PY-CEI-NRR-0900, Monthly Operating Rept for Jul 1988 for Perry Unit 1

From kanterella
(Redirected from ML20151U256)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1988 for Perry Unit 1
ML20151U256
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/31/1988
From: Dunn G, Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
PY-CEI-NRR-0900, PY-CEI-NRR-900, NUDOCS 8808190005
Download: ML20151U256 (6)


Text

- . - _ _ - .

J

= l t

f ,

l l

l 1

i l

l l

CLEVELAND ELECTRIC ILLUMINATING COMPANY )

PERRY NUCLEAR POWER PLANT JULY 1, 1988 - JULY 31, 1988 i

MOKrHLY OPERATING REPORT TO NRC i

i l

l l

DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 l

l 8808190005 880731

) N\ l PDR ADOCK 05000440 4 R PDC l l

s Table of Contents Average Daily Unit Power Level . . . . . . . . . . . . . . . . 1 Operating Data Report. . . . . .. . . . . . . . . .. . . . . .2 Unit Shutdowns and Power Reductions. . . . . . . . . . . . . . .3 i

I I

1

p .

4 * .

Average Daily Unit Power Level u

DOCKET NO. 50-440 UNIT rerry-1 DATE 8/05/88 Contact G.A.Dunn Telephone' (216)259-3737 MONTH July 1988 _

DAY AVERAGE DAILY POVER LEVEL DxV

~~~

AVERAGE DAILY POWER LEVEL (MVe-Net) (MVe-Net) 1 1144 17 1065 2 1112 18 1093____ _ ,

3 1140 19 1G97 4 1140 20 1109 '

5 1135 21 1131 6 1127 22 1132 7 1108 23 1139 8 1082 24 1037 9 1078 25 1121 10 1038 26 1134 11 1084 27 __

1118 12 1100 28 1072 13 1113 29 1019 14 1040 30 1030 15 1121 31 1102 16 998 INSTRUCTIONS On this form list the average daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole megavatt.

i

FE ,

L  :. -

J .i

  • s Operating Data Report UNIT: Perry-1 DATE: 8/05/88 OPERATING STATUS
1. Docket: ;0-440
2. Reporting Period: July 1988
3. . Utility

Contact:

G.A. Dunn (216) 259-3737

4. Licensed Thermal -Power (MWt): 3579
5. Nameplate Rating (Gross FWe): 1250
6. Design Electrical Rating (Net MWe): 1205
7. Maximum Dependable Capacity (Gross MWe): 1230
8. Maximum Dependable Capacity (Net MWe): 1185
9. If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level To Which Restricted, If Any (Net MWe): 100%
11. Reasons for Restrictions, If Any: Technical Specification Limit  !

This Month Yr-to-Date Cumulative i

12. Hours In Reporting Period 744 5,111 6,155
13. Hours Reactor Was Critical 744 3,799.7 4,611.0 14 Reactor Reserve Shutdown Hours 0 0 0
15. Hours Generator On-Line 744 3,608.2 4,381.6
16. Unit Reserve Shutdown Hours 0 0 0
17. Gross Thermal Energy (MWH) 2,575,590 11,933,315 14,494,834
18. Gross Electrical Energy (MWH) 856,213 4,070,892 4,949,354
19. Net Electrical Energy (MWH) 815,015 3,842,947 4,671,431
20. Unit Service Factor 100.0 70.6 71.2 ;
21. Unit Availability Factor 100.0 70.6 71.2 l
22. Unit Capacity Factor (Using  ;

MDC Net) 92.4 63.4 64.0

23. Unit Capacity Factor (Using DER Net) 90.9 ~

62.4 63.0

24. Unit Forced Outage Rate 0 19.6 20.8
25. Forced Outage Hours 0 876.9 1147.5
26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Planned Maintenance Outage, October 1988, 10 Days (Tentative)

27. If Shut Down at end of Report Period, Estimated Date of Startup:

N/A i

l l

l l

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 . .

UNIT NAME Perry-1 ,

REPORT MONTil July 1988 DATE 8/5/88 CONTACT G. A. Dunn TELEP110NE (216) 259-3/37 m

M c u C N o Dou C No. Date g

0

.,q a

g g , ,C g g j wy Licensee Event

(

u,g gg gy Cause & Corrective Action to H gj y ca v ajgo xm Report # gg o

gu Prevent Recurrence n

Not Applicable i

SUMMARY

During July 1988, Perry-l experienced no outages or power reductions. Maximum power operation was limited due to the unavailability of the 'A' final stage Feedwater Heater, and extreme warm weather conditions. ,

'F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continued 1022)

, E-Operator Training & 5,-Reditced Load 5

License Examination 9-Other Exhibit I-Same Source F-Administrative G-Operational Error (Explain)

H-Other (Explain)

. 1 4

  • < THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O. BOX 97 s PERRY, OHIO 44081 e TELEPHONE (216) 259-3737 s ADDRESS-10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan t*ICJ PRESIDENT NUCLEAR GROUP August 15, 1988 PY-CEI/NRR-0900 L i U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report l

Dear Sir:

Attached is the July 1988 Honthly Operating Report for Perry Unit 1. This report is submitted in accordance with Technical Specification 6.9.1.8.

If there are any questions, please feel free to call.

Ver truly yours, at - G Al Kaplan Vice President Nuclear Group AK: cab Attachment cc: T. Colburn K. Connaughton USNRC, Region III Director, Office of Resource Management k