MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R3661996-02-19019 February 1996 Forwards Radionuclide Annual Emissions Rept for 1995, Including Output from Computer Code Comply Version 1.5d ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes 1999-03-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes ML20127P8091992-11-30030 November 1992 Forwards Offsite Dose Calculation for Noble Gases, in Response to 900418 Request for Addl Info in Support of 880419 License Renewal Application.Analysis Addresses Dose to Receptor in Unrestricted Areas Proximate to Facility ML20114B9421992-08-27027 August 1992 Responds to NRC Re Violations Noted in Insp Rept 50-297/92-01.Corrective Actions:Emergency Plan & Procedures Currently Under Review & self-contained Breathing Apparatus Placed on Maint Contract W/Approved Vendor ML20099K2651992-08-21021 August 1992 Forwards Pulstar Annual Rept to NRC for Jul 1991-June 1992, North Carolina State Univ Nuclear Reactor Program & Environ Radiation Surveillance Rept for Jul 1991-June 1992 ML20091Q3191992-01-22022 January 1992 Notifies That Pb Perez Assigned Assoc Director,Nuclear Reactor Program Effective 920201 ML20086C6381991-11-13013 November 1991 Submits Info to Correct Data Base & for Consideration When Reviewing Written Exam Administered on 911112 by P Isaac ML20082H8121991-08-21021 August 1991 Forwards Pulstar Annual Rept to NRC for Jul 1990 to June 1991 & Environ Radiation Surveillance Rept for Jul 1990 to Jul 1991 ML20082E3321991-06-27027 June 1991 Submits Listing of Personnel Changes Identified in Figure 6.1-1 of Amend 8 to Tech Specs.G Miller Resigned Position as Associate Director on 910625.Univ Anticipates Hiring Individual to Fill Position in Fourth Quarter 1991 ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070N8901991-03-15015 March 1991 Forwards Decommissioning Funding Statement of Intent,Per 10CFR50.75 for Pulstar Reactor Facility ML20066D7781991-01-0707 January 1991 Submits List of Personnel Changes in Positions Identified by Figure 6.1-1 of Tech Specs (Amend 8).Mailing List Should Be Corrected to Reflect Changes ML20059D1391990-08-31031 August 1990 Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 ML20055H9161990-07-24024 July 1990 Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility ML20055G6441990-07-20020 July 1990 Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) ML20055H0831990-07-18018 July 1990 Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info ML20042E2951990-04-17017 April 1990 Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) 1999-02-02
[Table view] |
Text
)
i- . .
North Carolina State University b ,
Nuclear Reactor Program
' ~
Department of Nuclear Engineering Box 7909 Haleigh, NC 2786-7909 (919) 515-2321 fax (919) 515-5115 15 September 1995 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
NCSU PULSTAR REACTOR EMERGENCY PLAN REVISION 3 SUllMITTAL UNDER 10 CFR 50.54(q)
Docket No.: 50-297 License No.: R-120
Dear Sir or Madam:
Pursuant to the provisions of 10CFR 50.54(q), North Carolina State University is hereby submitting the facility's revised Emergency Plan following the instructions in 10CFR50.4(b)(5). The changes in the Emergency Plan do not decrease the effectiveness of the Plan and Revision 3 of the Plan continues to meet the requirements of 10 CFR 50 Appendix E.
, Revision 3 of the Plan reflects the revised 10CFR20 and incorporates the North Carolina State University Incident Command System (ICS). Additionally, Appendix B has been revised to facilitate off-site dose rate calculations. A summary of the substantive changes is attached.
If you have any questions concerning this reply, please contact me at (919) 515-4601 or Mr.
Perez at (919) 515-4602.
Sincerely yours, d k. N f$ Pedro B. Perez Gerald D. Wicks, CHP g80- Associate Director Reactor IIealth Physicist og Nuclear Reactor Program
@o gx
Attachment:
NCSU Emergency Plan, Revision 3 o
oc copy w/ attachment: U.S.N.R.C., Region II, Regional Administrator (2 copies) y Dr. James Knopp, Chairman, Radiation Protection Council
$g Dr. Charles Mayo, Chairman, Reactor Safety and Audit Committee r o o.u.
' ' ' 7 *? Dr. Merrick liarrison, Radiation Protection Officer f
)i North Carolina State University is a land-grant university and a constituent institution of The University of North Carolina.
A NCSU PULSTAR Reactor g l Docket No. 50-297 License No. R-120
SUMMARY
OF CHANCES FOR EMERGENCY PLAN REVISION 3
' SECTION DESCRIPTION OF CHANGES 1 (1) Ucensing and regulatory documents are referenced. Titles changes were made.
(2) Minor wording changes were made to emphasize that only the NRP may implement this emergency plan.
3 (1) Descriptions of the incident Command System (ICS) and PULSTAR Emergency Organization (PEO) are given including responsibilities and relationships.
(2) Emergency position descriptions were modified to reflect ICS and PEO responsibilities. ICS responds to emergencies involving off-site hazards and non-radioactive hazards. PEO responds to emergencies invoMng on-site radiation hazards and reactor operations.
Emergency Coordinator or Emergency Director report to the ICS to ensure actions are coordinated and communication is established with the PEO. Title changes were also made.
(3) NCSU Environmental Health & Safety Center functions were added.
(4) Department of Energy was deleted from the Off-Campus Support listings.
5 (1) Emergency Action Level (EAL) basis was referenced.
(2) Ventilation modes and atmospheric dilution are briefly described.
(3) Notification of Unusual Event (NUE) and Alert classification airborne effluent concentration limits in the Confinement mode with BEL dilution were increased by 25% The previous values were incorrectly based on the difference between normal and confinement ventilation modes. The new values are correctly based on dilution which occurs outside of the Reactor Bay by the R-3 (expired R-63 license) fans.
(4) NUE classification based on fire was changed to specify safety significant equipment with no time constraints.
(5) Criteria for NUE and Alert classification based on fuel damage were added and are compared to FSAR values. No quantitative limits were given previously.
7 (1) ICS description and functions were added along with a description of the relationship between the ICS and PEO. Title changes were made.
(2) Notification process was changed to clarify the expected sequence or initiating cues.
(3) Evacuation criteria were changed to allow staffing of the Control Room as long as habitability requirements are met. Previously the Control Room could have been prematurely evacuated, thereby resulting in a non-conservative action. This change ensures reactor parameters can be monitored safely throughout the emergency.
(4) Personnel dose limits were changed to those given in ANSI /ANS 15.11 1993.
8 (1) ICS equipment and facility information were added. PEO equipment and facility information were updated.
(2) Minor wording changes were made for clarification.
g (1) NCSU support groups are listed as such in the recovery organization.
(2) Title changes were made.
2,4,6,10 No significant changes. Minor wording changes were made for clarificatian.
2 Tables (1) Quantities were deleted for emergency equipment. Necessary quantities of equipment will be included in be Emergency Procedure on equipment inventory.
(2) Table 6 was formerly Figure 6.
Figures (1) Maps were updated in Figures 1 and 2.
(2) NRP organizational chart was updated.
(3) PEO and ICS organizational chart is given.
Appendices (1) Appendix A
- Letters of Agreement" with off site organizations are included from the city, county, and state. Letters from Rex Hospitgl and the gli Emergency Commun: cation Center have been requested but not yet received. A 1g94 letter from Rex Hospital is included.
(2) Appendix B was expanded to describe in detail how release rate, concentration, and off-site dose projections can be made for airborne effluent.
4 (3) Procedure for
- Emergency Locker inventory" was added to Appendix C.
I 1