MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20100R3661996-02-19019 February 1996 Forwards Radionuclide Annual Emissions Rept for 1995, Including Output from Computer Code Comply Version 1.5d ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes 1999-03-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes ML20127P8091992-11-30030 November 1992 Forwards Offsite Dose Calculation for Noble Gases, in Response to 900418 Request for Addl Info in Support of 880419 License Renewal Application.Analysis Addresses Dose to Receptor in Unrestricted Areas Proximate to Facility ML20114B9421992-08-27027 August 1992 Responds to NRC Re Violations Noted in Insp Rept 50-297/92-01.Corrective Actions:Emergency Plan & Procedures Currently Under Review & self-contained Breathing Apparatus Placed on Maint Contract W/Approved Vendor ML20099K2651992-08-21021 August 1992 Forwards Pulstar Annual Rept to NRC for Jul 1991-June 1992, North Carolina State Univ Nuclear Reactor Program & Environ Radiation Surveillance Rept for Jul 1991-June 1992 ML20091Q3191992-01-22022 January 1992 Notifies That Pb Perez Assigned Assoc Director,Nuclear Reactor Program Effective 920201 ML20086C6381991-11-13013 November 1991 Submits Info to Correct Data Base & for Consideration When Reviewing Written Exam Administered on 911112 by P Isaac ML20082H8121991-08-21021 August 1991 Forwards Pulstar Annual Rept to NRC for Jul 1990 to June 1991 & Environ Radiation Surveillance Rept for Jul 1990 to Jul 1991 ML20082E3321991-06-27027 June 1991 Submits Listing of Personnel Changes Identified in Figure 6.1-1 of Amend 8 to Tech Specs.G Miller Resigned Position as Associate Director on 910625.Univ Anticipates Hiring Individual to Fill Position in Fourth Quarter 1991 ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070N8901991-03-15015 March 1991 Forwards Decommissioning Funding Statement of Intent,Per 10CFR50.75 for Pulstar Reactor Facility ML20066D7781991-01-0707 January 1991 Submits List of Personnel Changes in Positions Identified by Figure 6.1-1 of Tech Specs (Amend 8).Mailing List Should Be Corrected to Reflect Changes ML20059D1391990-08-31031 August 1990 Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 ML20055H9161990-07-24024 July 1990 Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility ML20055G6441990-07-20020 July 1990 Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) ML20055H0831990-07-18018 July 1990 Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info ML20042E2951990-04-17017 April 1990 Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) 1999-02-02
[Table view] |
Text
.
\
) , "j[' North Carolina State University 1 Nuclear Reactor Program Department of Nuclear Engineering Box 7909 Raleigh. NC 27095 7909 Q51%3333 93 19 February 1996 l
U.S. Nuclear Regulatory Commission Region ll Attn: Mr. Craig Bassett Senior inspector, Fuels Facility Branch Division of Nuclear Materials Safety 101 Marietta Street, N.W.
Suite 2900 Atlanta, GA 30323-0199 I
Subject:
1995 PULSTAR Research Reactor Emergency Drill Critique Docket No.: 50-29'7 License No.: R-120 l
Dear Mr. Bassett:
The PULSTAR reactor facility performed an announced emergency drill on 21 December 1995 between 0800 and 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />. Off-site support organizations participated at this drill. l Overall, the drill was considered successfulin that it provided a comprehensive test of the !
PULSTAR Emergency Plan and Procedures.
A critique was held immediately following the drill. A summary of the critique comments is attached for your information. If you have any questions or comments, please call me at (919) 515-4602 or Gerald Wicks, CHP at (919) 515-4601.
Sincerely, b.
Pedro B. Perez Associate Director, Nuclear Reactor Program cc: C. Mayo, Ph.D.,NCSU, Chairman, RSAC G. Wicks, CHP, NCSU 9603120477 960219 PDR F ADOCK 05000297 pyg North Carolina State University is a land-grant university and a constituent institution of The Universuy of North Carolina. ;
.fl$f
)
1 4
1995 PULSTAR DRILL CRITIQUE License R-120 Docket No. 50-297 An announced drill was held on 21 Dec 95. Only the time and date were announced in advance. ,
Knowledge of the drill scenario was limited to G. Wicks, C. Mayo, and D. Rainer of NCSU.
l Participating organizations included:
Nuclear Reactor Program NCSU Environmental Health & Safety NCSU Public Safety Wake County Major Response and Logistics Division State of NC Division of Radiation Protection Raleigh Fire Department Drill controllers included:
l C. Mayo, Ph.D., NCSU, Director of Nuclear Reactor Program and Chair of Reactor Safety and Audit Committee I S. Pressley, NCSU, Nuclear Engineering (student)
S. Vojta, NCSU, Nuclear Engineering (student)
C. tilan, NCSU, Nuclear Engineering (student)
Drill observers included:
1 D. Rainer, NCSU, Director of Environmental Health & Safety J. James, State of NC, Division of Radiation Protection D. Bass, Wake County Major Response and Lo0 1stics i N. Cheek, Wake County Major Response and Logistics <
J. Knopp, Ph.D., NCSU, Chair of Radiation Protection Committee Drill Events:
The written scenario was followed for events related to the PULSTAR reactor. However, an unrelated hazardous materials event which was included in the written scenario was cancelled during the PULSTAR drill by NCSU personnel (D. Rainer and G. Wicks). The PULSTAR drill response included a hazardous materials response by NCSU and the City of Raleigh Fire Department.
Drill actions and simulations included: (see the attached Drill Log)
- Assessment and corrective actions
- Classification and Notification
l l
1995 PULSTAR DRILL CRITlQUE License R-120 l Docket No. 50-297 DRILL LOG:
NOTE: Most drill actions were performed or simulated. Availability of equipment and supplies were j checked before simulating actions. !
8:22 Reactor at 950 kW.
8:30 Shaking and vibration of BEL occurs.
Reactor operator commenced shutdown by gang insert of control rods.
8:35 Occupants in reactor bay leave and call Control Room.
Personnel are safe and not contaminated and report experiencing building vibrations.
8:40 Reactor shutdown verified and reactor key off.
NRP personnel arrive in Control Room.
8:45 Primary pool level decreasing.
Primary pump was shut off.
NCSU Public Safety was called and shaking and vibrations in other areas on campus were reported. NRP staff determines that emergency action levels have been met and begin call out of the PEO. NCSU Public Safety and Radiation Protection were Informed of the need i for emergency response.
8:55 Primary valves P-1 and P-5 were closed using remote, manual controllers. ,
NRP staff searches for leak location in reactor bay. 1 9:00 Leaks found in pipe trenches at valves P-17 and P 18.
9:05 Radiation Protection Officer arrives at Control Room. NRP activates PEO, declares )
" Unusual Event" and begins off site notifications.
9:10 BEL evacuated by pulling of fire alarm.
9:15 NCSU Public Safety arrives and sets up ICS.
Raleigh Fire Dept. and Wake County arrive outside of BEL 9:20 BEL is re-entered by PEO team. Radiation monitor data was obtained by remote readout from room 2123 (outside Control Room).
9:30 Radiation survey indicates no altborne or contaminated areas inside of reactor bay.
High radiation alarm at Over the-Pool occurs. Emergency classified as " Alert". Off-site ,
notifications are made. I 9:45 Control Room and reactor bay entries were made. Fire hose was positioned over pool wall and pool fill begins. However, fill rate and leak rate were the same so no change in pool level was observed. Request for second fire hose was made by PEO.
2
l l
1995 PULSTAR DRILL CRITIQUE License R-120 Docket No. 50-297 DRILL LOG:
10:00 Control Room radiation monitor reaches high alarm. PEO evacuates Control Room and moves to NRP offices on second floor.
10:15 RHP surveys reactor bay. No airborne contamination or removable contamination was detected.
10:30 Control Room and reactor bay are re-entered.
Repairs are made to P-17 and P-18 leaks.
Second fire hose put in position and pool fill begins.
Radiation surveys were performed.
10:45 Radiation levels decrease.
Pool level was checked by observation using a mirror.
10:55 Pool fill complete and fire hoses were shut off.
Radiation levels near normal.
Recovery actions and organization were briefly discussed.
Drill terminated and off-site notifications were made.
Definitions:
)
NRP is Nuclear Reactor Program PEO is PULSTAR Emergency Organization iCS is incident Command System BEL is Burlington Engineering Laboratory 3
1
. . I a
1995 PULSTAR DRILL CRITIQUE License R-120 Docket No. 50-297 COMMENTS:
COMMENT 'RESPONSEL ICS and PEO organizations operated well. None Support organizations operated weX.
Technical Advisor was needed at the second ICS This should be provided by the ICS. Members command post. of the NCSU Radiation Protection Division are famHiar with the facIlty. PEO staff are few and dedicated to the emergency response the in reactor buuding.
Emergency Plan needs buuding diagrams. Suuding diagrams are available in the PULSTAR FSAR and will be placed in the BEL lock box.
Fire alarm was sounded prematurely. Fire alarm was sounded as directed by NCSU Buuding searches after fire alarm was sounded Public Safety for logistical reasons rather than and after abnormal radiation levels were for public safety. If necessary, buHding searches detected were not performed. are to be coordinated by the ICS. In this drul, the Raleigh Fire Department and PEO were avaHable to perform this search.
Telephone number for public inquiries is needed. Public information is addressed by the ICS.
Inquiries are to be directed as specified by the ICS Fublic Information Officer or NCSU News Services.
Scenario time-line may not have been realistic The general sequence of events was realistic, for the postulated event. but on a compressed time-line to avoid delays.
Scenario needed visual aids and better data Comment noted. To be considered in tables. development of future drills. j Some items in emergency lockers are old and Emergency lockers are inventoried quartedy for should be checked and updated. content and functional status of materials.
RHP wHI re-verify inventory status. Materials used in the drill were functional. j Emergency materials for pipe repairs and Most piping sections can be isolated to permit equipment for pool ful should be kept readily repairs. Other potential leaks are variable and available for this type of credible event. materials required would depend on the leak. l Most materials are avaHable in the reactor bay or at other locations within the BEL Staging of emergency pool fill equipment wHl be considered by the NRP.
Commualcations within the PEO and ICS need Individuals will be reminded of this in emergency to be more consistent. plan training. ,
Common radio channel is needed for NCSU NRP to determine feasibuity of using a common personnel. radio frequency with Public Safety and EHSC.
4
. 1 1995 PULSTAR DRILL CRITIQUE License R-120 Docket No. 50-297 CONCLUSIONS:
- Drill objectives were met.
- 1. PEO and NCSU ICS were staffed within an hour.
- 2. PEO assessment and corrective actions were timely and appropriate.
- 3. PEO correctly classified the emergency initially and later on escalated the emergency classification as required by the PULSTAR Emergency Plan.
- 4. PEO made off-site notifications within 30 minutes of emergency classification and i termination.
! 5. PEO obtained assistance from NCSU Public Safety, NCSU Environmental Health & Safety, Raleigh Fire Department, and Wake County, as needed, using the ICS.
- 6. PEO terminated the emergency upon resolution of the postulated event. Recovery actions
! and the need for a recovery organization as required by the PULSTAR Emergency Plan and i Emergency Procedures were discusstd in general prior to termination.
i e Although the drill deviated slightly from the written t,cenario, these deviations were not significant in that the drill provided a successful and comprehensive test of the PULSTAR Emergency Plan.
COMMITMENTS:
- 1. RHP to re-verify emergency locker inventory status.
- 2. RHP to discuss proper communication in training.
- 3. RHP to consider use of more visual aids for future diills.
- 4. RHP to provide building diagrams for the BEL lock box to NCSU Public Safety.
- 5. Associate Director to consider staging of emergency pool fill equipment.
- 6. Associate Director to determine feasibility of using a common radio frequency with Public Safety and EHSC.
5 l