Forwards Signature Page of Util 891208 Request for Exemption from Primary Containment Leak Rate Testing Requirements,Per 10CFR50.54(o) & App J,Paragraphs III.D.1 Through III.D.3
ML20011D542
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/11/1989
From: Harlow D
HUNTON & WILLIAMS, LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912270375
Download: ML20011D542 (2)


Text

--

+ A e

  • s Huxrox 6e WI LLI AM s 707 East MAIN Statti P.o. Box 1535

"'","['!",'",*,,"**'"'*'

, R cnwowo.V2mo2x2 A eoeae , , , ', ,',,"',", ",'((", ,0 0,,

was.eswovow. o. c. aoo se tt6temont tea soo-sooo tt6traowt sos eas inco , ,

it6tm aa+6*o Huwt vi einst vinoimia sAwa tows m '"' "'*** "'*'"'

e.o. com aeos TELtx 684251 "'."O.

P com eos schrota,vemosnia esse

  • TELtcopica 804-788 8218 =AttioM. wonta canov=A et60s etLtewows soe-eas osos vt6tracht evo *>o sooo FID$t itNht $$tt W&hR DuttoiNO Joto chasN DheD0t DoAo P+ o* DON #bs P. o. Don 1547 RNokv4LLt e ttNNtSStt 3?wes FA RFAR,Viho(Nia ##cSo Tgf kt>MoNt StS* $$t 4316 ve6t >wont tos ssa etoo 3500 oNC ATLANTA P6Ath t &o ta tt Pat t e 9 t h at hoA o osktet osAL he. Doe 786-A,6 A .,A. . t o..ia .. ... December 11, 1989 ttLtPMoNEeoe Deit?co U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Shoreham Nuclear Power Station Docket No. 50-322 Gentlemen:

On December 8, 1989, Long Island Lighting Company submitted its Request for an Exemption from the Primary Containment Leak Rate Testing Requirements of 10 C.F.R. S 50.54(o) and Appendix J, T III.D.1 through III.D.3. As promised at that time, enclosed is the original signed copy of the Request's signature page.

Very truly yours, I .

v. ,

w David S. Harlow One of counsel for Long Island Lighting Company Enclosure cc: S. Brown (w/o enclosure)

W. T. Russell (w/o enclosure)

F. Crescenzo (w/o enclosure) r l I,I L 1

\\

8912270375 891211 PDR ADOCK 05000322 P PNV a

load fuel, NPF-19, on December 7,1984, LILCO has performed periodically primary containment leak rate testing, in compliance with Appendix J.E Moreover, under LILCO's systems lay-up program, even without Appendix J testing the pipes and valves for which such testing is designed will be protected from degradation pending Shoreham's transler to New York State.

l IV. Conclusion For the reasons given above, LILCO respectfully requests that the NRC grant the Company an exemption from 10 C.F.R. S 50.54(o) and, in turn, the primary contain-ment leak rate testing requirements of 10 C.F.R. Part 50, Appendix J.11II.D.1 through

!!I.D.3.

Respectf ully submitted, A/

/ - _

~

letor A.' SF leri General Co'ansel l Long Island Lighting Company Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 Of Counsel l liunton & Williams l 707 East blain Street

! P.O. Box 1535 i

Richmond, Virginia 23212 DATED: December 8,1989 l

$/ For instance, on January 19-21, 1987, an unannounced Containment Integrated i Leak Rate Test (CILRT) was conducted at Shoreham by the NRC. Within the scope of L the inspection, no violations were observed. NRC Inspection Report 50-322/87-02 de-scribes the results of this inspection. In addition, on April 21,1987, LILCO submitted to the NRC its own report on the results of the CILRT, as well as a summary analysis ct the local leak rate tests conducted in 1986.

i ame