ML18193A080
| ML18193A080 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/30/2018 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 10.4-9 | |
| Download: ML18193A080 (1) | |
Text
TO FEEOWATER HEADEI STEAM GENERATOR NO I
-G PDI CR FROM REACTOR MAKEUP TANK LO FROM CONDENSATE TANK FIIOMCHEMICAL ADDITIONSYSTEM LO POI AUXILIARYFEEDWATER PUMP J
AUX FEEOWATER ACTUATIONSYSTEM LO MS IS CR gHS CR
~HS ZSL ZSH ZSH ZEL CR CR gHS ZT FAI
. 0 ZT ZT FAI CR Zl
~32
+HS ZT TO LOWEST FEEOWATER NOZZLE STEAM GENERATOR NO FROM REACTOR MAKEUP TANK LO CR ZSH
- G C.
PDI POI AUXILIARYFEE DWATER PUMP AUX FEEDWATER ACTUATIONSYSTEM jjU ZSL ZSH ZSL CR I I--
ZEH MSIS HS
'6"-
I I
I I
L FAI J
C.
+HS FAI CR
+HS CR0 CR0 ZT IFAI 3
2 J
CR CR I
Zl HS F AI CR QHS
+32 ZT TD FEEDWATER HEADER STEAM GENERATOR NO 2
TO LOWEST FEEDWATER NOZZLE STEAM GENERATOR NO 2
FAI FAI CR FR RE CIRC TO CDNDE NSATE TANK Arrzona Nuclear Power Prolect Palo Verde Nuclear Generating Station Units 1,2 & 2 AUXILIARYFEEDWATER SYSTEM Figure 10.4-9 IO407- ~ I A SAP4-43