ML20011D542
| ML20011D542 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 12/11/1989 |
| From: | Harlow D HUNTON & WILLIAMS, LONG ISLAND LIGHTING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8912270375 | |
| Download: ML20011D542 (2) | |
Text
--
A
+*
e s
Huxrox 6e WI LLI AM s 707 East MAIN Statti P.o. Box 1535
,,, ',,',,"',", ",'((",,0 0,,
- * "'","['!",'",*,,"**'"'*'
R cnwowo.V2mo2x2 A eoeae was.eswovow. o. c. aoo se tt6temont tea soo-sooo tt6traowt sos eas inco it6tm aa+6*o Huwt vi einst vinoimia sAwa tows m TELtx 684251
"'."O.com eos e.o. com aeos P
schrota,vemosnia esse
- TELtcopica 804-788 8218
=AttioM. wonta canov=A et60s etLtewows soe-eas osos vt6tracht evo *>o sooo FID$t itNht $$tt W&hR DuttoiNO Joto chasN DheD0t DoAo P+ o* DON #bs P. o. Don 1547 RNokv4LLt e ttNNtSStt 3?wes FA RFAR,Viho(Nia ##cSo Tgf kt>MoNt StS* $$t 4316 ve6t >wont tos ssa etoo 3500 oNC ATLANTA P6Ath t &o ta tt Pat t e 9 t h at hoA o osktet osAL he. Doe 786-December 11, 1989 A,6 A.,A.. t o..ia.....
ttLtPMoNEeoe Deit?co U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Shoreham Nuclear Power Station Docket No. 50-322 Gentlemen:
On December 8, 1989, Long Island Lighting Company submitted its Request for an Exemption from the Primary Containment Leak Rate Testing Requirements of 10 C.F.R.
S 50.54(o) and Appendix J, T III.D.1 through III.D.3.
As promised at that time, enclosed is the original signed copy of the Request's signature page.
Very truly yours, I
v.
w David S. Harlow One of counsel for Long Island Lighting Company Enclosure cc:
S. Brown (w/o enclosure)
W. T. Russell (w/o enclosure)
F. Crescenzo (w/o enclosure) r l
I,I L
\\\\
1 8912270375 891211 PDR ADOCK 05000322 P
PNV a
load fuel, NPF-19, on December 7,1984, LILCO has performed periodically primary containment leak rate testing, in compliance with Appendix J.E Moreover, under LILCO's systems lay-up program, even without Appendix J testing the pipes and valves for which such testing is designed will be protected from degradation pending Shoreham's transler to New York State.
l IV. Conclusion For the reasons given above, LILCO respectfully requests that the NRC grant the Company an exemption from 10 C.F.R. S 50.54(o) and, in turn, the primary contain-ment leak rate testing requirements of 10 C.F.R. Part 50, Appendix J.11II.D.1 through
!!I.D.3.
Respectf ully submitted, A/
/
~
letor A.' SF leri General Co'ansel l
Long Island Lighting Company Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 Of Counsel l
liunton & Williams l
707 East blain Street P.O. Box 1535 i
Richmond, Virginia 23212 DATED: December 8,1989 l
$/
For instance, on January 19-21, 1987, an unannounced Containment Integrated Leak Rate Test (CILRT) was conducted at Shoreham by the NRC. Within the scope of i
L the inspection, no violations were observed. NRC Inspection Report 50-322/87-02 de-scribes the results of this inspection. In addition, on April 21,1987, LILCO submitted to the NRC its own report on the results of the CILRT, as well as a summary analysis ct the local leak rate tests conducted in 1986.
i ame