ML18194A277
ML18194A277 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/13/2018 |
From: | Arizona Public Service Co |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML18194A277 (1) | |
Similar Documents at Palo Verde | |
---|---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023
[Table view]2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30 Category:Map MONTHYEARML18192B8862018-07-30030 July 2018
[Table view]Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18194A0502018-07-13013 July 2018 Figure 2.5-16, Geologic Map with Category I Facilities. ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A0542018-07-13013 July 2018 Figure 2.5-12, Geologic Map of Site Area. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0522018-07-13013 July 2018 Site Property ML18194A0612018-07-13013 July 2018 Figure 2.5-3, Regional Geologic Map. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. ML18193A7682018-07-12012 July 2018 Ground Magnetic Anomaly Map ML18193A7672018-07-12012 July 2018 Gravity and Magnetic Station Location Map ML18192B8832018-07-11011 July 2018 Map, Proposed Palo Verde-Devers 500KV Transmission Line, Archaeological Sensitivity. ML18192A3832018-07-11011 July 2018 Public Service Company of New Mexico 1976 Annual Report ML18192B8442018-07-11011 July 2018 Figure 2.1-6, Geologic Map of the Project 4 Study Area. ML18192B8662018-07-11011 July 2018 Proposed Palo Verde - Devers 500KV Transmission Study Area ML18192B8682018-07-11011 July 2018 Proposed Palo Verde - Devers 500KV Transmission Line, Route Approved by Arizona Siting Committee ML18192B8692018-07-11011 July 2018 Proposed Palo Verde - Devers 500KV Transmission Line, Drainage ML18192B8702018-07-11011 July 2018 Map 2-2, Proposed Palo Verde-Devers 500KV Transmission Line, Generalized Geology. ML18192B8712018-07-11011 July 2018 Map 2-3, Proposed Palo Verde-Devers 500KV Transmission Line, Selected Faults with Seismicity. ML18192B8722018-07-11011 July 2018 Map 2-4, Proposed Palo Verde - Devers 500KV Transmission Line, Land Use Areal. ML18192B8822018-07-11011 July 2018 Map, Proposed Palo Verde-Devers 500KV Transmission Line, Cultural Resource Density. ML18192B8842018-07-11011 July 2018 Map, Proposed Palo Verde-Devers 500KV Transmission Line, Summary of Anticipated Impacts Brenda. ML18192C0502018-07-11011 July 2018 Figure 3.9-7, Water Conveyance Pipeline Route 8 Reference Map for PVNGS Site. ML18192C0512018-07-11011 July 2018 Figure 10.9-5, PVNGS Water Pipelines and Plant Access Routes. ML18192C0592018-07-11011 July 2018 Figure 10.9-4, Alternative Transmission Line Routes Project 2. ML18192C0602018-07-11011 July 2018 Figure 10.2-1, Plant Makeup Water System Alternatives. ML12355A7502012-12-14014 December 2012 Evacuation Time Estimate Study; Appendix H, Page H-39 Through Appendix N ML0929504842009-10-14014 October 2009 Amendment No. 1 to License Renewal Application: Revised Environmental Report Figure 3-2 and Table 4-2 for the Hassayampa No. 3 Transmission Line ML0916005112009-06-12012 June 2009 Site Layout and Transmission Line ML0429605912004-10-0808 October 2004 Map, Common Western Oasis Map. ML18192A3761978-04-21021 April 1978 El Paso Electric Company 1977 Annual Report ML18192A1841977-01-25025 January 1977 One of the Wells Selected for Groundwater Monitoring Program, Number 177 Abb, Has Been Determined to Be Unavailable for Water Level Measuring. Substituted with Well Number 17 Abb ML18192A3841976-12-31031 December 1976 Salt River Project, Annual Report 1976 ML18192A1851976-06-21021 June 1976 Concerning Construction Phase Groundwater Monitoring Program, Corrected Figure 2 Enclosed ML18192A3301976-02-18018 February 1976 an Archaeological Survey of a Proposed 345 Kv Power Transmission Line Corridor from Deming, Nm to Greenlee County, Az ML18192A3411976-01-12012 January 1976 Figures 1 Through 12 to Opening Statement of Edwin E. Van Brunt, Jr ML18192A3891975-12-31031 December 1975 Public Service Company of New Mexico 1974 Annual Report, as Response to Request for Additional Financial Information ML18219A5481975-10-29029 October 1975 Prospectus. Arizona Public Service Co. 300,000 Shares Cumulative Preferred Stock, Series I ($100 Par Value) ML18194A0601975-09-29029 September 1975 Figure 2.5-4, Regional Tectonic Map. ML18194A0591975-09-29029 September 1975 Figure 2.5-7, Geologic Map of the Site Vicinity. ML18194A0571975-09-29029 September 1975 Figure 2.5-9, Lineaments in the Site Vicinity. ML18192B8031975-09-24024 September 1975 $35,000,000 Salt River Project Agricultural Improvement and Power District, Arizona. Salt River Project Electric System Revenue Bonds, 1975 Series C ML18192A3901975-09-24024 September 1975 Prospectus. Public Service Company of New Mexico, Common Stock 2018-07-30 |
Text
960'AP AREA 2 C-2 C-2 MAP AREA 1 C-1 960'50'-3 950'40' A. ':
.:.":,: ".', ",'-'.'-.';:,::."..',"..",.-'::;::-,A'; m f
940' Note Refer to Plan View for explanation of geologic 0Z units, contacts and
'P symbols.
~ ptrrirrnrrrr 0 930' B 930' 920'-55 m
Z Z m SCALE:
0 920
(
m 1u=10'10'10'rizoiia siurlpar Po>>er Projprl Palo Verde Nuclear Creneratinil Station l nits 1,2' Unit 3 Power Block Excavation Vertical Projection of Map Areas 1+2 Pro Numb 6O 6