|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML18194A0772018-12-13013 December 2018 Log of Boring PV-53 ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18194A0962018-08-0606 August 2018 Log of Boring PV-46 ML18194A0922018-08-0606 August 2018 Log of Boring PV-43C ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18194A0912018-08-0606 August 2018 Log of Boring PV-43B ML18194A0902018-08-0606 August 2018 Log of Boring PV-43A ML18194A0892018-08-0606 August 2018 Log of Boring PV-43 ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A1032018-07-13013 July 2018 Log of Boring PV-35. ML18194A1012018-07-13013 July 2018 Log of Boring PV-34. ML18194A1592018-07-13013 July 2018 Log of Boring PV-6 ML18194A1472018-07-13013 July 2018 Log of Boring PV-12 ML18194A1402018-07-13013 July 2018 Log of Boring PV-16 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A1452018-07-13013 July 2018 Log of Boring PV-19 ML18194A1052018-07-13013 July 2018 Log of Boring PV-36. ML18194A1382018-07-13013 July 2018 Log of Boring PV-24 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A0372018-07-13013 July 2018 Boring Projected Onto Line of Profile ML18194A1512018-07-13013 July 2018 Log of Boring PV-9 ML18194A3512018-07-13013 July 2018 Figure 2C-4, Geophysical Drill Hole Logs, GDDH-5, Gillespie Dam Alternate Siting Area ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A0712018-07-13013 July 2018 Log of Boring PV-48 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A0722018-07-13013 July 2018 Log of Boring PV-49 ML18194A1312018-07-13013 July 2018 Log of Boring PV-27. ML18194A1522018-07-13013 July 2018 Log of Boring PV-10 ML18194A1442018-07-13013 July 2018 Log of Boring PV-18 ML18194A1502018-07-13013 July 2018 Log of Boring PV-15 ML18194A1532018-07-13013 July 2018 Log of Boring PV-11 ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A1492018-07-13013 July 2018 Log of Boring PV-14 ML18194A1482018-07-13013 July 2018 Log of Boring PV-13 ML18194A1432018-07-13013 July 2018 Log of Boring PV-17 ML18194A1462018-07-13013 July 2018 Log of Boring PV-20 ML18194A3532018-07-13013 July 2018 Figure 2C-6, Geophysical Drill Hole Logs, GDDH-7, Gillespie Dam Alternate Siting Area ML18194A1362018-07-13013 July 2018 Log of Boring PV-23. ML18194A1352018-07-13013 July 2018 Log of Boring PV-22. ML18194A1332018-07-13013 July 2018 Log of Boring PV-21. ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A1292018-07-13013 July 2018 Log of Boring PV-26. ML18194A1272018-07-13013 July 2018 Log of Boring PV-31. ML18194A1252018-07-13013 July 2018 Log of Boring PV-30. ML18194A1232018-07-13013 July 2018 Log of Boring PV-29. ML18194A1212018-07-13013 July 2018 Log of Boring PV-25. ML18194A1192018-07-13013 July 2018 Log of Boring PV-28. ML18194A1172018-07-13013 July 2018 Log of Boring PV-42. 2018-08-06
[Table view] |
Text
NATURAL GAMMA LOG INCREASING RADIATION COUNTS PER SECOND
~ BASIC PROPERTI ES 3 a SOIL 90 100 Bo LITHOLOGIC DESCRIPTIONS DATA UNITSY CONTENT POLARITY POSITIVE e---
120 4
60 BO 100 120 140 160 180 Pl ELEV. 970' GIFAVELLr sicyr sAHDAHD sAHD GRAVEL; fSM.GP),f/ght brown to bro n, subanpulor, lease t 20 '4', '". nmdorolvly dense, dry to moist a/rot/fled.
4'~M SARD V SILT WITH'RAVEL//ML).
brown, still, mamti angular gra ~
clavis To / diurnal r.
4
'OIC<< SILT T'AWD W/TH aRAVEL, GRAVELLY SAAID,AHDSAAIDV GIFAVEL ifSM.SP-GW)i brown, evbongulo, mediant a'ense to di ns 4 mo et, poro s, frvguant cabala is!i felt ave 140 00 ".
120
'0 51 DJ. 0eL O',"J 6 o
94<<UJ.
89 4vv 100 J
.Qv' J J.L 85 100 220 <<J' 83 FANGLOMERATEID own,hard/
100
.'4'EF veau/or, poorly sorted volcon c 95 24 vL Dos/ann s Hy su/id matm 100 mcaeimial aderateb fasted
~- J.O sandstone nori zona.
J.
v's.
97 EBO 87 98
., J..
100 14 98 k~+,,'2P 98 D
100 j..D:
92 90 34 It<< Q
'j n "~0'-:
100 8
88 100 36 j
oT-
~PJ"
~
o j'~.. J.
90 'IIL aoo . j.D, 89 L 93 '34'vjo 100 4:Q,.ZO 95 ~ .'II 94 440 LTD-460'BO 500 SAMPLE LOCATION ~ DEPTH (FEET)~
SYM BOL EXPLANATION ENGINEERING PARAMETERS PALEOMAGNETIC POLARITY Pl minus W/C 200 Plus/ cily Hder percent pussinp AEDD sieve percenl mo slure AsTA/ D AsTv aves AsTw Ass I/I'Tsi
'eke /ls'TH Inclinatior ot remnaat mopnslic vector in geneial opieement with f
/itId.
(pl or opposition lo f e) Ihii presenl magnslrc Bd dry density ecru/Dss/o.ti 8 Magnetic veclor inde/erminois v SAMPLE TYPE Drive Sample Pitcher Tube Sample HE Core, Hv. Indicales % lsecavsry Paleomopneiic IFeversal~ IF lss ID eer<<
D E 5 0 R I PT I 0 N 5 depth elevation 61 Standard Penelrivlion Ter/, 'H value AsTkr Divas-st Litholog c descriptions were compiled from geolopisls Iield lope, labonitory lest dole, and down-hole peophysics Field /ogs were HoCARBONATE CONTENT pieparedin accordonce with ASTGI 02488-69 Classifications
- 4.
Reaction siiphrly Reactive Dosed on loaoralory let/ dani are 9 accordance w th ASTAf D248T-69. Rock desciinlions fopov procedures ovsined in Ihe modern/sly Reactive
+
+
Hi phly Reoclive QUARTERLY OF THE COLORADO SCHOOL OF MINES, Volume 30, hlo I Descripnons Ior iolary Dor'nps are based upon cvHinps fbosed on sample reaction la o ID% HC/ salvation/ samples, peophys'cal lope ond drillers'commenis UNITS i/nile column refers lo penerol slrotigraphic divisions ident/ford within Ihe basin sed men/a LOG OF BORING Ptu/-2