Informs of Plans to Conduct Design Insp of Plant for Period 970505-09,19,23 & 0602-13
ML20137F578
Person / Time
Site: Davis Besse, Farley  Cleveland Electric icon.png
Issue date: 03/27/1997
From: Hansen A
NRC (Affiliation Not Assigned)
To: Jeffery Wood
CENTERIOR ENERGY, TOLEDO EDISON CO.
References
NUDOCS 9704010148
Download: ML20137F578 (4)


Text

,

vs uru

- tj t UNITED STATES j

NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 3066Hm01

.....,o ,

March 27, 1997 50 J',T, Mr. John K. Wood Vice President - Nuclear. Davis-Besse Centerior Service Company c/o Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor. Ohio 43449-9760

SUBJECT:

PLANNED DESIGN INSPECTION. DAVIS-BESSE NUCLEAR POWER STATION.

UNIT NO. 1

Dear Mr. Wood:

The purpose of this letter is to inform you of our plans to conduct a design inspection of the Davis-Besse Nuclear Power Station. We have scheduled the on-site inspection for the periods of May 5 through 9. May 19 through 23. and June 2 through 13. 1997. Your staff has indicated that there are no major conflicts with on-site activities during this period. The team leader and two team members of the inspection team will visit the site between April 2 and April 4.1997, to collect documentation necessary for in-office review and on-site inspection.

Recent NRC inspections at nuclear power reactor facilities have identified numerous findings *where the actual plant configuration or operations were inconsistent with the design basis. licensing basis, or the Updated Safety Analysis Report. Therefore, the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure (IP) 93801.

" Safety System Functional Inspection." Two systems will be selected for inspection, and documents pertaining to these systems will be obtained, during the April 2 through 4.1997, visit.

Mr. S.K. Malur. Team Leader. NRR. will interface with you and your staff regarding all matters related to this inspection. The inspection will be

>erformed by a team of five engineers from Sargent and Lundy (S&L) who have 3een contracted by the NRC for this purpose.

9704010148 970327 PDR ADOCK 05000364 e een g

4 , g f* '

Mr. John K. Wood Davis-Besse Nuclear Power Station Toledo Edison Company Unit No. I cc:

Mary E. O'Reilly Robert E. Owen, Chief '

Centerior Energy Corporation Bureau of Radiological Health 300 Madison Avenue Service '

Toledo, Ohio ~ 43652 Ohio Department of Health P. O. Box 118 ,

Mr. James L. Freels Columbus, Ohio 43266-0118 Manager - Regulatory Affairs Toledo Edison Company Davis-Besse Nuclear Power Station Attorney General 5501 North State - F.oute 2 Department of Attorney Oak Harbor. Ohio 43449-9760 30 East Broad Street Columbus, Ohio 43216 Gerald Charnoff, Esq. '

Shaw, Pittman, Potts Mr. James W. Harris, Director and Trowbridge Division of Power Generation ,

2300 N Street N.W. Ohio Department of Industrial Washington, D.C. 20037 Regulations P. O. Box 825 Regional Administrator Columbus. Ohio 43216 U.S. NRC, Region III 801 Warrenville Road Ohio Environmental Protection Agency

. Lisle, Illinois 60523-4351 DERR--Compliance Unit ATIN: Zack A. Clayton Mr. Robert B. Borsum P. O. Box 1049 Babcock & Wilcox Columbus. Ohio 43266-0149 Nuclear Power Generation Division 1700 Rockville Pike. Suite 525 State of Ohio  !

Rockville. Maryland 20852 Public utilities Commission i 180 East Broad Street Resident Inspector. Columbus, Ohio 43266-0573 U. S. Nuclear Regulatory Commission 5503 North State Route 2 Mr. James R. Williams l Oak Harbor, Ohio 43449 Chief of Staff Ohio Emergency Management Agency Mr. James H. Lash Plant Manager 2855 West Dublin Granville Road Toledo Edison Company Columbus. Ohio 43235-2206 Davis-Besse Nuclear Power Station 5501 North State Route 2 President, Board of County Oak Harbor Ohio 43449-9760 Commissioner of Ottawa County Port Clinton, Ohio 43452 Roy P. Lessy, Jr., Esq.

Andrew G. Berg. Esq.

Akin, Gump Strauss, Hauer & Feld, L.L.P.

1333 New Ham) shire Avenue, NW., Ste. 400 Washington. ).C. 20036 l

O 1,.. .

I J. Wood l We will be in contact with your staff regarding additional details for the  !

inspection. Should you have any questions, please contact Mr. Malur at l (301) 415-2963 or me at (301) 415-1390.

! . 1 i Sincerely.

l Original signed by:

! Allen G. flansen, Project Manager Project Directorate III-3 l Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l Docket No. 50-346 cc; See next page

, l i I r j Distribution: l l

Docket. File (50-346)

PUBLIC PDIII-3 R/F <

JRoe

, EAdensam l CCarpenter i GMarcus '

l OGC

l. ACRS JCaldwell, RIII l

To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" c No copy 1

DOCUMENT NAME: G:\DAVISBES\AEN0TICE.DB i 0FFICE PM:ED111-3 LA:PDIM-3 C BNl NAME AH&MFn + CBoyle W RGallo l 1 DATE 03/j20/97m 03/ #/97 03//#/97

> / " W' ~ OFFICIAL RECORD COPY OFO \ 'I o l 310029  !

O  :

_ _ . _ . . _ ___. _. _ ~ _.. . . - - - - _ . - .

w J. Wood We will be-in contact with your staff regarding additional details for the inspection. Should you have any questions, please contact Mr. Malur at (301) 415-2963 or me at.(301) 415-1390.

Sincerely.

Original signed by: '

Allen G. Hansen. Project Manager  !

Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-346 cc. See next page Distribution:

Docket File (50-346)

PUBLIC PDIII-3 R/F JRoe EAdensam CCarpenter GMarcus OGC ACRS JCaldwell . RIII To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N"

= No copy DOCUMENT NAME: G:\DAVISBES\AEN0TICE.DB 0FFICE PM:fpil -3 LA:PDI ; -3 C BNl NAME AP Wr Fn + CBoyle Ud RGallo DATE 03/30/97 403/ #/97 03//# /97

)/"F7" 0FFICIAL RECORD COPY