
ML23278A004 | 4 October 2023 | NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 | |
IR 05000397/2023011 | 4 October 2023 | License Renewal Phase 2 Report 05000397/2023011 | Boric Acid Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Temporary Modification Aging Management License Renewal Control of Heavy Loads Fire Protection Program Power Uprate |
ML23275A009 | 29 September 2023 | NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 | |
ML23264A142 | 21 September 2023 | Presubmittal Teleconference with Energy Northwest Regarding Proposed Request for U.S. Nuclear Regulatory Commission Approval to Revise the Emergency Plan in Its Entirety for Columbia Generating Station | |
ML23277A063 | 14 September 2023 | Emergency Plan Procedure SWP-EPP-01, Major Revision 024, Minor Revision 001, Emergency Response Organization and Training | Fitness for Duty |
IR 05000397/2023401 | 11 September 2023 | Security Baseline Inspection Report 05000397/2023401 | Fitness for Duty |
GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) | 6 September 2023 | In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) | |
ML24032A218 | 1 September 2023 | Information Request, Security IR 2024401 | |
GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication | 31 August 2023 | Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication | Post Accident Monitoring |
GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | 29 August 2023 | Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | Ultimate heat sink |
IR 05000397/2023005 | 22 August 2023 | Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter | Fitness for Duty Commercial Grade Dedication Cyber Security Aging Management License Renewal Preliminary White Finding |
IR 05000397/2023002 | 1 August 2023 | Integrated Inspection Report 05000397/2023002 | High Radiation Area Water Inventory Control Internal Flooding Fire impairment Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Time Critical Operator Action Maintenance Rule Program Liquid penetrant Fire Protection Program Substantial potential for overexposure Overexposure |
GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-170 | 27 July 2023 | Supplement to Reply to a Notice of Violation: EA-21-170 | High Radiation Area |
ML23206A244 | 25 July 2023 | Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 | High Radiation Area Preliminary White Finding |
GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation | 19 July 2023 | Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation | |
GO2-23-090, Reply to a Notice of Violation | 12 July 2023 | Reply to a Notice of Violation | High Radiation Area |
ML23143A120 | 27 June 2023 | Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds | Incorporated by reference Aging Management |
GO2-23-073, Notification of NPDES Permit Issuance | 26 June 2023 | Notification of NPDES Permit Issuance | Grab sample Biofouling |
ML23163A250 | 12 June 2023 | Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations | |
GO2-23-072, Cycle 27 Core Operating Limits Report | 5 June 2023 | Cycle 27 Core Operating Limits Report | Anticipated operational occurrence MELLLA |
ML23156A282 | 5 June 2023 | Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS | |
IR 05000397/2023090 | 1 June 2023 | Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 | High Radiation Area Significance Determination Process Preliminary White Finding Substantial potential for an overexposure Overexposure |
ML23157A270 | 1 June 2023 | 4-2022-011 -022 Letter - OI Closure to Licensee | |
IR 05000397/2023092 | 1 June 2023 | NRC Inspection Report 05000397/2023092 and Preliminary White Finding | Enforcement Discretion Significance Determination Process Preliminary White Finding Substantial potential for overexposure Overexposure |
ML23150A250 | 26 May 2023 | NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 | |
ML23163A055 | 25 May 2023 | Plant Procedures Manual 13.8.1, Revision 41, Emergency Dose Projection System Operations | Met Tower Deep Dose Equivalent Hardened vent |