MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML18194A0772018-12-13013 December 2018 Log of Boring PV-53 ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18194A0962018-08-0606 August 2018 Log of Boring PV-46 ML18194A0922018-08-0606 August 2018 Log of Boring PV-43C ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18194A0912018-08-0606 August 2018 Log of Boring PV-43B ML18194A0902018-08-0606 August 2018 Log of Boring PV-43A ML18194A0892018-08-0606 August 2018 Log of Boring PV-43 ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A1032018-07-13013 July 2018 Log of Boring PV-35. ML18194A1012018-07-13013 July 2018 Log of Boring PV-34. ML18194A1592018-07-13013 July 2018 Log of Boring PV-6 ML18194A1472018-07-13013 July 2018 Log of Boring PV-12 ML18194A1402018-07-13013 July 2018 Log of Boring PV-16 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A1452018-07-13013 July 2018 Log of Boring PV-19 ML18194A1052018-07-13013 July 2018 Log of Boring PV-36. ML18194A1382018-07-13013 July 2018 Log of Boring PV-24 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A0372018-07-13013 July 2018 Boring Projected Onto Line of Profile ML18194A1512018-07-13013 July 2018 Log of Boring PV-9 ML18194A3512018-07-13013 July 2018 Figure 2C-4, Geophysical Drill Hole Logs, GDDH-5, Gillespie Dam Alternate Siting Area ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A0712018-07-13013 July 2018 Log of Boring PV-48 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A0722018-07-13013 July 2018 Log of Boring PV-49 ML18194A1312018-07-13013 July 2018 Log of Boring PV-27. ML18194A1522018-07-13013 July 2018 Log of Boring PV-10 ML18194A1442018-07-13013 July 2018 Log of Boring PV-18 ML18194A1502018-07-13013 July 2018 Log of Boring PV-15 ML18194A1532018-07-13013 July 2018 Log of Boring PV-11 ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A1492018-07-13013 July 2018 Log of Boring PV-14 ML18194A1482018-07-13013 July 2018 Log of Boring PV-13 ML18194A1432018-07-13013 July 2018 Log of Boring PV-17 ML18194A1462018-07-13013 July 2018 Log of Boring PV-20 ML18194A3532018-07-13013 July 2018 Figure 2C-6, Geophysical Drill Hole Logs, GDDH-7, Gillespie Dam Alternate Siting Area ML18194A1362018-07-13013 July 2018 Log of Boring PV-23. ML18194A1352018-07-13013 July 2018 Log of Boring PV-22. ML18194A1332018-07-13013 July 2018 Log of Boring PV-21. ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A1292018-07-13013 July 2018 Log of Boring PV-26. ML18194A1272018-07-13013 July 2018 Log of Boring PV-31. ML18194A1252018-07-13013 July 2018 Log of Boring PV-30. ML18194A1232018-07-13013 July 2018 Log of Boring PV-29. ML18194A1212018-07-13013 July 2018 Log of Boring PV-25. ML18194A1192018-07-13013 July 2018 Log of Boring PV-28. ML18194A1172018-07-13013 July 2018 Log of Boring PV-42. 2018-08-06
[Table view] |
Text
NATURAL GAMMA LOG INCREASING RADIATION COUNTS PER SECOND
~ BASIC PROPERTIES 9 d SOIL 90 coo no /20 LITHOLOGIC DESCRIPTIONS DATA UNITS L CARBONATE CONTENT PA LEO-MAGNETIC POLARITY
'Q POSITIVE 150 I I 20
~ 0 2 2 PI 2 rc ELEV. - 3/eY 9 NEGATIVE SILTY SAND AND SILTY GRAVEL 5 VVITH CLAY/(SM-GM),light Icslcvlso ultEE LEVEL brown, loose tu msd um cfcnss, dry.
EO WITH SAND/(CL-MI)c SILTY CLAYACVD CLAYEY SILT DrOWn; sconcrcd grovel.
5ILTYDrown, WITH (SM),
SAND GRAVEL; msotum tu fcnc Scorned.
~ILTYCLAY'(CL CH) brown SANDY CLAY/(CL-CH), brown; occasional thin sctnd lensem (SM-GR),
SILTY SAND AND brown.
SANDY GRAVEL,
'ANGY CLAY-CLAYEYSAND; (CL-SC), brown.
SILTY CLAYc(CL-CH)c brown.
SILTY high plaatlcfty, Drown, CLAY/(CcV), brown rad-to very stiff fo hcrnd moist.
LTY SAIVD AND SANDY SILT/
(SM"ML), blown, very stiff tu hurd, morat, thcnly bcddcd AID/(SP-SM), brown, loorc tu mod/am dance.
5/LT Y CLAY/(CL-CH), red-brown, high plaoticityt very strtt
SILTY CLAY/(CL CH), rrd-brown.
TD-250'AMPLE LOCATION ~ DEPTH (EEET)~
SYM BOL EXPLANATION ENGINEERING PARAMETERS PALEOMAGNETIC POLARITY PI minus W/0 200 pldslicpy lndss person/ pass/Op 2DD slow persenl moisfvre ssrw doss /lets/
r s ra r o rc's rsrwiorc's I/sr/i inclination of ntncnont mapnelic veclor fn penerol apreencenl wild f(j3/ or opposition lo f 1/it/d.
e/ ths presenr mopnalic Sd dry densify ssrwlossfs "rf 8 Mopnelic vsclor Indrlerminaftw SAMPLE TYPE Drive Sample Pilchrr Tube Somple Nff Core,no. Indlcelss I Recovery nrversaf~ ID8 esr Poleomapnelic nu v
DESCRIPTIONS depth clara/ion Sfondard Pena/ra/lan Teel, iV volvo serac dress.er LRholoplc descriptions were compiled from peoloplsfs fluid Iops, CARBONATE CONTENT lobonrlory lest dale, and dawn-hole peophyslcs. Pls/d lope were prepctredin accordance <<fib ASTN. D2688-69. Clctseffications
+
Rd /traction Sli phtly Redo//vs based on loborolory test dora arein accordance <<'th ASTN D2opy-69. Goes descriptions follow procrdures ovnined In the sfoderolely Reactive GUARTERLY Or THE COLORAOO SC~OOL OP MINES; YdivmeSD, th hl R II No I Dercriptions for rofary Dorinps ore hosed vpon cvHinps fctased on romp/a rode/ion lo d ID% Hcl solution/ samples, psephysical /ops ond drplrrs'coumrnfs UNITS Ifnifs column relrrs lo prnerol slraliprophk diwbions idfniifitd mlhin
/he bdtin sedrffcctfcls.
LOG OF BORING PV-64