ML20059H939 | 13 September 1990 | Forwards Amended Response to Notice of Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Action: Revised Procedures Will Not Be Issued Until After Unit 2 Refueling Outage.Other Changes Anticipated by 901231 | |
ML20059G721 | 5 September 1990 | Responds to Generic Ltr 90-03, Vender Interface for Safety- Related Components. Implementing Formal Vendor Interface Program for Every safety-related Component Impractical | |
ML20028G907 | 31 August 1990 | Advises That long-term erosion/corrosion-induced Program for Pipe Wall Thinning in Place,Per Generic Ltr 89-08.Program Assures Erosion/Corrosion Will Not Lead to Degradation of Single & two-phase High Energy Carbon Steel Sys | |
ML20059G874 | 31 August 1990 | Forwards Revised Security Plan,Per NRC .Summary of Revs Listed.Rev Withheld (Ref 10CFR3,50,70 & 73) | |
ML20064A471 | 29 August 1990 | Forwards Semiannual Monitoring Rept,Jan-June 1990, Rev 1 to Process Control Program, Rev 7 to Environ Manual & Rev 5 to Odcm | Process Control Program |
ML20058N677 | 3 August 1990 | Forwards Public Version of Revised Procedures to Emergency Plan manual.W/900813 Release Memo | |
ML20058L147 | 3 August 1990 | Responds to NRC Re Weaknesses Noted in Insp Repts 50-266/90-201 & 50-301/90-201 Re Electrical Distribution. Corrective Actions:Design Basis Documentation Will Be Developed to Alleviate Weaknessess in Diesel Generators | |
ML20058L504 | 30 July 1990 | Discusses & Forwards Results of fitness-for-duty Program Performance Data for 6-month Period Ending 900630 | Fitness for Duty |
ML20055J203 | 25 July 1990 | Responds to NRC Bulletin 89-002 Re Insp of safety-related Anchor/Darling Model S350W Check Valves Supplied w/A193 Grade B6 Type 410 SS Retaining Block Studs.Studs Visually Inspected & No Cracks Found | |
ML20055H778 | 24 July 1990 | Forwards Corrected Monthly Operating Rept for June 1990 for Point Beach Unit 2.Correction on Line 18 Regards Net Electrical Energy Generated | |
ML20055H662 | 23 July 1990 | Forwards Central Files & Public Versions of Revised Epips, Including Rev 2 to EPIP 1.1.1,Rev 16 to EPIP 4.1,Rev 6 to EPIP 6.5,Rev 20 to EPIP 1.2,Rev 8 to EPIP 6.3,Rev 0 to EPIP 7.3.2,Rev 10 EPIP 10.2 & Rev 11 to EPIP 11.3 | |
ML20058K894 | 23 July 1990 | Forwards June 1990 Updated FSAR for Point Beach Nuclear Plant Units 1 & 2.Steam Generator Upper Ph Guideline in Table 10.2-1 Changed from 9.3 to 9.4 | |
ML20044A909 | 6 July 1990 | Responds to NRC Bulletin 90-001 Re Loss of Fill Oil in Transmitters Mfg by Rosemount.None of Listed Transmitters Installed at Plant in Aug 1988 Identified as Having High Failure Fraction Due to Loss of Fill Oil | |
ML20055D442 | 3 July 1990 | Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 1,1990, Summary Rept | |
ML20055D347 | 29 June 1990 | Provides Addl Response to Bulletin 88-008, Thermal Stresses in Piping Connected to Rcss. Engineering Evaluations Performed to Assure Code Compliance Due to Unanalyzed Condition of Thermal Stratification Addressed | Unanalyzed Condition |
ML20055D622 | 29 June 1990 | Provides Suppl to Re Loss of All Ac Power.Test Demonstrated That Ventilation Mod & Recalibration of High Temp Trip for Auxiliary Power Diesel Improved Performance of Gas Turbine Generator as Alternate Ac Source | |
ML20055D229 | 22 June 1990 | Informs NRC That Gj Maxfield Promoted to Plant Manager effective,900701 | |
ML20055D623 | 22 June 1990 | Advises of Decision to Proceed W/Leak Testing of Sys During Plant Refueling Outage Due to Delay in Delivery of Gamma-Metrics Hardware Fix Kits.Test Revealed That Both in-containment Cable & Detector Assembly Cable Had Leaks | |
ML20044A001 | 18 June 1990 | Provides Current Implementation Status of Generic Safety Issues at Plant,In Response to Generic Ltr 90-04 | Scram Discharge Volume |
ML20043D651 | 25 May 1990 | Discusses Cycle 18 Reload on 900519,following 7-wk Refueling & Maint Outage.Reload SER for Cycle 18 Demonstrates That No Unreviewed Safety Questions,As Defined in 10CFR50.59, Involved in Operation of Unit During Cycle | |
ML20043B148 | 18 May 1990 | Advises That Necessary Info Received from Westinghouse Re Revised Administrative Controls for NRC Bulletin 88-002, Rapidly Propagating Fatique Cracks in Steam Generator Tubes. | |
ML20043B110 | 17 May 1990 | Documents Status of Evaluations Committed to Be Performed Re IE Bulletin 79-14 Program.Support CH-151-4-H50 Modified During Unit 1 Refueling Outage & Now in Code Compliance. Meeting Proposed During Wks of 900618 or 900716 | |
ML20043A992 | 16 May 1990 | Advises of Typo in Item 2.C Re Emergency Diesel Generator Meter Accuracy in Submittal Re Corrective Actions in Response to Concerns Identified During Electrical Insp.Meter Calibr Reading Should Be 3,050 Kw Not 350 Kw | |
ML20043B048 | 16 May 1990 | Updates 890330 Response to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Util Will Replace Unit 1 Inverter & Battery Charger Circuit Breakers within 30 Days After Receipt & QA Verification | |
ML20043A763 | 15 May 1990 | Responds to Notice of Violation & Forwards Civil Penalty in Amount of $87,000 for Violations Noted in Insp Repts 50-266/89-32,50-266/89-33,50-301/89-32 & 50-301/89-33. Addl Employees Added in QA & Corporate Nuclear Engineering | |
ML20042H020 | 10 May 1990 | Forwards List of Concerns Identified at 900417 Electrical Insp Exit Meeting to Discuss Preliminary Findings of Special Electrical Insp Conducted on 900319-0412 Re Adequacy of Electrical Distribution Sys | Safe Shutdown Temporary Modification Battery sizing |
ML20043A218 | 10 May 1990 | Forwards Nonproprietary & Proprietary Version of Point Beach Nuclear Plant,Emergency Plan Exercise,900314. | |
ML20042G744 | 9 May 1990 | Forwards LER 90-003-00 | |
ML20042G736 | 8 May 1990 | Forwards LER 90-004-00 | |
ML20042E457 | 10 April 1990 | Documents Basis for Request for Temporary Waiver of Compliance of Tech Spec 15.3.7.A.1.e Re Diesel Generator Fuel Oil Supply | Operating Basis Earthquake |
ML20012F296 | 29 March 1990 | Withdraws Tech Spec Change Request 120 Re Staff Organization Changes & Deletion of Organizational Charts,Based on Further Corporate Restructuring within Util | |
ML20012D830 | 20 March 1990 | Responds to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. No Limiting Condition for Operation Required for Overfill Protection Sys at Plant | |
ML20012D424 | 8 March 1990 | Forwards Public Version of Revised Epips,Including Rev 17 to EPIP 1.3,Rev 8 to EPIP 3.1,Rev 15 to EPIP 4.1,Rev 1 to EPIP 6.7,Rev 1 to EPIP 7.1,Rev 11 to EPIP 7.2.1 & Rev 11 to EPIP 7.2.2 | |
ML20011F753 | 26 February 1990 | Informs NRC of Apparent Inconsistency Between Min Level of Boric Acid Solution to Be Maintained in Boric Acid Storage Tanks Per Tech Specs & Amount of Deliverable Boric Acid Assumed in Safety Analyses | Boric Acid |
ML20006B709 | 25 January 1990 | Responds to NRC Bulletin 89-002 Re Check Valve Bolting Insp. All Anchor-Darling Model S35OW Check Valves Inspected for Cracked Internal Bolting During Refueling Outage of Unit.No Indications of Cracks Found | Liquid penetrant |
ML20006A338 | 18 January 1990 | Forwards PDR & Central Files Versions of Rev 16 to EPIP 9.2 & Forms, Radiological Dose Evaluation. | |
ML20006A341 | 16 January 1990 | Forwards Rev 16 to EPIP 9.2, Radiological Dose Evaluation to Be Inserted in EPIP Manual | |
ML20005G090 | 12 January 1990 | Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Outside of Intake Structure Will Be Inspected for Excessive Corrosion on Semiannual Basis & Forebay & Pumphouse Inspected | Zebra Mussel Veliger Biofouling |
ML20005G175 | 12 January 1990 | Responds to NRC 891213 Ltr Re Violations Noted in Insp Repts 50-266/89-30 & 50-301/89-30.Corrective Action:Procedure RP-6A, Steam Generator Crevice Flush (Vacuum Mode), Initiated | Fire Watch |
ML20005H055 | 11 January 1990 | Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Util Will Provide Specific Training to All Members Responsible for Refueling Operation to Emphasize Importance of Procedures | Shutdown Margin |
ML20005G903 | 9 January 1990 | Forwards Monthly Operating Repts for Dec 1989 for Point Beach Nuclear Plant Units 1 & 2 & Revised Monthly Operating Rept for Nov for Point Beach Unit 2 | |
ML20005G564 | 8 January 1990 | Updates Progress Made on Issues Discussed in Insp Repts 50-266/89-12 & 50-301/89-11 Re Emergency Diesel Generator Vertical Slice SSFI Conducted by Util.By Jul 1990,revised Calculation Re as-built Configuration Will Be Performed | Backfit |
ML20005E544 | 29 December 1989 | Describes Actions & Insps Completed During Recent U2R15 Refueling Cycle & Proposed Schedule for Completion of NRC Bulletin 88-008 Requirements,Per Util 881221 & 890616 Ltrs. Extension Requested Until 900631 to Submit Data Evaluation | |
ML20005E545 | 28 December 1989 | Advises That Addl Info Required from Westinghouse to Meet Util 890621 Commitment to Adopt Administrative Control Re Rapidly Propagating Fatigue Cracks in Steam Generator Tubes Per NRC Bulletin 88-002.Info Anticipated by End of Mar 1990 | |
ML20005E538 | 27 December 1989 | Provides Update of Status of Implementation of Resolution of Human Engineering Discrepancies Documented During Dcrdr. Lighting Intended to Document Deficiencies Per NUREG-0700, Eleven Human Engineering Discrepancy Computers Resolved | Emergency Lighting |
ML19354D578 | 21 December 1989 | Certifies Implementation of Fitness for Duty Program Which Meets Requirements of 10CFR26 for All Personnel Having Unescorted Access to Plant Protected Areas.Periodic Mandatory Random Chemical Testing Will Commence on 900103 | Fitness for Duty |
ML20005D807 | 21 December 1989 | Forwards Response to Violations Noted in Insp Repts 50-266/89-29 & 50-301/89-29.Response Withheld (Ref 10CFR73.21) | |
ML20005E230 | 21 December 1989 | Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 2, Summary Rept,Per 10CFR50,App J.Type A,B & C Leak Test Results Provided | |
ML20042D239 | 21 December 1989 | Responds to Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Actions:Superintendent of Health Physics Discussed Log Book Entry Requirements W/Health Physics Contractor Site Coordinator | Temporary Modification |
ML19354D623 | 15 December 1989 | Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Intends to Meet All Recommendations Discussed in Ltr Except for Item C Re Changing motor-operated Valve Switch Settings |