ML18193A911

From kanterella
Jump to navigation Jump to search
Figure 10.1-1, Process Flow Diagram Steam and Power Conversion System. Sheet 1 of 2
ML18193A911
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/19/1976
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
10.1.1
Download: ML18193A911 (1)


Text

STEAM DUMP VALVES TO ATMOSPHERE TO ATMOSPHERE 2

22 REHEATERS CONTAINMENT TO ATMOSPHERE MAIN TURBINE 10 22 STOP INTERCEPT STOPINTERCEPT STOPINTERCEPT MAIN FEEDWATER 150 L AT I 0N CONTROL 1ST 2ND VALVE VALVE VALVE CONTROL VALVE VALVES VALVES MAIN STEAM MAIN STEAM MAIN MOISTURE SAFETY ISOLATION TURBINE SEPARATOR STEAM VALVES GENERATOR VALVES STOP 15 PER VALVES LOW PRESSURE LOW PRESSURE LOW PRESSURE LINEI 23 TURBINE A TURBINE B TURBINE 0 15 5 9 STEAM DUMP HIGH PRESSURE VALVES TO TURBINE REHEATERS 4 4 16 16 16 4 4 4 AT III D5P H ERE 3 3 3 16 16 16 3 3 1ST 2NI 2 2 2 2 11 2 I TO MAIN I I I 2 I ATMOSPHERE TURBINE STOP MOISTURE 22 SEPARATOR VALVES BLOWDOWN TO CONDENSATE CLEANUP TO ATMOSPHERE MAIN STEAM 22 MAIN TURBINE CONTROL VALVES 6d 15 9 9 FROM CIRCULATING INATER SYSTEM 22 TURBINE BYPASS 22 TURBINE BYPASS 12 22 TO CIRCULATING WATER SYSTEM TO PLANT VENT MAIN STEAM TURBINE BYPASS SAFETY VALVES VALVES VALVES ISOLATION OY5 VALVES VAI YES CWS STEAM 24 GENERATOR (5 PER LINE) 19 19 19 AUXILIARY 23 16 MO7DR FEEOWATER j

19 MAIN 14 PUMP MAIN 24 CONDENSER CONDENSER 17 MAKEUP FEED DEMINERALIZE CDNOENSATE WATER MAKEUP TANK MAIN TURBINE 17 SLOWDOWN TO GLAND STEAM 21 CONDENSA E EXHAUSTER CLEANUP A0 X I LI A R 7 TURBMIB FEEDINATER VACUUM PUMP PUMPS TO AND FROM TURBINE COOLING 17 CONDENSATE CONDENSATE WATER SYSTEM 14 PUMP PUMP AUXILIARY MOTOR FEEDWATER PUMP HEATER HEATER HEATER HEATER TO FEEOWATER PUMPS ATMOSPHERE 4 3 2 I HEATER HEATER HEATER 7 6 5 MOISTURE CHARCOAL POST 19 SEPARATOR BED FILTERS AOSORBERS 15 12 BLOWER 21 HEATER DRAI ~ MCES FILTRATION SYSTEM TANK 10 HEATER HEATER HEATER HEATER FEEOWATER 4 3 2 I HEATER PUMP CONDENSATE DRAIN TURBINE 20 CLEANUP PIJMP SYSTEM 19 MOISTURE CHARCOAL POST SEPARATOR BED FILTERS ADSORBERS BI.OWER HEATER HEATER HEAIER HEATER HEATER HEATER HEATER 21 7 6 5 I MCES FILTRATIONSYSTEM 4 3 2 12 F EDWATER Arizona Nuclear Power Project 19 15 PUMP TURBINE 10 Palo Verde Nuclear Generating Station Units 1, 2 & 3 HIGH PRESSURE FEEOWATER PIEATERS HEATE R DRAIN LOW PRESSURE FEEDWATER HEATERS 20 7A NK PROCESS FLOW DIAGRAN HEATER STEAM AND POWER CONVERSION SYSTEN IN DR A PUMP (St2eet 1 of 2)

CHANGE'0407-IIA-105 Figure 10.1-1 103A5 January 19, 1976 Amendment 15