ML20137X858

From kanterella
Jump to navigation Jump to search
Discusses 970324 Request for Two Rail Routes to Be Used for Transport of Sf from Southport,Nc & Hartsville,Sc to New Hill,Sc.Safeguards Info Encl
ML20137X858
Person / Time
Site: Brunswick, Robinson  Duke energy icon.png
Issue date: 04/16/1997
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Wilkerson T
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9704220217
Download: ML20137X858 (6)


Text

, p& 4 4 Y k j p & UNITED STATES l g

o

,j

'S NUCLEAR REEULATORY COMMISSION WASHINGTON D.C. 20066-0001 s*****/ ,

April 16, 1997 130/135 for-9" J'^ b')kb' SFP0:GMB Mr. Terry.M. Wilkerson Manager - Regulatory Affairs Carolina Power & Light Company Robinson Nuclear Plant 3581 West Entrance Road Hartsville. SC 29550

Dear Mr. Wilkerson:

This is in regard to your request dated March 24. 1997, for two rail routes to be used for transport of spent fuel from the Brunswick Steam Electric Plant.

Southport. North Carolina, and the H. B. Robinson Steam Electric Plant.

Hartsville. South Carolina, to the Shearon Harris Nuclear Power Plant. near New Hill. South Carolina.

The routes as set forth in Enclosure 1 of each route, meet the regulatory requirements of 10 CFR 73.37. Enclosure 2 of each route constitutes the route aaproval. Unless renewed these route approvals will expire two years from tie date of this letter. Note that transportation of licensed radioactive material must be conducted in compliance with applicable U.S. Department of Transportation regulations.

Note that 10 CFR 73.37(d)(3) requires rail shipments to be accompanied by escorts who have communications capability to summon assistance in case of an emergency. NRC staff have completed the arrangements with law enforcement agencies required by 10 CFR 73.37(b)(6). Information on these arrangements is provided in Enclosure 2 for each route, and is to be incorporated into your shipment plans and provided to your carrier along with instructions regarding its use.

The notification requirements of 10 CFR 73.37(f) and 73.72. and the informa-tion protection requirements of 10 CFR 73.21. apply for each shipment made under these approvals. When making notification to this office under 10 CFR 73.72 please confirm that the appropriate governors or designees will or have been notified.

NRC FILE CENTER COPY aDocket!No's;,50:324y 50-261 UPON REMOVAL OF ATTACliiENTTi;;3 53G'Ji!.LT '3:

he4 lied Document Transmitted Herewith gg gp;, j g A /g A i

Contains Safeguards Information 22 m s 9704220217 970416 PDR F

ADOCK 05000261 PDR SAiEG ADS ERMA~ 0\ M

/ T. M. Wilkerson April 1,6, 1997 Should you require additional information or have questions concerning this matter, please contact John Cook of my. staff at (301) 415-8521.

t Sincerely.

l 4

Susan F. Shankman. Chief Transportation Safety and Inspection Branch Spent Fuel Project Office. NMSS

Enclosures:

1. Rail Route #130
2. Rail Route #135 DISTRIBUTION:

w/ enclosures: w/o enclosures:

[' Docket: Files 05000324/05000261 NMSS/SFP0 R/F WKane Cas"e' Files 50-324/50-261 RFonner Region II MMessier PUBLIC (Enclosure 1) TAC-L22428 MRodgers. NMSS:PMDA TAC-L22429 I

1 l

l C = COVER E = COVER & ENCLOSURE N = NO COPY

0FC ,1 SFP0 K SFP0 N SFP0 /M TsfPAo i NAME YGMBennington <r~k$RCook EEasMIfh SF M an DATE 04//y/97 04/fN 97 04/lb/97 04//$/97 0FFICIAL RECORD COPY

ENCLOSURE 1 i

! ~ RAIL ROUTE #130 BRUNSWICK STEAM ELECTRIC PLANT.

SOUTHPORT, NORTH CAROLINA l

TO l

4 SHEARON HARRIS NUCLEAR POWER PLANT l

NEAR NEW HILL, NORTH CAROLINA i-i 4

ca a

B

4 130

, Enclosure 1 2 RAIL TRANSPORTATION ROUTE BRUNSWICK STEAM ELECTRIC PLANT SOUTHPORT. NORTH CAROLINA TO SHEARON HARRIS NUCLEAR POWER PLANT

. NEAR NEW HILL. NORTH CAROLINA  !

NORTH CAROLINA

- 1. Brunswick Steam Electric Plant. Southport. NC through l the Sunny Point Military Ocean Terminal to Leland NC 18 miles <

2. Leland. NC west over CSX tracks to Hamlet. NC 119 miles
3. Hamlet. NC north over CSX tracks to Bonsal. NC 70 miles l Total 207 miles i

\

l l

l l

Individual receiving advance notification of spent fuel shipment pursuant to  !

10 CFR 73.37(f): First Sgt. T. C. Stroud. 919-733-5282: after hours. 919-733-3861.

l April 1997 l

1 1

1 ENCLOSURE 2 i

i.

1

, RAIL ROUTE #135 H. B. ROBINSON STEAM ELECTRIC PLANT i HARTSVILLE, SOUTH CAROLINA ll TO SHEARON HARRIS NUCLEAR POWER PLANT NEAR NEW HILL. NORTH CAROLINA 1

l 1

9 i

i

.j

l l

135

. Enclosure 1 l

RAIL TRANSPORTATION ROUTE l H. B. ROBINSON STEAM ELECTRIC PLANT

. HARTSVILLE, SOUTH CAROLINA l

T0 l

~

SHEARON HARRIS NUCLEAR POWER PLANT NEAR NEW HILL NORTH CAROLINA I 4 I

.I

+

SOUTH CAROLINA

1. H. B. Robinson Steam Eicctric Plant, i
Hartsville. SC to ficBee, SC 6 miles  !

\'

E 2. McBee. SC north to the NC state line 40 miles J

Subtotal 46 miles NORTH CAROLINA

3. NC state line north over CSX tracks to 8onsal, NC 83 miles
4. Bonsal. NC west tp Shearon Harris Nuclear Power Plant 3 miles l Subtotal 86 miles TOTAL 132 miles SOUTH CAROLINA Individual receiving advance notification of spent fuel shipment pursuant to 10 CFR 73.37(f): Virgil Autry. 803-896-4244: after hours. 803-253-6488.

NORTH CAROLINA Individual receiving advance notification of spent fuel shipment pursuant to 10 CFR 73.37(f): First Sgt. T. C. Stroud. 919-733-5282: after hours. 919-733-3861.

April 1997

,.