Category:CORRESPONDENCE-LETTERS
MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R3661996-02-19019 February 1996 Forwards Radionuclide Annual Emissions Rept for 1995, Including Output from Computer Code Comply Version 1.5d ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes 1999-03-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes ML20127P8091992-11-30030 November 1992 Forwards Offsite Dose Calculation for Noble Gases, in Response to 900418 Request for Addl Info in Support of 880419 License Renewal Application.Analysis Addresses Dose to Receptor in Unrestricted Areas Proximate to Facility ML20114B9421992-08-27027 August 1992 Responds to NRC Re Violations Noted in Insp Rept 50-297/92-01.Corrective Actions:Emergency Plan & Procedures Currently Under Review & self-contained Breathing Apparatus Placed on Maint Contract W/Approved Vendor ML20099K2651992-08-21021 August 1992 Forwards Pulstar Annual Rept to NRC for Jul 1991-June 1992, North Carolina State Univ Nuclear Reactor Program & Environ Radiation Surveillance Rept for Jul 1991-June 1992 ML20091Q3191992-01-22022 January 1992 Notifies That Pb Perez Assigned Assoc Director,Nuclear Reactor Program Effective 920201 ML20086C6381991-11-13013 November 1991 Submits Info to Correct Data Base & for Consideration When Reviewing Written Exam Administered on 911112 by P Isaac ML20082H8121991-08-21021 August 1991 Forwards Pulstar Annual Rept to NRC for Jul 1990 to June 1991 & Environ Radiation Surveillance Rept for Jul 1990 to Jul 1991 ML20082E3321991-06-27027 June 1991 Submits Listing of Personnel Changes Identified in Figure 6.1-1 of Amend 8 to Tech Specs.G Miller Resigned Position as Associate Director on 910625.Univ Anticipates Hiring Individual to Fill Position in Fourth Quarter 1991 ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070N8901991-03-15015 March 1991 Forwards Decommissioning Funding Statement of Intent,Per 10CFR50.75 for Pulstar Reactor Facility ML20066D7781991-01-0707 January 1991 Submits List of Personnel Changes in Positions Identified by Figure 6.1-1 of Tech Specs (Amend 8).Mailing List Should Be Corrected to Reflect Changes ML20059D1391990-08-31031 August 1990 Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 ML20055H9161990-07-24024 July 1990 Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility ML20055G6441990-07-20020 July 1990 Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) ML20055H0831990-07-18018 July 1990 Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info ML20042E2951990-04-17017 April 1990 Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) 1999-02-02
[Table view] |
Text
- . . - - - - . - - - . . - . - - - . - - - - _ . -
i
. . 1
- f -North Carolina State University . ;
Nuclear Reactor Program i Department of Nuclear Engmeermg j Box 7900 Raleigh, NC 27695 7900 t
. (919) 515 2321 29 November 1995 FAX (919) 515-5115 4
i t
4 U.S. Nuclear Regulatory Commission
- RegionII Administrator =
j- 101 Marietta Street, N.W. '
j Atlanta, GA 30323 4 <
Subject:
Notification of a licensee identified proce'dural non-compliance and an .
" I
' administrative controls deviation in accordance with the NCSU PULSTAR -
Facility Technical Specification 6.7.3 (d)
Docket No.: 50-297 l License No.: R-120 i
Dear Sir:
The PULSTAR reactor was shutdown for maintenance on 15 November 1995 when the auto ranging capability of the new Gamma Metrics (G-M) linear channel was verified to have !
. malfunctioned. Reactor power monitoring, power reverse, reactor scram, and manual
- ranging capabilities of the linear channel were verified to be operable.
A detailed review of the linear and safety channel design and tests have been performed to i
! address postulated effects of spurious range changes. Results of the review indicate that
. there was no degradation of the channel's protective functions during the spurious auto l range malfunctions. The affected PCA card has been shipped to G-M for troubleshooting l and repair.
The failure of the linear channel to auto range on 6 Nov and 15 Nov 1995 did not constitute a reportable event per Technical Specifications (TS) 6.5 and definition 1.17(f). However,
, the sequence of events of 6 Nov and 15 Nov 1995 have been reviewed and determined to include a procedural non-compliance and an administrative controls deviation. These two findings are reportable to the NRC within 30 days in accordance to TS 6.73 (d).
- ~ Discussion The PULSTAR reactor nuclear instrumentation channels have been replaced with modern
' design nuclear instruments from G-M. Upgrades to the source range, intermediate, linear, f and safety channels were performed under the provisions of 10CFR50.59 following review and approval by the NCSU Reactor Safety and Audit Committee and Radiation Protection \l Committee. . S
+
9512040294 951129 %
.PDR ADOCK 05000297 '
G
. North Carolina State Univers'iiiis'i%d-gra*nTunlbirs.PDRity and b constituent inststutson of The University of 4
._.n _ _ _ .
,V' U.S., Nuclear Regulatory Commission (2) 29 November 1995 Administrator, Region H The G-M instruments were installed following a sequential schedule which allowed the new j instruments to be cross-checked with the remaining nuclear channels. On 6 November 1995, the reactor was started following a post installation test of the safety channel which was the final G-M instrument to be installed. Reactor power was being increased to 10 kW when the G-M linear channel failed to automatically up-range. The power increase was terminated and the channel was manually ranged. Reactor power was next decreased to 500 watts and the linear channel automatically down-ranged as expected. Reactor power was then increased to 10 kW and the linear channel automatically up-ranged as expected. This evolution was repeated and the auto ranging mode once again responded as expected. The observed failure to auto up-range could not be reproduced. 'Ihroughout these evolutions l all required nuclear instruments were monitoring and tracking reactor power. The reactor :
was shut-down and the linear channel reverse and scram setpoints were verified to be ,
correct per PULSTAR Operating Manual (POM) Section 3.1.1.
The G-M linear channel failure to auto up-range was considered to be a spurious behavior of the new equipment. The reactor was restarted and normal operation was performed until 15 November 1995 when the linear channel failed to auto up-range at 100 kW on a power increase maneuver. As on 6 November, the power increase was terminated by inserting control rods. Reactor power was decreased this time to 10 kW and the channel auto down-ranged as expected. Power was next raised to 100 kW and the channel failed to auto up-range on the 30 kW range and the power increase was terminated. The channel was successfully up-ranged and down-ranged in manual with the reactor at a constant power of 10 kW. The reactor was next shut-down, however, there was a spurious down-range on one scale during the shut-down. The auto ranging failure was considered an anomaly at this point and the reactor was secured for maintenance of the linear channel.
Compliance with License Requirements PULSTAR Operating Manual procedural steps in 3.2.1.1 (Rev 15) describe the sequence j of events performed by the operator for normal reactor start-ups. Step (3) of the procedure ;
instructs the operator to place the linear channel " Range Select Mode" to " AUTO". POM l 3.2.1.3 describes the sequence of events for increasing reactor power. This procedure does not address operating with the linear channel " Range Select Mode" in manual mode. As a result, the linear channel range select mode is left in automatic from POM 3.2.1.1.
On 6 and 15 Nov 1995 the reactor operator placed the " Range Select Mode" to " MAN" and checked manual range control when the instrument failed to automatically up-range. This manual range control constitutes a procedural non-compliance which must be reported to the NRC within 30 days in accordance with Technical Specification requirement 6.7.3(d).
The PULSTAR Operating Procedures do not provide the operator with instructions or guidance for an abnormal channel behavior such as the two experienced on 6 and 15 Nov.
y ,
1 U.S.Suctear Regulatory Commission (3) 29 November 1995 Administrator, Region II As a result, abnormal instrument behavior could lead to a procedural non-compliance. -
- POM 3.2.1.1 should also allow flexibility in selecting the linear channel ranging mode.
. The PULSTAR reactor is operated in accordance with license requirements which include a detailed " Request for Reactor Operations" referred to as a "runsheet". Reactor runsheets are submitted by authorized users of the reactor and its facilities and these requests are
, reviewed by the Reactor Operations Manager or Associate Director and the Reactor Health Physicist. The runsheet review includes a check of project and reactor license requirements, and an ALARA evaluation.
The runsheet for 6 Nov 1995 (No. 05028-1) was under PULSTAR Project P-30 which allows, in part, for reactor surveillances. This run was intended for cross-checking the response of the installed G-M safety channel in accordance with a safety channel post installation instruction. There were no provisions made in the runsheet or in the post installation
. instructions for performing an evaluation of the linear channel. In addition, the purpose of the run included cross-checking the safety channel against the linear channel. The spurious i behavior of the linear channelinvalidated the intended evaluation. The reactor should have been secured and the linear channel tested in accordance with G-M procedures.
- Similarly, on 15 Nov 1995 the runsheet submitted (No. 05034-1) was in accordance with j PULSTAR Project P-40. This project does not allow for PUIETAR reactor related 4
evaluations.
l These two events constitute a deviation from administrative controls and are reportable to
- the NRC within 30 days in accordance to TS 6.7.3 (d). Specifically, the authorized reactor
! utilization on these dates should have been terminated and following a linear channel check-out, the reactor should have been re-started under P-30 with specific instructions on the new runsheet.
- Control Room Operating Crew Response
}.
~
The reactor operators must be commended for their attentiveness and prompt responses to j maintain the power indication on scale, decrease power, and inform the Designated Senior ,
, Reactor Operator (DSRO). The procedural non-compliance discussed above can not be attributed to the operators, but rather to the operating procedures. However, a review of the sequence of events demonstrated a potential deficiency in the operating crew commencing trouble shooting activities prior to shutting down the reactor. Such activities I
could lead to a violation of technical specification Limiting Conditions for Operation (LCO).
Although these two events did not compromise an LCO, it is important to acknowledge the potential of exceeding an LCO and train the staff to first secure the facility and then establish a formal maintenance effort.
t B
g U.S~Ndciear Regulatory Commission (4) 29 November 1995 Administrator, Region II Corrective Actions POM 3.2.1.1 will be changed to allow the safety and linear channels to be operated in either
" AUTO" or " MAN" modes. The recommended modes wil: be " AUTO" for the linear.
channel and " MAN" on the 1 MW scale for the safety channel. In addition, a new procedure will bel written to address immediate operator action following abnormal .
instrumentation behavior. These two POM changes will be implemented by 31 January 1996 and a special training session on these two changes will be completed by 15 January 1996.
Additionally, training will also be provided to review adherence to approved runsheet specifications and limitations for reactor evolutions. The training will also review reactor status, maintenance operations, and 50.59 design changes. This training will be completed by 31 January 1996.
Conclusions As stated in the summary, the failure of the linear channel to auto range does not constitute a reportable event as defm' ed in TS 1.17(f) and there were no degradation of the channel's protective functions. The procedural non-compliance and administrative controls deviation must be reported in accordance with TS 6.7.3(d). Lessons learned from the detailed reviews have provided corrective actions which will be implemented in accordance with previously presented schedule.
Should you or your staff have any questions or comments, please do not hesitate to contact me at (919) 515-4602.
Sincerely yours, b,
- Pedro B. Perez Associate Director, Nuclear Reactor Program F
cc: USNRC Document Control Desk
. Mr. Al Adams, Jr., USNRC Mr. Craig Bassett, USNRC, Region II
- Dr. Charles W. Mayo, Chairman, Reactor Safety and Audit Committee Dr. James Knopp, Chairman, Radiation Protection Council o
- -