ML19205A220
ML19205A220 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 06/30/2019 |
From: | Stephenson C Arizona Public Service Co |
To: | Office of Nuclear Reactor Regulation |
References | |
102-07935-MLL/TNW | |
Download: ML19205A220 (123) | |
Text
PVNGS Palo Verde Nuclear Generating Station Units 1, 2, and 3 Updated Final Safety Analysis Report Figures Revision 20 June 2019 Stephenson,
_ I E)N: cn=Stephensoi\ Carl CSrI J(Z05778)
Reason: 1 attest to the accuracy I (yr\ C 7 7Q^ and integrity of this document J\£^\Jj/ / Of Date;2019.06^8 13:49:53-0700 PaloVerde GENERATING STATION
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision CHAPTER 1 TAB -- Fig. 2.3-3 11 Fig. 2.4-34 11 Fig. 2.3-4 11 (Sh 1 of 3) 11 1.1 Tab -- Fig. 2.3-5 11 (Sh 2 of 3) 11 None Fig. 2.3-6 11 (Sh 3 of 3) 11 Fig. 2.3-7 11 Fig. 2.4-35 1.2 Tab -- Fig. 2.3-8 11 (Sh 1 of 3) 11 Fig. 2.3-9 11 (Sh 2 of 3) 11 Fig. 1.2-1 11 Fig. 2.3-10 11 (Sh 3 of 3) 11 Fig. 1.2-2 15 Fig. 2.3-11 11 Fig. 2.4-36 Fig. 2.3-12 11 (Sh 1 of 4) 11 1.3 Tab -- Fig. 2.3-13 11 (Sh 2 of 4) 11 None Fig. 2.3-14 11 (Sh 3 of 4) 11 Fig. 2.3-15 15 (Sh 4 of 4) 11 1.4 Tab -- Fig. 2.3-16 11 Fig. 2.4-37 None Fig. 2.3-17 11 (Sh 1 of 4) 11 Fig. 2.3-18 11 (Sh 2 of 4) 11 1.5 Tab -- Fig. 2.3-19 11 (Sh 3 of 4) 11 None Fig. 2.3-20 11 (Sh 4 of 4) 11 Fig. 2.3-21 11 Fig. 2.4-38 1.6 Tab -- Fig. 2.3-22 11 (Sh 1 of 6) 11 None Fig. 2.3-23 11 (Sh 2 of 6) 11 (Sh 3 of 6) 11 1.7 Tab -- 2.4 Tab -- (Sh 4 of 6) 11 None (Sh 5 of 6) 11 Fig. 2.4-1 15 (Sh 6 of 6) 11 1.8 Tab -- Fig. 2.4-2 16 Fig. 2.4-39 16 None Fig. 2.4-3 11 Fig. 2.4-40 15 Fig. 2.4-4 15 Fig. 2.4-42 16 1.9 Tab -- Fig. 2.4-5 11 None Fig. 2.4-6 11 2.5 Tab --
Fig. 2.4-7 11 1A Tab Fig. 2.4-8 11 Fig. 2.5-1 11 None Fig. 2.4-9 11 Fig. 2.5-2 11 Fig. 2.4-10 11 Fig. 2.5-3 11 CHAPTER 2 TAB -- Fig. 2.4-11 11 Fig. 2.5-4 11 Fig. 2.4-12 11 Fig. 2.5-5 11 2.1 Tab -- Fig. 2.4-13 11 Fig. 2.5-6 11 Fig. 2.4-14 11 Fig. 2.5-7 11 Fig. 2.1-1 15 Fig. 2.4-15 Fig. 2.5-8 11 Fig. 2.1-2 11 (Sh 1 of 4) 11 Fig. 2.5-9 11 Fig. 2.1-3 11 (Sh 2 of 4) 11 Fig. 2.5-10 Fig. 2.1-4 15 (Sh 3 of 4) 11 (Sh 1 of 3) 11 Fig. 2.1-5 11 (Sh 4 of 4) 11 (Sh 2 of 3) 11 Fig. 2.1-6 11 Fig. 2.4-16 11 (Sh 3 of 3) 11 Fig. 2.1-7 11 Fig. 2.4-17 11 Fig. 2.1-8 11 Fig. 2.4-18 11 Fig. 2.5-11 15 Fig. 2.1-9 11 Fig. 2.4-19 Fig. 2.5-12 15 Fig. 2.1-10 11 (Sh 1 of 2) 11 Fig. 2.5-13 11 Fig. 2.1-11 11 (Sh 2 of 2) 11 Fig. 2.5-14 15 Fig. 2.1-12 11 Fig. 2.4-20 11 Fig. 2.5-15 11 Fig. 2.1-13 11 Fig. 2.4-21 11 (Sh 1 of 3) 11 Fig. 2.1-14 11 Fig. 2.4-22a 15 (Sh 2 of 3) 11 Fig. 2.1-15 15 Fig. 2.4-22b 15 (Sh 3 of 3) 11 Fig. 2.4-22c 15 Fig. 2.5-16 11 2.2 Tab -- Fig. 2.4-23 15 Fig. 2.5-17 11 Fig. 2.2-1 15 Fig. 2.4-25 19 Fig. 2.5-18 15 Fig. 2.2-2 11 Fig. 2.4-25A 16 Fig. 2.5-19 15 Fig. 2.2-3A 16 Fig. 2.4-26 15 Fig. 2.5-20 11 Fig. 2.2-3B 16 Fig. 2.4-27 11 Fig. 2.5-21 15 Fig. 2.2-4 18 Fig. 2.4-28 16 Fig. 2.5-22 15 Fig. 2.4-29 15 Fig. 2.5-23 11 2.3 Tab -- Fig. 2.4-30 15 Fig. 2.5-24 11 Fig. 2.4-31 11 Fig. 2.5-24A 11 Fig. 2.3-1 11 Fig. 2.4-32 11 Fig. 2.5-25 11 Fig. 2.3-2 11 Fig. 2.4-33 15 Fig. 2.5-26 11 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 2.5-27 11 (Sh 1 of 3) 11 2B Tab --
Fig. 2.5-28 11 (Sh 2 of 3) 11 None Fig. 2.5-28A 11 (Sh 3 of 3) 11 Fig. 2.5-29 11 Fig. 2.5-58 2C Tab --
Fig. 2.5-30 11 (Sh 1 of 3) 11 None Fig. 2.5-30A 11 (Sh 2 of 3) 11 Fig. 2.5-30B 11 (Sh 3 of 3) 11 Fig. 2.5-30C 11 Fig. 2.5-59 11 2D Tab --
Fig. 2.5-30D 11 Fig. 2.5-60 11 Fig. 2.5-30E 11 Fig. 2.5-61 11 Fig. 2D-1 11 Fig. 2.5-30F 11 Fig. 2.5-62 11 Fig. 2D-2 11 Fig. 2.5-30G 11 Fig. 2.5-63 11 Fig. 2D-3 11 Fig. 2.5-30H 11 Fig. 2.5-64 11 Fig. 2D-4 11 Fig. 2.5-30I 11 Fig. 2.5-65 15 Fig. 2D-5 11 Fig. 2.5-30J 11 Fig. 2.5-66 15 Fig. 2D-6 11 Fig. 2.5-31 11 Fig. 2.5-67 11 Fig. 2.5-31A 11 Fig. 2.5-68 11 2E Tab --
Fig. 2.5-31B 11 Fig. 2.5-69 11 None Fig. 2.5-32 11 Fig. 2.5-70 11 Fig. 2.5-33 11 Fig. 2.5-71 11 2F Tab --
Fig. 2.5-34 11 Fig. 2.5-72 11 None Fig. 2.5-35 11 Fig. 2.5-73 11 Fig. 2.5-35A 11 Fig. 2.5-74 11 2G Tab --
Fig. 2.5-35B 11 Fig. 2.5-75 11 Fig. 2G-1 15 Fig. 2.5-35C 11 Fig. 2.5-76 11 Fig. 2.5-36 11 Fig. 2.5-77 11 CHAPTER 3 TAB --
Fig. 2.5-36A 11 Fig. 2.5-78 11 Fig. 2.5-36B 11 Fig. 2.5-79 11 3.1 Tab --
Fig. 2.5-36C 11 Fig. 2.5-80 11 None Fig. 2.5-36D 11 Fig. 2.5-81 11 Fig. 2.5-37 11 Fig. 2.5-82 11 3.2 Tab Fig. 2.5-37A 11 Fig. 2.5-83 11 None Fig. 2.5-37B 11 Fig. 2.5-84 11 Fig. 2.5-38 11 Fig. 2.5-85 11 3.3 Tab Fig. 2.5-38A 11 Fig. 2.5-86 11 None Fig. 2.5-38B 11 Fig. 2.5-87 11 Fig. 2.5-38C 11 Fig. 2.5-88 11 3.4 Tab --
Fig. 2.5-38D 11 Fig. 2.5-89 11 None Fig. 2.5-39 11 Fig. 2.5-90 11 Fig. 2.5-39A 11 Fig. 2.5-91 15 3.5 Tab --
Fig. 2.5-39B 11 Fig. 2.5-92 12 Fig. 2.5-39C 11 Fig. 2.5-93 12 Fig. 3.5-1 11 Fig. 2.5-39D 11 Fig. 2.5-94 17 Fig. 3.5-2 11 Fig. 2.5-39E 11 Fig. 2.5-95 17 Fig. 3.5-3 11 Fig. 2.5-40 11 Fig. 2.5-96 17 Fig. 3.5-4 11 Fig. 2.5-41 11 Fig. 2.5-97 17 Fig. 3.5-5 16 Fig. 2.5-42 11 Fig. 3.5-6 16 Fig. 2.5-43 11 2A Tab -- Fig. 3.5-7 11 Fig. 2.5-44 11 Fig. 2.5-45 11 Fig. 2A-1 11 3.6 Tab --
Fig. 2.5-46 11 Fig. 2A-2 11 Fig. 2.5-47 11 Fig. 2A-3 11 Fig. 3.6-1 Fig. 2.5-48 11 Fig. 2A-4 11 (Sh 1 of 2) 20 Fig. 2.5-49 11 Fig. 2A-5 11 (Sh 2 of 2) 20 Fig. 2.5-50 11 Fig. 2A-6 19 Fig. 3.6-2 20 Fig. 2.5-51 11 Fig. 2A-7 11 Fig. 3.6-3 20 Fig. 2.5-52 11 Fig. 2A-8 11 Fig. 3.6-4 20 Fig. 2.5-53 11 Fig. 2A-9 11 Fig. 3.6-5 20 Fig. 2.5-54 11 Fig. 2A-10 11 Fig. 3.6-6 20 Fig. 2.5-55 11 Fig. 2A-11 Fig. 3.6-7 20 Fig. 2.5-56 (Sh 1 of 4) 11 Fig. 3.6-8 20 (Sh 1 of 3) 11 (Sh 2 of 4) 11 Fig. 3.6-9 20 (Sh 2 of 3) 16 (Sh 3 of 4) 11 Fig. 3.6-10 20 (Sh 3 of 3) 16 (Sh 4 of 4) 11 Fig. 3.6-11 20 Fig. 2.5-57 Fig. 3.6-12 20 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 3.6-13 20 (Sh 10 of 14) 11 Fig. 3.7.40-7 12 Fig. 3.6-14 20 (Sh 11 of 14) 11 Fig. 3.7.40-8 12 Fig. 3.6-15 20 (Sh 12 of 14) 11 Fig. 3.7.40-8A 13 Fig. 3.6-16 20 (Sh 13 of 14) 11 Fig. 3.6-17 20 (Sh 14 of 14) 11 Fig. 3.6-18 20 Fig. 3.7-22 3.8 Tab --
Fig. 3.6-19 20 (Sh 1 of 12) 11 Fig. 3.6-20 20 (Sh 2 of 12) 11 Fig. 3.8-1 15 Fig. 3.6-21 20 (Sh 3 of 12) 11 Fig. 3.8-2 15 Fig. 3.6-22 20 (Sh 4 of 12) 11 Fig. 3.8-3 15 Fig. 3.6-23 20 (Sh 5 of 12) 11 Fig. 3.8-4 15 Fig. 3.6-24 20 (Sh 6 of 12) 11 Fig. 3.6-25 20 (Sh 7 of 12) 11 3.9 Tab --
Fig. 3.6-26 (Sh 8 of 12) 11 (Sh 1 of 2) 20 (Sh 9 of 12) 11 Fig. 3.9-1 11 (Sh 2 of 2) 20 (Sh 10 of 12) 11 Fig. 3.9.2-1 12 Fig. 3.6-27 20 (Sh 11 of 12) 11 Fig. 3.9.2-2 12 Fig. 3.6-27A 20 (Sh 12 of 12) 11 Fig. 3.9.2-3 12 Fig. 3.6-28 20 Fig. 3.7-23 Fig. 3.9.2-4 12 Fig. 3.6-29 20 (Sh 1 of 22) 11 Fig. 3.9.2-5 12 Fig. 3.6-30 20 (Sh 2 of 22) 11 Fig. 3.9.2-6 12 Fig. 3.6-31 (Sh 3 of 22) 11 Fig. 3.9.2-7 12 (Sh 1 of 2) 20 (Sh 4 of 22) 11 Fig. 3.9.2-8 12 (Sh 2 of 2) 20 (Sh 5 of 22) 11 Fig. 3.9.2-9 12 Fig. 3.6-32 (Sh 6 of 22) 11 Fig. 3.9.2-10 12 (Sh 1 of 2) 20 (Sh 7 of 22) 11 Fig. 3.9.2-11 12 (Sh 2 of 2) 20 (Sh 8 of 22) 11 Fig. 3.9.2-11A 13 Fig. 3.6-33 20 (Sh 9 of 22) 11 Fig. 3.9.2-12 12 Fig. 3.6-34 (Sh 10 of 22) 11 Fig. 3.9.2-13 12 (Sh 1 of 2) 20 (Sh 11 of 22) 11 Fig. 3.9.3-1 12 (Sh 2 of 2) 20 (Sh 12 of 22) 11 Fig. 3.9.4-1 11 (Sh 13 of 22) 11 Fig. 3.9.5-1 11 3.7 Tab -- (Sh 14 of 22) 11 Fig. 3.9.5-2 11 (Sh 15 of 22) 11 Fig. 3.9.5-3 11 Fig. 3.7-1 11 (Sh 16 of 22) 11 Fig. 3.9.5-4 11 Fig. 3.7-2 11 (Sh 17 of 22) 11 Fig. 3.9.5-5 11 Fig. 3.7-3 11 (Sh 18 of 22) 11 Fig. 3.9.5-6 11 Fig. 3.7-4 11 (Sh 19 of 22) 11 Fig. 3.9.5-7 11 Fig. 3.7-5 11 (Sh 20 of 22) 11 Fig. 3.9A-1 12 Fig. 3.7-6 11 (Sh 21 of 22) 11 Fig. 3.9A-2 12 Fig. 3.7-7 11 (Sh 22 of 22) 11 Fig. 3.9A-3 12 Fig. 3.7-8 11 Fig. 3.7-24 11 Fig. 3.9A-4 12 Fig. 3.7-9 11 Fig. 3.7-25 11 Fig. 3.9A-5 12 Fig. 3.7-9A 15 Fig. 3.7-26 11 Fig. 3.9A-6 12 Fig. 3.7-10 11 Fig. 3.7-27 11 Fig. 3.9A-7 12 Fig. 3.7-11 11 Fig. 3.7-28 11 Fig. 3.9A-8 12 Fig. 3.7-12 11 Fig. 3.7-29 11 Fig. 3.7-13 11 Fig. 3.7-30 11 3.10 Tab Fig. 3.7-14 11 Fig. 3.7-31 11 None Fig. 3.7-15 11 Fig. 3.7-32 11 Fig. 3.7-16 11 Fig. 3.7-33 11 3.11 Tab --
Fig. 3.7-17 11 Fig. 3.7-34 11 None Fig. 3.7-18 11 Fig. 3.7-35 11 Fig. 3.7-19 11 Fig. 3.7-36 11 3A Tab --
Fig. 3.7-20 11 Fig. 3.7-37 11 Fig. 3.7-21 Fig. 3.7-38 11 Fig. 3A-1 11 (Sh 1 of 14) 11 Fig. 3.7-39 11 Fig. 3A-2 11 (Sh 2 of 14) 11 Fig. 3.7.40-1 12 Fig. 3A-3 11 (Sh 3 of 14) 11 Fig. 3.7.40-2 12 Fig. 3A-4 (Sh 4 of 14) 11 Fig. 3.7.40-3 12 (Sh 1 of 2) 11 (Sh 5 of 14) 11 Fig. 3.7.40-4 16 (Sh 2 of 2) 11 (Sh 6 of 14) 11 Fig. 3.7.40-4A 13 Fig. 3A-4A 11 (Sh 7 of 14) 11 Fig. 3.7.40-5 12 Fig. 3A-5 11 (Sh 8 of 14) 11 Fig. 3.7.40-5A 13 Fig. 3A-6 11 (Sh 9 of 14) 11 Fig. 3.7.40-6 12 Fig. 3A-6A 11 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 3A-6B 11 Fig. 3B.4-8 15 Fig. 3B.10-2 11 Fig. 3A-7 11 Fig. 3B.4-9 Fig. 3B.10-3 11 Fig. 3A-8 11 (Sh 1 of 2) 11 Fig. 3B.10-4 11 (Sh 2 of 2) 11 Fig. 3B.10-5 11 Fig. 3B.4-10 Fig. 3B.10-6 11 3B Tab -- (Sh 1 of 2) 11 Fig. 3B.10-7 11 (Sh 2 of 2) 11 Fig. 3B.10-8 11 Fig. 3B.2-1 11 Fig. 3B.4-11 Fig. 3B.10-9 11 Fig. 3B.2-2 11 (Sh 1 of 2) 11 Fig. 3B.10-10 11 Fig. 3B.2-3 11 (Sh 2 of 2) 11 Fig. 3B.10-11 11 Fig. 3B.2-4 11 Fig. 3B.4-12 Fig. 3B.10-12 11 Fig. 3B.2-5 11 (Sh 1 of 2) 11 Fig. 3B.10-13 11 Fig. 3B.2-6 11 (Sh 2 of 2) 11 Fig. 3B.10-14 11 Fig. 3B.2-7 11 Fig. 3B.4-13 Fig. 3B.10-15 11 Fig. 3B.2-8 11 (Sh 1 of 2) 11 Fig. 3B.10-16 11 Fig. 3B.2-9 11 (Sh 2 of 2) 11 Fig. 3B.10-17 11 Fig. 3B.2-10 11 Fig. 3B.4-14 Fig. 3B.10-18 11 Fig. 3B.2-11 11 (Sh 1 of 2) 11 Fig. 3B.10-19 11 Fig. 3B.2-12 11 (Sh 2 of 2) 11 Fig. 3B.10-20 11 Fig. 3B.2-13 11 Fig. 3B.4-15 Fig. 3B.10-21 11 Fig. 3B.2-14 11 (Sh 1 of 2) 11 Fig. 3B.10-22 11 Fig. 3B.2-15 11 (Sh 2 of 2) 11 Fig. 3B.10-23 11 Fig. 3B.2-16 11 Fig. 3B.4-16 11 Fig. 3B.11-1 11 Fig. 3B.2-17 11 Fig. 3B.4-17 11 Fig. 3B.11-2 11 Fig. 3B.2-18 11 Fig. 3B.4-18 11 Fig. 3B.13-1 11 Fig. 3B.2-19 11 Fig. 3B.4-19 11 Fig. 3B.13-2 11 Fig. 3B.2-20 11 Fig. 3B.4-20 11 Fig. 3B.13-3 Fig. 3B.3-1 11 Fig. 3B.4-21 11 (Sh 1 of 3) 11 Fig. 3B.3-2 11 Fig. 3B.4-22 11 (Sh 2 of 3) 11 Fig. 3B.3-3 11 Fig. 3B.4-23 (Sh 3 of 3) 11 Fig. 3B.3-4 11 (Sh 1 of 2) 11 Fig. 3B.13-4 11 Fig. 3B.3-5 11 (Sh 2 of 2) 11 Fig. 3B.13-5 11 Fig. 3B.3-6 11 Fig. 3B.6-1 11 Fig. 3B.13-6 Fig. 3B.3-7 11 Fig. 3B.6-2 11 (Sh 1 of 2) 11 Fig. 3B.3-8 11 Fig. 3B.7-1 11 (Sh 2 of 2) 11 Fig. 3B.3-9 11 Fig. 3B.7-2 11 Fig. 3B.13-7 11 Fig. 3B.3-10 11 Fig. 3B.7-3 11 Fig. 3B.13-8 11 Fig. 3B.3-11 11 Fig. 3B.8-1 11 Fig. 3B.13-9 11 Fig. 3B.3-12 11 Fig. 3B.8-2 11 Fig. 3B.13-10 11 Fig. 3B.3-13 11 Fig. 3B.8-3 11 Fig. 3B.13-11 11 Fig. 3B.3-14 11 Fig. 3B.8-4 11 Fig. 3B.13-12 11 Fig. 3B.3-15 11 Fig. 3B.8-5 11 Fig. 3B.13-13 11 Fig. 3B.3-16 11 Fig. 3B.8-6 11 Fig. 3B.13-14 11 Fig. 3B.3-17 11 Fig. 3B.8-7 11 Fig. 3B.13-15 11 Fig. 3B.3-18 11 Fig. 3B.8-8 11 Fig. 3B.13-16 11 Fig. 3B.3-19 11 Fig. 3B.8-9 11 Fig. 3B.13-17 11 Fig. 3B.4-1 Fig. 3B.8-10 11 Fig. 3B.15-1 11 (Sh 1 of 2) 11 Fig. 3B.8-11 11 Fig. 3B.15-2 11 (Sh 2 of 2) 11 Fig. 3B.8-12 11 Fig. 3B.17-1 11 Fig. 3B.4-2 Fig. 3B.8-13 11 Fig. 3B.17-2 11 (Sh 1 of 2) 11 Fig. 3B.8-14 11 Fig. 3B.17-3 11 (Sh 2 of 2) 11 Fig. 3B.8-15 11 Fig. 3B.17-4 11 Fig. 3B.4-3 Fig. 3B.8-16 11 Fig. 3B.17-5 11 (Sh 1 of 2) 11 Fig. 3B.9-1 11 (Sh 2 of 2) 11 Fig. 3B.9-2 11 3C Tab --
Fig. 3B.4-4 Fig. 3B.9-3 11 (Sh 1 of 2) 11 Fig. 3B.9-4 11 Fig. 3C.2-1 11 (Sh 2 of 2) 11 Fig. 3B.9-5 11 Fig. 3C.2-2 11 Fig. 3B.4-5 Fig. 3B.9-6 11 Fig. 3C.2-3 11 (Sh 1 of 2) 11 Fig. 3B.9-7 11 Fig. 3C.3-1 11 (Sh 2 of 2) 11 Fig. 3B.9-8 11 Fig. 3C.3-2 11 Fig. 3B.4-6 Fig. 3B.9-9 11 (Sh 1 of 2) 11 Fig. 3B.9-10 11 3D Tab --
(Sh 2 of 2) 11 Fig. 3B.9-11 11 Fig. 3B.4-7 11 Fig. 3B.10-1 11 Fig. 3D-1 11 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 3D-2 11 4.2 Tab -- None Fig. 3D-3 11 CHAPTER 5 TAB --
Fig. 3D-4 11 Fig. 4.2-1 11 Fig. 3D-5 11 Fig. 4.2-2 12 5.1 Tab --
Fig. 3D-6 11 Fig. 4.2-3 16 Fig. 5.1-3 Fig. 3D-7 11 Fig. 4.2-4 16 (Sh 1 of 2) 15 Fig. 3D-8 11 Fig. 4.2-5 16 (Sh 2 of 2) 15 Fig. 3D-9 11 Fig. 4.2-6 20 Fig. 3D-10 11 Fig. 4.2-7 20 5.2 Tab --
Fig. 3D-11 11 Fig. 4.2-8 12 Fig. 3D-12 11 Fig. 4.2-8A 12 Fig. 5.2-1 Fig. 3D-13 11 Fig. 4.2-8B 20 (Sh 1 of 20) 12 Fig. 3D-14 11 Fig. 4.2-9 11 (Sh 2 of 20) 12 Fig. 3D-15 11 Fig. 4.2-9A 12 (Sh 3 of 20) 12 Fig. 3D-16 11 Fig. 4.2-9B 20 (Sh 4 of 20) 12 Fig. 3D-17 11 Fig. 4.2-10 12 (Sh 5 of 20) 12 Fig. 3D-18 11 Fig. 4.2-11 11 (Sh 6 of 20) 12 Fig. 3D-19 11 Fig. 4.2-12 11 (Sh 7 of 20) 12 Fig. 3D-20 11 Fig. 4.2-13 11 (Sh 8 of 20) 12 Fig. 3D-21 11 Fig. 4.2-14 11 (Sh 9 of 20) 12 Fig. 3D-22 11 (Sh 10 of 20) 12 Fig. 3D-23 11 4.3 Tab -- (Sh 11 of 20) 12 Fig. 3D-24 11 (Sh 12 of 20) 12 Fig. 3D-25 11 Fig. 4.3-1 11 (Sh 13 of 20) 12 Fig. 3D-26 11 Fig. 4.3-2 20 (Sh 14 of 20) 12 Fig. 3D-27 11 Fig. 4.3-3 11 (Sh 15 of 20) 12 Fig. 3D-28 11 Fig. 4.3-4 11 (Sh 16 of 20) 12 Fig. 3D-29 11 Fig. 4.3-6 14 (Sh 17 of 20) 12 Fig. 3D-30 11 Fig. 4.3-7 11 (Sh 18 of 20) 12 Fig. 3D-31 11 Fig. 4.3-8 11 (Sh 19 of 20) 12 Fig. 3D-32 11 Fig. 4.3-9 11 (Sh 20 of 20) 12 Fig. 3D-33 11 Fig. 4.3-10 11 Fig. 5.2-2 Fig. 3D-34 11 Fig. 4.3-11 14 (Sh 1 of 15) 12 Fig. 3D-35 11 Fig. 4.3-12 11 (Sh 2 of 15) 12 Fig. 3D-36 11 Fig. 4.3-13 11 (Sh 3 of 15) 12 Fig. 3D-37 11 Fig. 4.3-14 11 (Sh 4 of 15) 12 Fig. 4.3-15 11 (Sh 5 of 15) 12 3E Tab -- Fig. 4.3-16 11 (Sh 6 of 15) 12 None (Sh 7 of 15) 12 4.4 Tab -- (Sh 8 of 15) 12 3F Tab -- (Sh 9 of 15) 12 None Fig. 4.4-1 11 (Sh 10 of 15) 12 Fig. 4.4-2 11 (Sh 11 of 15) 12 3G Tab -- Fig. 4.4-3 20 (Sh 12 of 15) 12 Fig. 4.4-4 11 (Sh 13 of 15) 12 Fig. 3G-1 11 Fig. 4.4-5 11 (Sh 14 of 15) 12 Fig. 3G-2 11 Fig. 4.4-6 11 (Sh 15 of 15) 12 Fig. 3G-3 11 Fig. 4.4-7 11 Fig. 5.2-3 Fig. 3G-4 11 Fig. 4.4-8 11 (Sh 1 of 18) 12 Fig. 3G-5 11 Fig. 4.4-9 11 (Sh 2 of 18) 12 Fig. 4.4-10 11 (Sh 3 of 18) 12 3H Tab -- Fig. 4.4-11 11 (Sh 4 of 18) 12 Fig. 4.4-12 11 (Sh 5 of 18) 12 Fig. 3H-1 11 Fig. 4.4-13 11 (Sh 6 of 18) 12 Fig. 3H-2 11 Fig. 4.4-14 15 (Sh 7 of 18) 12 Fig. 3H-3 11 Fig. 4.4-15 11 (Sh 8 of 18) 12 Fig. 4.4-16 11 (Sh 9 of 18) 12 CHAPTER 4 TAB -- (Sh 10 of 18) 12 4.5 Tab -- (Sh 11 of 18) 12 4.1 Tab -- None (Sh 12 of 18) 12 (Sh 13 of 18) 12 Fig. 4.1-1 11 4.6 Tab -- (Sh 14 of 18) 12 None (Sh 15 of 18) 12 (Sh 16 of 18) 12 4A Tab -- (Sh 17 of 18) 12 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision (Sh 18 of 18) 12 Fig. 6.2.1-1 15 6.3 Tab --
Fig. 5.2-6 12 Fig. 6.2.1-2 15 Fig. 6.2.1-3 15 Fig. 6.3-2A 5.3 Tab -- Fig. 6.2.1-4 15 (Sh 1 of 2) 11 Fig. 6.2.1-5 15 (Sh 2 of 2) 11 Fig. 5.3-1 11 Fig. 6.2.1-6 Fig. 6.3-2B Fig. 5.3-2 11 (Sh 1 of 3) 15 (Sh 1 of 2) 11 Fig. 5.3-3 11 (Sh 2 of 3) 15 (Sh 2 of 2) 11 Fig. 5.3-3A 11 (Sh 3 of 3) 15 Fig. 6.3-2C Fig. 5.3-4 11 Fig. 6.2.1-7 15 (Sh 1 of 2) 11 Fig. 5.3-5 15 Fig. 6.2.1-8 15 (Sh 2 of 2) 11 Fig. 6.2.1-10 Fig. 6.3-2D 5.4 Tab -- (Sh 1 of 2) 15 (Sh 1 of 2) 11 (Sh 2 of 2) 15 (Sh 2 of 2) 11 Fig. 5.4-1 11 Fig. 6.2.1-11 15 Fig. 5.4-2 15 Fig. 6.2.1-12 Fig. 6.3-2E Fig. 5.4-3 15 (Sh 1 of 2) 15 (Sh 1 of 2) 11 Fig. 5.4-4 11 (Sh 2 of 2) 15 (Sh 2 of 2) 11 Fig. 5.4-5 11 Fig. 6.2.1-13 11 Fig. 6.3-2F Fig. 5.4-6 11 Fig. 6.2.1-14 11 (Sh 1 of 2) 11 Fig. 5.4-7 11 Fig. 6.2.1-15 11 (Sh 2 of 2) 11 Fig. 5.4-8 15 Fig. 6.2.1-18 15 Fig. 6.3-2G Fig. 5.4-9 11 Fig. 6.2.1-18A 14 (Sh 1 of 2) 11 Fig. 5.4-10 11 Fig. 6.2.1-19 11 (Sh 2 of 2) 11 Fig. 5.4-11 11 Fig. 6.2.1-21A 20 Fig. 6.3-2H Fig. 5.4-12 11 Fig. 6.2.1-21B 20 (Sh 1 of 2) 11 Fig. 5.4-13 11 Fig. 6.2.1-22A 20 (Sh 2 of 2) 11 Fig. 5.4-14 11 Fig. 6.2.1-22B 20 Fig. 6.3-2I Fig. 5.4-15 11 Fig. 6.2.1-23A 20 (Sh 1 of 2) 11 Fig. 6.2.1-23B 20 (Sh 2 of 2) 11 5A Tab -- Fig. 6.2.1-24A 20 Fig. 6.3-2J None Fig. 6.2.1-24B 20 (Sh 1 of 2) 11 Fig. 6.2.1-25 11 (Sh 2 of 2) 11 5B Tab -- Fig. 6.3.2-2 11 6.2.2 Tab -- Fig. 6.3.2-3 11 Fig. 5B-1 11 None Fig. 6.3.3a.2-1A 20 Fig. 5B-2 11 Fig. 6.3.3b.2-1A 20 Fig. 5B-3 11 6.2.3 Tab -- Fig. 6.3.3a.2-1B 20 Fig. 5B-4 11 None Fig. 6.3.3b.2-1B 20 Fig. 6.3.3a.2-1C 20 5D Tab 6.2.4 Tab -- Fig. 6.3.3b.2-1C 20 Fig. 6.3.3a.2-1D 20 Fig. 5D-1A 15 Fig. 6.2.4-1 Fig. 6.3.3b.2-1D 20 Fig. 5D-1B 15 (Sh 1 of 10) 20 Fig. 6.3.3a.2-1E 20 Fig. 5D-2 13 (Sh 2 of 10) 18 Fig. 6.3.3b.2-1E 20 Fig. 5D-3 13 (Sh 3 of 10) 20 Fig. 6.3.3a.2-1F 20 Fig. 5D-4A 13 (Sh 4 of 10) 18 Fig. 6.3.3b.2-1F 20 Fig. 5D-4B 13 (Sh 5 of 10) 18 Fig. 6.3.3a.2-1G 20 (Sh 5A of 10) 18 Fig. 6.3.3b.2-1G 20 5E Tab (Sh 6 of 10) 18 Fig. 6.3.3a.2-1H 20 (Sh 6A of 10) 18 Fig. 6.3.3b.2-1H 20 Fig. 5E-1A 15 (Sh 7 of 10) 18 Fig. 6.3.3a.2-2A 20 Fig 5E-1B 15 (Sh 8 of 10) 20 Fig. 6.3.3b.2-2A 20 Fig. 5E-2 13 (Sh 9 of 10) 18 Fig. 6.3.3a.2-2B 20 Fig. 5E-3 13 (Sh 9A of 10) 18 Fig. 6.3.3b.2-2B 20 Fig. 5E-4 13 (Sh 10 of 10) 18 Fig. 6.3.3a.2-2C 20 Fig. 6.3.3b.2-2C 20 6.2.5 Tab -- Fig. 6.3.3a.2-2D 20 CHAPTER 6 TAB -- Fig. 6.3.3b.2-2D 20 Fig. 6.2.5-1 15 Fig. 6.3.3a.2-2E 20 6.1 Tab -- Fig. 6.2.5-2 15 Fig. 6.3.3b.2-2E 20 None Fig. 6.3.3a.2-2F 20 6.2.6 Tab -- Fig. 6.3.3b.2-2F 20 6.2.1 Tab -- None Fig. 6.3.3a.2-2G 20 Fig. 6.3.3b.2-2G 20 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 6.3.3a.2-2H 20 Fig. 6.3.3a.3-1G 20 Fig. 6.3.3b.3-5G 20 Fig. 6.3.3b.2-2H 20 Fig. 6.3.3b.3-1G 20 Fig. 6.3.3a.3-5H 20 Fig. 6.3.3b.2-2I 20 Fig. 6.3.3a.3-1H 20 Fig. 6.3.3b.3-5H 20 Fig. 6.3.3b.2-2J 20 Fig. 6.3.3b.3-1H 20 Fig. 6.3.3a.3-6A 20 Fig. 6.3.3b.2-2K 20 Fig. 6.3.3a.3-2A 20 Fig. 6.3.3b.3-6A 20 Fig. 6.3.3b.2-2L 20 Fig. 6.3.3b.3-2A 20 Fig. 6.3.3a.3-6B 20 Fig. 6.3.3b.2-2M 20 Fig. 6.3.3a.3-2B 20 Fig. 6.3.3b.3-6B 20 Fig. 6.3.3b.2-2N 20 Fig. 6.3.3b.3-2B 20 Fig. 6.3.3a.3-6C 20 Fig. 6.3.3b.2-2O 20 Fig. 6.3.3a.3-2C 20 Fig. 6.3.3b.3-6C 20 Fig. 6.3.3b.2-2P 20 Fig. 6.3.3b.3-2C 20 Fig. 6.3.3a.3-6D 20 Fig. 6.3.3b.2-2Q 20 Fig. 6.3.3a.3-2D 20 Fig. 6.3.3b.3-6D 20 Fig. 6.3.3b.2-2R 20 Fig. 6.3.3b.3-2D 20 Fig. 6.3.3a.3-6E 20 Fig. 6.3.3b.2-2S 20 Fig. 6.3.3a.3-2E 20 Fig. 6.3.3b.3-6E 20 Fig. 6.3.3b.2-2T 20 Fig. 6.3.3b.3-2E 20 Fig. 6.3.3a.3-6F 20 Fig. 6.3.3b.2-2U 20 Fig. 6.3.3a.3-2F 20 Fig. 6.3.3b.3-6F 20 Fig. 6.3.3a.2-3A 20 Fig. 6.3.3b.3-2F 20 Fig. 6.3.3a.3-6G 20 Fig. 6.3.3b.2-3A 20 Fig. 6.3.3a.3-2G 20 Fig. 6.3.3b.3-6G 20 Fig. 6.3.3a.2-3B 20 Fig. 6.3.3b.3-2G 20 Fig. 6.3.3a.3-6H 20 Fig. 6.3.3b.2-3B 20 Fig. 6.3.3a.3-2H 20 Fig. 6.3.3b.3-6H 20 Fig. 6.3.3a.2-3C 20 Fig. 6.3.3b.3-2H 20 Fig. 6.3.3a.3-7A 20 Fig. 6.3.3b.2-3C 20 Fig. 6.3.3a.3-3A 20 Fig. 6.3.3b.3-7A 20 Fig. 6.3.3a.2-3D 20 Fig. 6.3.3b.3-3A 20 Fig. 6.3.3a.3-7B 20 Fig. 6.3.3b.2-3D 20 Fig. 6.3.3a.3-3B 20 Fig. 6.3.3b.3-7B 20 Fig. 6.3.3a.2-3E 20 Fig. 6.3.3b.3-3B 20 Fig. 6.3.3a.3-7C 20 Fig. 6.3.3b.2-3E 20 Fig. 6.3.3a.3-3C 20 Fig. 6.3.3b.3-7C 20 Fig. 6.3.3a.2-3F 20 Fig. 6.3.3b.3-3C 20 Fig. 6.3.3a.3-7D 20 Fig. 6.3.3b.2-3F 20 Fig. 6.3.3a.3-3D 20 Fig. 6.3.3b.3-7D 20 Fig. 6.3.3a.2-3G 20 Fig. 6.3.3b.3-3D 20 Fig. 6.3.3a.3-7E 20 Fig. 6.3.3b.2-3G 20 Fig. 6.3.3a.3-3E 20 Fig. 6.3.3b.3-7E 20 Fig. 6.3.3a.2-3H 20 Fig. 6.3.3b.3-3E 20 Fig. 6.3.3a.3-7F 20 Fig. 6.3.3b.2-3H 20 Fig. 6.3.3a.3-3F 20 Fig. 6.3.3b.3-7F 20 Fig. 6.3.3a.2-3I 20 Fig. 6.3.3b.3-3F 20 Fig. 6.3.3a.3-7G 20 Fig. 6.3.3a.2-3J 20 Fig. 6.3.3a.3-3G 20 Fig. 6.3.3b.3-7G 20 Fig. 6.3.3a.2-3K 20 Fig. 6.3.3b.3-3G 20 Fig. 6.3.3a.3-7H 20 Fig. 6.3.3a.2-3L 20 Fig. 6.3.3a.3-3H 20 Fig. 6.3.3b.3-7H 20 Fig. 6.3.3a.2-3M 20 Fig. 6.3.3b.3-3H 20 Fig. 6.3.3a.3-8 20 Fig. 6.3.3a.2-3N 20 Fig. 6.3.3a.3-4A 20 Fig. 6.3.3b.3-8 20 Fig. 6.3.3a.2-3O 20 Fig. 6.3.3b.3-4A 20 Fig. 6.3.3a.4-1 20 Fig. 6.3.3b.2-3O 20 Fig. 6.3.3a.3-4B 20 Fig. 6.3.3b.4-1 20 Fig. 6.3.3a.2-3P 20 Fig. 6.3.3b.3-4B 20 Fig. 6.3.3a.4-2 20 Fig. 6.3.3a.2-3Q 20 Fig. 6.3.3a.3-4C 20 Fig. 6.3.3a.4-3 20 Fig. 6.3.3a.2-3R 20 Fig. 6.3.3b.3-4C 20 Fig. 6.3.3b.4-3 20 Fig. 6.3.3a.2-3S 20 Fig. 6.3.3a.3-4D 20 Fig. 6.3.3a.4-4 20 Fig. 6.3.3a.2-3T 20 Fig. 6.3.3b.3-4D 20 Fig. 6.3.3b.4-4 20 Fig. 6.3.3a.2-3U 20 Fig. 6.3.3a.3-4E 20 Fig. 6.3.3a.4-5 20 Fig. 6.3.3a.2-4A 20 Fig. 6.3.3b.3-4E 20 Fig. 6.3.3b.4-5 20 Fig. 6.3.3a.2-4B 20 Fig. 6.3.3a.3-4F 20 Fig. 6.3.3a.4-6 20 Fig. 6.3.3a.2-4C 20 Fig. 6.3.3b.3-4F 20 Fig. 6.3.3b.4-6 20 Fig. 6.3.3a.2-4D 20 Fig. 6.3.3a.3-4G 20 Fig. 6.3.3a.5-1 Fig. 6.3.3a.2-4E 20 Fig. 6.3.3b.3-4G 20 (Sh 1 of 6) 20 Fig. 6.3.3a.2-4F 20 Fig. 6.3.3a.3-4H 20 (Sh 2 of 6) 20 Fig. 6.3.3a.2-4G 20 Fig. 6.3.3b.3-4H 20 (Sh 3 of 6) 20 Fig. 6.3.3a.2-4H 20 Fig. 6.3.3a.3-5A 20 (Sh 4 of 6) 20 Fig. 6.3.3a.3-1A 20 Fig. 6.3.3b.3-5A 20 (Sh 5 of 6) 20 Fig. 6.3.3b.3-1A 20 Fig. 6.3.3a.3-5B 20 (Sh 6 of 6) 20 Fig. 6.3.3a.3-1B 20 Fig. 6.3.3b.3-5B 20 Fig. 6.3.3b.5-1 Fig. 6.3.3b.3-1B 20 Fig. 6.3.3a.3-5C 20 (Sh 1 of 6) 20 Fig. 6.3.3a.3-1C 20 Fig. 6.3.3b.3-5C 20 (Sh 2 of 6) 20 Fig. 6.3.3b.3-1C 20 Fig. 6.3.3a.3-5D 20 (Sh 3 of 6) 20 Fig. 6.3.3a.3-1D 20 Fig. 6.3.3b.3-5D 20 (Sh 4 of 6) 20 Fig. 6.3.3b.3-1D 20 Fig. 6.3.3a.3-5E 20 (Sh 5 of 6) 20 Fig. 6.3.3a.3-1E 20 Fig. 6.3.3b.3-5E 20 (Sh 6 of 6) 20 Fig. 6.3.3b.3-1E 20 Fig. 6.3.3a.3-5F 20 Fig. 6.3.3a.3-1F 20 Fig. 6.3.3b.3-5F 20 Fig. 6.3.3b.3-1F 20 Fig. 6.3.3a.3-5G 20 6.4 Tab --
June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 7.3-8A 15 Fig. 6.4-1 11 Fig. 7.3-8B 15 Fig. 8.2-1 19 Fig. 7.3-9A 11 Fig. 8.2-2 19 6.5 Tab -- Fig. 7.3-9B 11 Fig. 7.3-9C 11 8.3 Tab --
Fig. 6.5-1 12 Fig. 7.3-10 12 Fig. 6.5-2 12 Fig. 7.3-11A 12 Fig. 8.3-1 Fig. 6.5-3 12 Fig. 7.3-11B 12 (Sh 1 of 2) 19 Fig. 6.5-4 18 Fig. 7.3-11C 12 (Sh 2 of 2) 19 Fig. 6.5-5 12 Fig. 8.3-2 19 Fig. 6.5-6 12 7.4 Tab -- Fig. 8.3-3 20 Fig. 7.4-1 11 6.6 Tab -- Fig. 7.4-2 11 8A Tab --
None Fig. 7.4-3 11 None Fig. 7.4-4 6A Tab -- (Sh 1 of 3) 11 8B Tab --
(Sh 2 of 3) 11 None Fig. 6A-1 11 (Sh 3 of 3) 11 Fig. 6A-2 11 Fig. 7.4-5 11 CHAPTER 9 TAB --
Fig. 6A-3 11 Fig. 7.4-6 11 Fig. 6A-4 11 9.1 Tab --
Fig. 6A-5 15 7.5 Tab --
Fig. 9.1-1 11 CHAPTER 7 TAB -- Fig. 7.5-1 Fig. 9.1-2 11 (Sh 1 of 2) 11 Fig. 9.1-3 11 7.1 Tab -- (Sh 2 of 2) 11 Fig. 9.1-4 11 Fig. 7.5-2 Fig. 9.1-8 20 Fig. 7.1-1 11 (Sh 1 of 2) 11 Fig. 9.1-11 12 (Sh 2 of 2) 11 7.2 Tab -- 9.2 Tab --
Fig. 7.2-0 11 Fig. 9.2-1 Fig. 7.2-0A 11 7.6 Tab -- (Sh 1 of 2) 12 Fig. 7.2-0B 11 (Sh 2 of 2) 12 Fig. 7.2-0C 11 Fig. 7.6-1 17 Fig. 7.2-OD 19 Fig. 7.6-2 12 9.3 Tab --
Fig, 7.2-OD A 14 Fig. 7.2-0E 11 7.7 Tab -- Fig. 9.3-1 12 Fig. 7.2-0F 11 Fig. 7.2-0G 11 Fig. 7.7-1 11 9.4 Tab --
Fig. 7.2-1 11 Fig. 7.7-2 11 Fig. 7.2-2 11 Fig. 7.7-3 11 Fig. 9.4-1 12 Fig. 7.2-3 11 Fig. 7.7-4 11 Fig. 7.2-5 20 Fig. 7.7-5 12 9.5 Tab --
Fig. 7.2-7 20 Fig. 7.7-6 12 Fig. 7.2-9 20 Fig. 7.7-7 12 Fig. 9.5-1 17 Fig. 7.2-12 11 Fig. 7.7-8 12 Fig. 9.5-2 17 Fig. 7.2-13 18 Fig. 7.7-9 12 Fig. 9.5-3 17 Fig. 7.2-14 12 Fig. 7.7-11 12 Fig. 9.5-4 17 Fig. 9.5-5 12 7.3 Tab -- 7A Tab --
None 9A Tab --
Fig. 7.3-1 11 None Fig. 7.3-2 11 CHAPTER 8 TAB --
Fig. 7.3-3 11 9B Tab --
Fig. 7.3-4 11 8.1 Tab --
Fig. 7.3-5 11 Fig. 9B-1 11 Fig. 7.3-6 11 Fig. 8.1-1 Fig. 9B-2 11 Fig. 7.3-7A 11 (Sh 1 of 2) 18 Fig. 9B-3 11 Fig. 7.3-7B 11 (Sh 2 of 2) 18 Fig. 9B-4 11 Fig. 7.3-7C 11 Fig. 9B-5 12 Fig. 7.3-7D 11 Fig. 9B-6 12 Fig. 7.3-7E 11 Fig. 9B-7 12 Fig. 7.3-7F 11 8.2 Tab --
June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision 12.2 Tab -- None CHAPTER 10 TAB -- Fig. 12.2-1 CHAPTER 15 TAB --
(Sh 1 of 2) 11 10.1 Tab -- (Sh 2 of 2) 11 15.0 Tab --
Fig. 12.2-2 11 Fig. 10.1-1 Fig. 12.2-3 11 Fig. 15.0-1 (Sh 1 of 2) 11 (Sh 1 of 3) 11 (Sh 2 of 2) 11 12.3 Tab -- (Sh 2 of 3) 11 Fig. 10.1-2 17 (Sh 3 of 3) 11 Fig. 10.1-3 17 Fig. 12.3-1 16 Fig. 15.0-2 11 Fig. 12.3-2 12 10.2 Tab -- Fig. 12.3-3 12 15.1 Tab --
Fig. 12.3-4 16 Fig. 10.2-1 12 Fig. 15.1.3-1 16 Fig. 10.2-2 12 12.4 Tab -- Fig. 15.1.3-2 16 Fig. 10.2-3 12 None Fig. 15.1.3-3 16 Fig. 15.1.3-4 16 10.3 Tab -- 12.5 Tab -- Fig. 15.1.3-5 16 None None Fig. 15.1.3-6 19 Fig. 15.1.3-7 16 10.4 Tab -- 12A Tab -- Fig. 15.1.3-8 16 None Fig. 15.1.3-9 16 Fig. 10.4-1 12 Fig. 15.1.3-10 16 12B Tab -- Fig. 15.1.3-11A 20 10A Tab -- None Fig. 15.1.3-11B 20 None Fig. 15.1.3-12 16 CHAPTER 13 TAB -- Fig. 15.1.3-13A 20 10B Tab Fig. 15.1.3-13B 20 None 13.1 Tab -- Fig. 15.1.3-14 16 None Fig. 15.1.3-15 16 CHAPTER 11 TAB --
13.2 Tab -- Fig. 15.1.4-1 16 11.1 Tab -- None Fig. 15.1.4-2 16 Fig. 15.1.4-3 16 Fig. 11.1-1 11 13.3 Tab -- Fig. 15.1.4-4 16 Fig. 11.1-2 11 None Fig. 15.1.4-5 16 Fig. 15.1.4-6 16 11.2 Tab -- Fig. 15.1.4-7 16 None 13.4 Tab -- Fig. 15.1.4-8 16 None Fig. 15.1.4-9 16 11.3 Tab -- Fig. 15.1.4-10 19 None 13.5 Tab -- Fig. 15.1.4-11 19 None Fig. 15.1.4-12 19 11.4 Tab -- Fig. 15.1.4-13 19 None 13.6 Tab -- Fig. 15.1.4-14 19 None 11.5 Tab -- Fig. 15.1.5-1 15 13A Tab -- Fig. 15.1.5-2 15 Fig. 11.5-1 12 None Fig. 15.1.5-3 15 Fig. 11.5-2 12 Fig. 15.1.5-4 15 Fig. 11.5-3 12 CHAPTER 14 TAB -- Fig. 15.1.5-5 15 Fig. 11.5-4 12 Fig. 15.1.5-6 15 Fig. 11.5-5 12 14.1 Tab -- Fig. 15.1.5-7 15 Fig. 11.5-6 12 None Fig. 15.1.5-8 15 Fig. 15.1.5-9 15 11A Tab -- 14.2 Tab -- Fig. 15.1.5-10 15 None Fig. 15.1.5-11 15 Fig. 14.2-1 11 Fig. 15.1.5-12 15 CHAPTER 12 TAB -- Fig. 15.1.5-13 15A 14A Tab -- Fig. 15.1.5-14 15 12.1 Tab -- None Fig. 15.1.5-15 15 None 14B Tab -- Fig. 15.1.6-1 15 Fig. 15.1.6-2 15 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 15.1.6-3 15 Fig. 15.2.8-25 18 Fig. 15.4.1-3 15 Fig. 15.1.6-4 15 Fig. 15.2.8-26 18 Fig. 15.4.1-4 15 Fig. 15.1.6-5 15 Fig. 15.2.8-27 18 Fig. 15.4.1-5 15 Fig. 15.1.6-6 15 Fig. 15.2.8-28 18 Fig. 15.4.1-6 15 Fig. 15.1.6-7 15 Fig. 15.2.8-29 18 Fig. 15.4.1-7A 20 Fig. 15.1.6-8 15 Fig. 15.2.8-30 18 Fig. 15.4.1-7B 20 Fig. 15.1.6-9 15 Fig. 15.2.8-31 18 Fig. 15.4.1-8 15 Fig. 15.1.6-10 15 Fig. 15.2.8-32 18 Fig. 15.4.1-9 15 Fig. 15.1.6-11 15 Fig. 15.2.8-33 18 Fig. 15.4.1-10 15 Fig. 15.1.6-12 15 Fig. 15.2.8-34 18 Fig. 15.4.1-11 15 Fig. 15.2.8-35 18 Fig. 15.4.1-12 15 15.2 Tab -- Fig. 15.2.8-36a 18 Fig. 15.4.1-13 15 Fig. 15.2.8-36b 18 Fig. 15.4.1-14 15 Fig. 15.2.3-1 16 Fig. 15.2.8-37 18 Fig. 15.4.1-15A 20 Fig. 15.2.3-2 16 Fig. 15.2.8-38 18 Fig. 15.4.1-15B 20 Fig. 15.2.3-3 16 Fig. 15.2.8-39 18 Fig. 15.4.1-16 15 Fig. 15.2.3-4 16 Fig. 15.2.8-40 18 Fig. 15.4.2-1 13 Fig. 15.2.3-5 16 Fig. 15.2.8-41 18 Fig. 15.4.2-2 18 Fig. 15.2.3-6 16 Fig. 15.2.8-42 17 Fig. 15.4.2-3 13 Fig. 15.2.3-7 16 Fig. 15.2.8-43 17 Fig. 15.4.2-4A 20 Fig. 15.2.3-8 16 Fig. 15.2.8-44 17 Fig. 15.4.2-4B 20 Fig. 15.2.3-9 16 Fig. 15.2.8-45 17 Fig. 15.4.2-5 13 Fig. 15.2.3-10 16 Fig. 15.2.8-46 17 Fig. 15.4.2-6 13 Fig. 15.2.3-11 16 Fig. 15.2.8-47 17 Fig. 15.4.2-7 13 Fig. 15.2.3-12 16 Fig. 15.2.8-48 17 Fig. 15.4.2-8 13 Fig. 15.2.3-13 16 Fig. 15.2.8-49 17 Fig. 15.4.2-9 13 Fig. 15.2.3-14A 20 Fig. 15.2.8-50 17 Fig. 15.4.2-10 13 Fig. 15.2.3-14B 20 Fig. 15.2.8-51 17 Fig. 15.4.2-11 13 Fig. 15.2.3-15 16 Fig. 15.4.8-1 20 Fig. 15.2.3-16 16 15.3 Tab -- Fig. 15.4.8-2 20 Fig. 15.2.3-17 16 Fig. 15.4.8-3 20 Fig. 15.2.3-18 16 Fig. 15.3.1-1 17 Fig. 15.4.8-4 20 Fig. 15.2.3-19 16 Fig. 15.3.1-2 17 Fig. 15.4.8-5 20 Fig. 15.2.3-20 16 Fig. 15.3.1-3 17 Fig. 15.4.8-6 13 Fig. 15.2.3-21 16 Fig. 15.3.1-4 17 Fig. 15.4.8-7 13 Fig. 15.2.3-22 16 Fig. 15.3.1-5 17 Fig. 15.4.8-8 13 Fig. 15.2.3-23 16 Fig. 15.3.1-6 17 Fig. 15.4.8-9 13 Fig. 15.2.3-24 16 Fig. 15.3.1-7 17 Fig. 15.4.8-10 13 Fig. 15.2.3-25 16 Fig. 15.3.1-8 17 Fig. 15.4.8-11 13 Fig. 15.2.3-26 16 Fig. 15.3.1-9 17 Fig. 15.4.8-12 13 Fig. 15.2.3-27 16 Fig. 15.3.1-10 17 Fig. 15.2.3-28 16 Fig. 15.3.1-11 17 15.5 Tab --
Fig. 15.2.8-1 13 Fig. 15.3.1-12 17 Fig. 15.2.8-2 13 Fig. 15.3.1-13 17 Fig. 15.5.2-2 15 Fig. 15.2.8-3 13 Fig. 15.3.1-14A 20 Fig. 15.5.2-3 18 Fig. 15.2.8-4 13 Fig. 15.3.1-14B 20 Fig. 15.5.2-4 15 Fig. 15.2.8-5 13 Fig. 15.3.1-15 17 Fig. 15.5.2-4A 18 Fig. 15.2.8-6 13 Fig. 15.3.4-1 15 Fig. 15.5.2-5 15 Fig. 15.2.8-7 13 Fig. 15.3.4-2 15 Fig. 15.5.2-6 15 Fig. 15.2.8-9 13 Fig. 15.3.4-3 15 Fig. 15.5.2-7 15 Fig. 15.2.8-10 13 Fig. 15.3.4-4 15 Fig. 15.5.2-8 15 Fig. 15.2.8-11 13 Fig. 15.3.4-5 15 Fig. 15.5.2-9 15 Fig. 15.2.8-12 13 Fig. 15.3.4-6 15 Fig. 15.5.2-10 15 Fig. 15.2.8-13 13 Fig. 15.3.4-7 15 Fig. 15.5.2-11 15 Fig. 15.2.8-14 13 Fig. 15.3.4-8 15 Fig. 15.2.8-15 13 Fig. 15.3.4-9 15 15.6 Tab --
Fig. 15.2.8-16 18 Fig. 15.3.4-10 15 Fig. 15.2.8-17 18 Fig. 15.3.4-11 15 Fig. 15.6.2-1 17 Fig. 15.2.8-18 18 Fig. 15.3.4-12A 20 Fig. 15.6.2-2 17 Fig. 15.2.8-19 18 Fig. 15.3.4-12B 20 Fig. 15.6.2-3 17 Fig. 15.2.8-20 18 Fig. 15.6.2-4 17 Fig. 15.2.8-21 18 15.4 Tab -- Fig. 15.6.2-5 17 Fig. 15.2.8-22 18 Fig. 15.6.2-6 17 Fig. 15.2.8-23 18 Fig. 15.4.1-1 15 Fig. 15.6.2-7 17 Fig. 15.2.8-24 18 Fig. 15.4.1-2 15 Fig. 15.6.2-8 17 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 15.6.2-9 17 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 15.6.2-10 17 Fig. 15.6.3-21 Fig. 15A-10 Fig. 15.6.2-11 17 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.2-12 17 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 15.6.2-13 17 Fig. 15.6.3-22 Fig. 15A-11 Fig. 15.6.2-14 17 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.2-15 17 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 15.6.2-16A 20 Fig. 15.6.3-23 Fig. 15A-12 Fig. 15.6.2-16B 20 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.3-1 (Sh 2 of 2) 13 (Sh 2 of 2) 11 (Sh 1 of 2) 16 Fig. 15.6.3-24 Fig. 15A-13 (Sh 2 of 2) 16 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.3-2 (Sh 2 of 2) 13 (Sh 2 of 2) 11 (Sh 1 of 2) 16 Fig. 15.6.3-25 Fig. 15A-14 (Sh 2 of 2) 16 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.3-3 (Sh 2 of 2) 13 (Sh 2 of 2) 11 (Sh 1 of 2) 16 Fig. 15.6.3-26 Fig. 15A-15 (Sh 2 of 2) 16 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 15.6.3-4 19 (Sh 2 of 2) 13 (Sh 2 of 2) 11 (Sh 1 of 2) 16 Fig. 15.6.3-27 (Sh 2 of 2) 19 (Sh 1 of 2) 13 15B Tab --
Fig. 15.6.3.5 (Sh 2 of 2) 13 (Sh 1 of 2) 16 Fig. 15.6.3-28 Fig. 15B-1 11 (Sh 2 of 2) 16 (Sh 1 of 2) 13 Fig. 15B-2 11 Fig. 15.6.3-6 (Sh 2 of 2) 13 Fig. 15B-3 11 (Sh 1 of 2) 16 Fig. 15.6.3-29 (Sh 2 of 2) 16 (Sh 1 of 2) 13 15C Tab --
Fig. 15.6.3-7 (Sh 2 of 2) 13 None (Sh 1 of 2) 16 Fig. 15.6.3-30 (Sh 2 of 2) 16 (Sh 1 of 2) 13 15D Tab --
Fig. 15.6.3-8 (Sh 2 of 2) 13 (Sh 1 of 2) 16 Fig. 15D-1 11 (Sh 2 of 2) 16 15.7 Tab --
Fig. 15.6.3-9 15E Tab --
(Sh 1 of 2) 16 Fig. 15.7.1-1 11 (Sh 2 of 2) 16 Fig. 15.7.3-1 11 15E-1A 20 Fig. 15.6.3-10 Fig. 15.7.4-1 11 15E-1B 20 (Sh 1 of 2) 16 Fig. 15.7.4-2 14 (Sh 2 of 2) 16 CHAPTER 16 TAB --
Fig. 15.6.3-11 15A Tab --
(Sh 1 of 2) 16 16.0 Tab --
(Sh 2 of 2) 16 Fig. 15A-1 11 None Fig. 15.6.3-12 Fig. 15A-2 (Sh 1 of 2) 16 (Sh 1 of 2) 11 (Sh 2 of 2) 16 (Sh 2 of 2) 11 Fig. 15.6.3-13 Fig. 15A-3 CHAPTER 17 TAB --
(Sh 1 of 2) 16 (Sh 1 of 2) 11 (Sh 2 of 2) 16 (Sh 2 of 2) 11 17.1 Tab --
Fig. 15.6.3-14 Fig. 15A-4 None (Sh 1 of 2) 16 (Sh 1 of 2) 11 (Sh 2 of 2) 16 (Sh 2 of 2) 11 17.1A Tab --
Fig. 15.6.3-15 16 Fig. 15A-5 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 17.1A-1 11 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 15.6.3-17 Fig. 15A-6 17.1B Tab --
(Sh 1 of 2) 13 (Sh 1 of 2) 11 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 17.1B-1 11 Fig. 15.6.3-18 Fig. 15A-7 Fig. 17.1B-2 11 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 17.1B-3 11 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 17.1B-4 11 Fig. 15.6.3-19 Fig. 15A-8 Fig. 17.1B-5 11 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 17.1B-6 11 (Sh 2 of 2) 13 (Sh 2 of 2) 11 Fig. 17.1B-7 11 Fig. 15.6.3-20 Fig. 15A-9 Fig. 17.1B-8 11 (Sh 1 of 2) 13 (Sh 1 of 2) 11 Fig. 17.1B-9 11 June 2019 Revision 20
PVNGS UPDATED FSAR LIST OF EFFECTIVE FIGURE PAGES R20 Page or Figure No. Revision Page or Figure No. Revision Page or Figure No. Revision Fig. 17.1B-10 11 17.1C Tab -- 18.II.G Tab --
None None 17.2 Tab -- 18.II.K Tab --
None None 17.2A Tab -- 18.III.A Tab --
None None 17.2B Tab -- 18.III.D Tab --
None None 17.2C Tab -- 18A Tab --
None None 17.2D Tab -- 18B Tab --
None Fig. 18B-1 15 17.2E Tab -- Fig. 18B-2 11 None Fig. 18B-3 11 Fig. 18B-4 11 17.2F Tab -- Fig. 18B-5 11 None Fig. 18B-6 11 Fig. 18B-7 11 17.2G Tab --
None 17A Tab --
None 17B Tab --
None CHAPTER 18 TAB --
18.I.A Tab --
None 18.I.B Tab --
None 18.I.C Tab --
None 18.I.D Tab --
None 18.I.G Tab --
None 18.II.B Tab --
Fig. 18.II.B-1 16 18.II.D Tab --
None 18.II.E Tab --
None 18.II.F Tab --
None June 2019 Revision 20
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR GENERAL VICINITY MAP FIGURE 1.2-2 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PVNGS, REGIONAL PLANT LOCATION FIGURE 2.1-1 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SITE AND EXCLUSION BOUNDARIES FIGURE 2.1-4 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LOW POPULATION ZONE FIGURE 2.1-15 JUNE 2009 REVISION 15
Hassayampa Cotton Gin Redhawk Mesquite Arlington Valley LEGEND Industrial Facility Hassayampa Cotton Gin Redhawk Arlington Valley Harquahala Generating Mesquite Harquahala Generating Airports Pipelines PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR INDUSTRIAL AND TRANSPORTATION FACILITIES IN THE ENVIRONS OF THE PALO VERDE SITE FIGURE 2.2-1 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR AMMONIA CONCENTRATION AT PVNGS FOR TANK CAR RUPTURE AIR INTAKE CONCENTRATION FIGURE 2.2-3a JUNE 2011 REVISION 16
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR AMMONIA CONCENTRATION AT PVNGS FOR TANK CAR RUPTURE MAIN CONTROL ROOM CONCENTRATION FIGURE 2.2-3b JUNE 2011 REVISION 16
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HELICOPTER PAD AND PREFERRED APPROACH FIGURE 2.2-4 JUNE 2015 REVISION 18
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOPOGRAPHIC MAP WITHIN A 5-MILE RADIUS OF THE PVNGS SITE FIGURE 2.3-15 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLANT SITE AND HYDROSPHERE LOCATIONS OF CROSS SECTIONS FIGURE 2.4-1 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SITE DRAINAGE PLAN FIGURE 2.4-2 JUNE 2011 REVISION 16
This Figure has been redacted.
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SITE DRAINAGE PLAN POWER BLOCK AREA FIGURE 2.4-4 JUNE 2009 REVISION 15
FIGURE 2.4-22 DELETED
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 85-ACRE RESERVOIR AREA CAPACITY CURVE FIGURE 2.4-22a JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 45-ACRE RESERVOIR AREA CAPACITY CURVE FIGURE 2.4-22b JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 45-ACRE & 85-ACRE RESERVOIR AREA CAPACITY CURVE FIGURE 2.4-22c JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 45-ACRE & 85-ACRE RESERVOIR DESIGN DETAILS FIGURE 2.4-23 JUNE 2009 REVISION 15
FIGURE 2.4-24 DELETED
El. 942.00 (Typ.)
12 to 32 POOL LEVEL (VARIES)
Max El. 937 4
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR EVAPORATION POND DESIGN DETAILS FIGURE 2.4-25 JUNE 2017 REVISION 19
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR EVAPORATION POND DESIGN DETAILS FIGURE 2.4-25a JUNE 2011 REVISION 16
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MAP OF THE SITE REGION FIGURE 2.4-26 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR STRUCTURE CONTOUR MAP TOP OF MIDDLE FINE GRAINED UNIT (AQUITARD)
FIGURE 2.4-28 JUNE 2011 REVISION 16
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR WATER LEVEL CONTOUR MAP OF THE REGIONAL AQUIFER FIGURE 2.4-29 JUNE 2009 REVISION 15
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR WATER LEVEL CONTOUR MAP OF THE PERCHED WATER ZONE FIGURE 2.4-30 JUNE 2009 REVISION 15
NOTE: ALL ON-SITE WELLS EXCEPT 34abb, 27ddc, 27cbc AND 26baa WERE PALO VERDE NUCLEAR GENERATING STATION ABANDONED IN 1977 AND SEALED OFF UPDATED FSAR BY FILLING WITH CEMENT GROUT.
LOCATION MAP OF WELLS IN THE SITE AREA EXPLANATION FIGURE 2.4-33 IRRIGATION STOCK, DOMESTIC JUNE 2009 REVISION 15 Ø UNUSED DESTROYED
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR AQUITARD THICKNESS COUNTOURS (ISOPACH)
FIGURE 2.4-39 JUNE 2011 REVISION 16
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PREDICTED CHANGES IN PERCHED GROUNDWATER LEVELS FIGURE 2.4-40 JUNE 2009 REVISION 15
FIGURE 2.4-41 DELETED
PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LOCATIONS OF STORAGE RESERVOIR AND EVAPORATION PONDS FIGURE 2.4-42 JUNE 2011 REVISION 16