EPID:L-2023-LRO-0051, Revision 22 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description (Approved, Closed) | |
MONTHYEARML23181A1712023-06-30030 June 2023
[Table View]Enclosure 3 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 3 to Operations Quality Assurance Program Description (QAPD) Project stage: Request ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures Project stage: Request ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures Project stage: Request ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures Project stage: Request ML23181A1592023-06-30030 June 2023 Revision 22 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description Project stage: Request ML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures Project stage: Request ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description Project stage: Request ML23220A0512023-08-0303 August 2023 NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 Project stage: Approval 2023-06-30 |
ML23181A168 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 06/30/2023 |
From: | Arizona Public Service Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML23181A159 | List: |
References | |
102-08629-CDH/MSC | |
Download: ML23181A168 (1) | |
Similar Documents at Palo Verde | |
---|---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023
[Table view]2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23181A1662023-06-30030 June 2023
[Table view]Enclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17 ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2632021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 1 Through Chapter 2.4, Figures (Redacted) ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML17234A2022017-07-31031 July 2017 Updated Final Safety Analysis Report, Revision 19, Figures, Chapters 10 Through 19 Corrected (Redacted) ML17234A2012017-07-31031 July 2017 Updated Final Safety Analysis Report, Revision 19, Figures, Chapters 4 Through 9 Corrected (Redacted) ML17234A2002017-07-31031 July 2017 Updated Final Safety Analysis Report, Revision 19, Figures, Section 2.5 Through Chapter 3 Corrected (Redacted) ML17234A1982017-07-31031 July 2017 Updated Final Safety Analysis Report, Revision 19, Figures, Chapter 1 Through Section 2.4 Corrected (Redacted) ML17234A0312017-07-13013 July 2017 Submittal of Updated Final Safety Analysis Report, Revision 19, Corrected ML17193A0502017-06-29029 June 2017 Updated Final Safety Analysis Report, Rev. 19, Figures Chapter 1 Thru Section 2.4 ML17193A0532017-06-29029 June 2017 Updated Final Safety Analysis Report, Rev. 19, Figures Chapters 10 Thru 19 ML17193A0522017-06-29029 June 2017 Updated Final Safety Analysis Report, Rev. 19, Figures Chapters 4 Thru 9 ML17193A0512017-06-29029 June 2017 Updated Final Safety Analysis Report, Rev. 19, Figures Section 2.5 Thru Chapter 3 ML17193A0202017-06-29029 June 2017 Submittal of Updated Final Safety Analysis Report, Rev. 19 and Quality Assurance Program Description ML13214A0652013-06-28028 June 2013 Transmittal of Revision 17 to Updated Final Safety Analysis Report ML13081A0972011-06-30030 June 2011 Updated Final Safety Analysis Report, Revision 16. Chapter/Section 9.3, Process Auxiliaries. ML13081A1022011-06-30030 June 2011 Updated Final Safety Analysis Report, Revision 16. Chapter 15, Accident Analyses. ML13081A0982011-06-30030 June 2011 Updated Final Safety Analysis Report, Revision 16. Chapter 10, Steam & Power Conversion System. ML13081A0962011-06-30030 June 2011 Updated Final Safety Analysis Report, Revision 16. Chapter 7, Instrumentation & Controls. ML0429602802004-03-0909 March 2004 Licensing Document Change Request, Log No. 2003F040, Palo Verde, Units 1, 2 and 3, UFSAR ML0429602782003-12-0404 December 2003 Email from James C. Hsu to Harvey Leake, Subject: PV2 UFSAR Final 112603 ML0429605492003-06-30030 June 2003 PVNGS Updated FSAR, Ldcr 02-F023, Revision 12 2023-06-30 |