ML20107F984

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for March 1996 for San Onofre Nuclear Generating Station,Units 2 & 3,as Required by TS 6.9.1.10 of Licenses NPF-10 & NPF-15,respectively
ML20107F984
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/12/1996
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20107F988 List:
References
NUDOCS 9604230061
Download: ML20107F984 (1)


Text

. .

rptso-,bu,o-L- j EDISON An lDlSON i\11 RN 47 ION 4f Company April 12, 1996

'U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for March 1996 San Onofre Nuclear Generating Station, Units 2 and 3 ,

l Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 i

and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly operating Report for each Unit, which includes
routine operating statistics and shutdown I experience; all challenges to safety valves; any changes to the Offsite I

Dose Cale.ulation Manual (ODCM); and any major changes to the radioactive waste treatment system. All covered activities are report ed monthly, l except for ODCM changes, which are reported within 90 dap from the time the changes are effective.

This letter transmits the March 1996 Monthly Operating Reports for Units 2 and 3. There were no challenges to safety valves, no major changes to j the Units 2 and 3 radioactive waste treatment systems, and no changes to y the ODCM during the reporting period.

I If you require any additional information, please let me know.

l Sincerely, 4

l Walter C. harsh

) Manager of Nuclear Regulatory Affairs Enclosures cc: L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. 3. Fields, NRC Project Manager, Units 2 and 3 J. . A . Sloan, Senior NRC Resident Inspector, San Onofre Units 2 & 3

/

2201 %

9604230061 960412 DR ADOCK0500g1 P. O. Bos 128 San Clemente, CA 92674 0128 [hk lll