ML19205A223

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted)
ML19205A223
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/2019
From: Stephenson C
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
102-07935-MLL/TNW
Download: ML19205A223 (386)


Text

Stephens Stcphmon.CarlJ(20S77B)

Ogltilir signal by ON:cn-St<<friwuon.C<<(

on, Carl D<<r30]9.06J8l4<<0:SO anrffnttgrtty ofthH documynl J(Z05778) oroff tTfAMOUU*

VALVU TO PALO VERDE NUCLEAR GENERATING STATION A;Hv4^^-ev UPDATED FSAR PROCESS FLOW DIAGRAM STEAM AND POWER CONVERSION SYSTEM FIGURE 10,1-1 SHEET 1 OF 2 JUNE 2001 REVISION 11

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HEAT BALANCE AT GUARANTEED POWER FIGURE 10.1-2 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HEAT BALANCE AT STRETCH (VWO) POWER FIGURE 10.1-3 JUNE 2013 REVISION 17

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

Feet of Covering Water (a)

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR Notes:

a. Feet above active portion of assembly VERTICAL DOSE RATE FROM ONE SPENT FUEL ELEMENT (Includes Dose From Water)

FIGURE 12.3-4 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT STEAM FLOW vs. TIME Figure 15.1.3-1 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT RCS TEMPERATURE vs. TIME Figure 15.1.3-2 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT REACTIVITIES vs. TIME Figure 15.1.3-3 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT CORE POWER vs. TIME Figure 15.1.3-4 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT CORE AVERAGE HEAT FLUX vs. TIME Figure 15.1.3-5 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT WIDE RANGE SG LEVEL vs. TIME FIGURE 15.1.3-6 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT RCS PRESSURE vs. TIME Figure 15.1.3-7 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT STEAM GENERATOR PRESSURE vs. TIME Figure 15.1.3-8 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT STEAM GENERATOR LIQUID MASS vs. TIME Figure 15.1.3-9 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT PRESSURIZER WATER VOLUME vs. TIME Figure 15.1.3-10 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT DNBR vs. TIME Figure 15.1.3-11A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT DNBR vs. TIME Figure 15.1.3-11B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT DNBR vs. TIME FIGURE 15.1.4-13A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT DNBR vs. TIME FIGURE 15.1.4-13B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT MAIN FEEDWATER FLOW vs. TIME Figure 15.1.3-12 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT LONG-TERM RCS PRESSURE vs. TIME Figure 15.1.3-13 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT LONG-TERM SG PRESSURE vs. TIME Figure 15.1.3-14 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SBCS MALFUNCTION EVENT LONG-TERM PRESSURIZER VOLUME vs. TIME Figure 15.1.3-15 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT STEAM FLOW vs. TIME Figure 15.1.4-1 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT RCS HOT LEG TEMPERATURE vs. TIME Figure 15.1.4-2 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT RCS COLD LEG TEMPERATURE vs. TIME Figure 15.1.4-3 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT RCS AVERAGE TEMPERATURE vs. TIME Figure 15.1.4-4 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT REACTIVITIES vs. TIME Figure 15.1.4-5 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT CORE POWER vs. TIME Figure 15.1.4-6 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT CORE AVERAGE HEAT FLUX vs. TIME Figure 15.1.4-7 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT WIDE RANGE SG LEVEL vs. TIME Figure 15.1.4-8 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT RCS PRESSURE vs. TIME Figure 15.1.4-9 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.1.4-10 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT STEAM GENERATOR LIQUID vs. TIME FIGURE 15.1.4-11 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.1.4-12 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT DNBR vs. TIME FIGURE 15.1.4-13 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR IOSGADVLOP EVENT MAIN FEEDWATER FLOW vs. TIME FIGURE 15.1.4-14 JUNE 2017 REVISION 19

PALO VERDE NUCELAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

STEAM FLOW vs. TIME FIGURE 15.1.5-1 JUNE 2009 REVISION 15

PALO VERDE NUCELAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

RCS TEMPERATURE vs. TIME FIGURE 15.1.5-2 JUNE 2009 REVISION 15

PALO VERDE NUCELAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

REACTIVITIES vs. TIME FIGURE 15.1.5-3 JUNE 2009 REVISION 15

PALO VERDE NUCELAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

CORE POWER vs. TIME FIGURE 15.1.5-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

CORE AVERAGE HEAT FLUX vs. TIME FIGURE 15.1.5-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

RCS PRESSURE vs. TIME FIGURE 15.1.5-6 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.1.5-7 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

STEAM GENERATOR LIQUID MASS vs. TIME FIGURE 15.1.5-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

RCS FLOW RATE vs. TIME FIGURE 15.1.5-9 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP)

PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.1.5-10 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-TRIP MSLB EVENT (SLBFPLOP CASE)

REACTOR VESSEL LIQUID LEVEL vs. TIME FIGURE 15.1.5-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

SAFETY INJECTION FLOW RATE vs. TIME FIGURE 15.1.5-12 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

MAIN FEEDWATER FLOW RATE vs. TIME FIGURE 15.1.5-13 DECEMBER 2010 REVISION 15A

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

AUXILIARY FEEDWATER FLOW RATE vs. TIME FIGURE 15.1.5-14 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST TRIP MSLB EVENT (SLBFPLOP CASE)

MACBETH DNBR vs. TIME FIGURE 15.1.5-15 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD =572 ºF)

STEAM FLOW vs. TIME FIGURE 15.1.6-1 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD =572 ºF)

COLD LEG TEMPERATURES vs. TIME FIGURE 15.1.6-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) RCS TEMPERATURE vs. TIME FIGURE 15.1.6-3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) REACTIVITIES vs. TIME FIGURE 15.1.6-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) CORE POWER FRACTION vs.

TIME FIGURE 15.1.6-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) HEAT FLUX FRACTION vs. TIME FIGURE 15.1.6-6 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) RCS PRESSURE vs. TIME FIGURE 15.1.6-7 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.1.6-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) STEAM GENERATOR LIQUID MASS vs. TIME FIGURE 15.1.6-9 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) RCS FLOW RATE vs. TIME FIGURE 15.1.6-10 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB WITH LOP EVENT (TCOLD = 572 ºF) PRESSURIZER LIQUID VOLUME vs. TIME FIGURE 15.1.6-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SUBCRITICAL MSLB EVENTS SHUTDOWN MARGIN CURVES vs. TIME FIGURE 15.1.6-12 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE POWER vs. TIME FIGURE 15.2.3-1 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE HEAT FLUX vs. TIME FIGURE 15.2.3-2 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE REACTIVITIES vs. TIME FIGURE 15.2.3-3 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR RCS TEMPERATURES vs. TIME FIGURE 15.2.3-4 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR RCS PRESSURE vs. TIME FIGURE 15.2.3-5 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR RCS PRESSURE vs. TIME FIGURE 15.2.3-6 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.3-7 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.3-8 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.2.3-9 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG PRESSURE vs. TIME FIGURE 15.2.3-10 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LEVEL vs. TIME FIGURE 15.2.3-11 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LIQUID INVENTORY vs. TIME FIGURE 15.2.3-12 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR INTEGRATED STEAM FLOW vs. TIME FIGURE 15.2.3-13 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR DNBR vs. TIME FIGURE 15.2.3-14A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR DNBR vs. TIME FIGURE 15.2.3-14B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE POWER vs. TIME FIGURE 15.2.3-15 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE HEAT FLUX vs. TIME FIGURE 15.2.3-16 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR CORE REACTIVITIES vs. TIME FIGURE 15.2.3-17 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR RCS TEMPERATURES vs. TIME FIGURE 15.2.3-18 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR RCS PRESSURE vs. TIME FIGURE 15.2.3-19 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.3-20 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR PRESSURE WATER VOLUME vs. TIME FIGURE 15.2.3-21 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG PRESSURE vs. TIME FIGURE 15.2.3-22 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG PRESSURE vs. TIME FIGURE 15.2.3-23 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LEVEL vs. TIME FIGURE 15.2.3-24 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LEVEL vs. TIME FIGURE 15.2.3-25 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LIQUID INVENTORY vs. TIME FIGURE 15.2.3-26 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SG LIQUID INVENTORY vs. TIME FIGURE 15.2.3-27 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR INTEGRATED STEAM FLOW vs. TIME FIGURE 15.2.3-28 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE CORE POWER vs. TIME FIGURE 15.2.8-16 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE CORE HEAT FLUX vs. TIME FIGURE 15.2.8-17 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE CORE REACTIVITIES vs. TIME FIGURE 15.2.8-18 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE RCS PRESSURE vs. TIME FIGURE 15.2.8-19 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.8-20 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.2.8-21 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE SG PRESSURE vs. TIME FIGURE 15.2.8-22 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE SG WATER LEVEL vs. TIME FIGURE 15.2.8-23 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE SG LIQUID INVENTORY vs. TIME FIGURE 15.2.8-24 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE RCS LOOP FLOW vs. TIME FIGURE 15.2.8-25 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE SG STEAM FLOW vs. TIME FIGURE 15.2.8-26 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE BREAK FLOW vs. TIME FIGURE 15.2.8-27 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE BREAK ENTHALPY vs. TIME FIGURE 15.2.8-28 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE PSV FLOW vs. TIME FIGURE 15.2.8-29 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE SURGE FLOW vs. TIME FIGURE 15.2.8-30 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITH LOP PRIMARY PEAK PRESSURE/FUEL PERFORMANCE CASE DNBR vs. TIME FIGURE 15.2.8-31 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE CORE POWER vs. TIME FIGURE 15.2.8-32 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE CORE HEAT FLUX vs. TIME FIGURE 15.2.8-33 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE CORE REACTIVITIES vs. TIME FIGURE 15.2.8-34 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE RCS TEMPERATURES vs. TIME FIGURE 15.2.8-35 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.8-36a JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE RCS PRESSURE vs. TIME FIGURE 15.2.8-36b JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.2.8-37 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE SG PRESSURE vs. TIME FIGURE 15.2.8-38 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE SG WATER LEVEL vs. TIME FIGURE 15.2.8-39 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE SG LIQUID INVENTORY vs. TIME FIGURE 15.2.8-40 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FWLB WITHOUT LOP PLUS SF PRIMARY PEAK PRESSURE CASE RCS LOOP FLOW vs. TIME FIGURE 15.2.8-41 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CORE POWER vs. TIME FIGURE 15.2.8-42 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNAFFECTED LOOP RCS TEMPERATURES vs. TIME FIGURE 15.2.8-43 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR RCS PRESSURE vs. TIME FIGURE 15.2.8-44 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PRESSURIZER PRESSURE vs. TIME FIGURE 15.2.8-45 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.2.8-46 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SG PRESSURE vs. TIME FIGURE 15.2.8-47 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SG LIQUID INVENTORY vs. TIME FIGURE 15.2.8-48 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR AFFECTED SG AFW FLOW vs. TIME FIGURE 15.2.8-49 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNAFFECTED SG AFW FLOW vs. TIME FIGURE 15.2.8-50 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PSV FLOW vs. TIME FIGURE 15.2.8-51 JUNE 2013 REVISION 17

Peak Primary Pressure case CORE POWER, % of rated TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW CORE POWER vs. TIME FIGURE 15.3.1-1 JUNE 2013 REVISION 17

Peak Primary Pressure Case CORE AVERAGE HEAT FLUX,, % of rated TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW CORE AVERAGE HEAT FLUX vs. TIME FIGURE 15.3.1-2 JUNE 2013 REVISION 17

Peak Primary Pressure Case PRESSURIZER PRESSURE, psig TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW PRESSURIZER PRESSURE vs. TIME FIGURE 15.3.1-3 JUNE 2013 REVISION 17

Peak Primary Pressure Case SG1 RCS TEMPERATURES, deg F TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW RCS TEMPERATURES vs. TIME FIGURE 15.3.1-4 JUNE 2013 REVISION 17

Peak Primary Pressure Case REACTIVITIES, % delta rho TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW REACTIVITIES vs. TIME FIGURE 15.3.1-5 JUNE 2013 REVISION 17

Peak Primary Pressure Case RCS FLOW, fraction TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW CORE FLOW FRACTION vs. TIME FIGURE 15.3.1-6 JUNE 2013 REVISION 17

Peak Secondary Pressure Case SG Pressure, psia PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.3.1-7 JUNE 2013 REVISION 17

Peak Primary Pressure Case CORE POWER, % of rated PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW CORE POWER vs. TIME (0-30 SEC.)

FIGURE 15.3.1-8 JUNE 2013 REVISION 17

Peak Primary Pressure Case PRESSURIZER PRESSURE, psia PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW PRESSURIZER PRESSURE vs. TIME (0-30 SEC.)

FIGURE 15.3.1-9 JUNE 2013 REVISION 17

Peak Primary Pressure Case RCS PRESSURE, psia TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW RCS PRESSURE vs. TIME (0-30 SEC)

FIGURE 15.3.1-10 JUNE 2013 REVISION 17

Peak Primary Pressure Case RCS FLOW, fraction PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW RCS FLOW FRACTION vs. TIME (0-30 SEC)

FIGURE 15.3.1-11 JUNE 2013 REVISION 17

Peak Primary Pressure Case REACTIVITIES, % delta rho PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW REACTIVITIES vs. TIME (0-30 SEC)

FIGURE 15.3.1-12 JUNE 2013 REVISION 17

Peak Secondary Pressure Case Steam Generator Pressure, psia TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW SG PRESSURE, psia (0-30 SEC)

FIGURE 15.3.1-13 JUNE 2013 REVISION 17

DNBR TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW MINIMUM DNBR vs. TIME FIGURE 15.3.1-14A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW MINIMUM DNBR vs. TIME FIGURE 15.3.1-14B JUNE 2019 CE16NGF Fuel REVISION 20

REACTIVITY, % delta rho TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TOTAL LOSS OF FORCED COOLANT FLOW REACTIVITY vs. TIME (0-4 SEC)

FIGURE 15.3.1-15 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP CORE POWER vs. TIME FIGURE 15.3.4-1 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP HEAT FLUX vs. TIME FIGURE 15.3.4-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP PRESSURIZER PRESSURE vs. TIME FIGURE 15.3.4-3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP RCS PRESSURE vs. TIME FIGURE 15.3.4-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP CORE INLET TEMPERATURE vs. TIME FIGURE 15.3.4-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP RCS TEMPERATURES vs. TIME FIGURE 15.3.4-6 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP REACTIVITY vs. TIME FIGURE 15.3.4-7 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP CORE FLOW vs. TIME FIGURE 15.3.4-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.3.4-9 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.3.4-10 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP AUXILIARY FEEDWATER FLOW vs. TIME FIGURE 15.3.4-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP DNBR vs. TIME FIGURE 15.3.4-12A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SINGLE RCP SHAFT BREAK WITH LOSS OF OFF-SITE POWER RESULTING FROM TURBINE TRIP DNBR vs. TIME FIGURE 15.3.4-12B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL CORE POWER vs. TIME FIGURE 15.4.1-1 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL CORE HEAT FLUX vs. TIME FIGURE 15.4.1-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL RCS PRESSURE vs. TIME FIGURE 15.4.1-3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL TOTAL REACTIVITY vs. TIME FIGURE 15.4.1-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL DOPPLER REACTIVITY vs. TIME FIGURE 15.4.1-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL RCS TEMPERATURE vs. TIME FIGURE 15.4.1-6 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL CETOP DNBR vs. TIME FIGURE 15.4.1-7A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL CETOP DNBR vs. TIME FIGURE 15.4.1-7B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED SUBCRITICAL CEA WITHDRAWAL SUBCRITICAL ENERGY DEPOSITION vs. TIME FIGURE 15.4.1-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL CORE POWER vs. TIME FIGURE 15.4.1-9 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL CORE AVERAGE HEAT FLUX vs. TIME FIGURE 15.4.1-10 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL PRESSURIZER PRESSURE vs. TIME FIGURE 15.4.1-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL TOTAL REACTIVITY vs. TIME FIGURE 15.4.1-12 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL DOPPLER REACTIVITY vs. TIME FIGURE 15.4.1-13 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL RCS TEMPERATURE vs. TIME FIGURE 15.4.1-14 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL CETOP DNBR vs. TIME FIGURE 15.4.1-15A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL CETOP DNBR vs. TIME FIGURE 15.4.1-15B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR HOT ZERO POWER CEA WITHDRAWAL HOT ZERO POWER ENERGY DEPOSITION vs. TIME FIGURE 15.4.1-16 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER CORE POWER vs. TIME FIGURE 15.4.2-1 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER CORE HEAT FLUX vs. TIME FIGURE 15.4.2-2 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER RCS PRESSURE vs. TIME FIGURE 15.4.2-3 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER DNBR vs. TIME FIGURE 15.4.2-4A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER DNBR vs. TIME FIGURE 15.4.2-4B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER RCS TEMPERATURE vs. TIME FIGURE 15.4.2-5 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.4.2-6 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER PEAK LINEAR HEAT GENERATION vs. TIME FIGURE 15.4.2-7 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER FEEDWATER ENTHALPY vs. TIME FIGURE 15.4.2-8 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER FEEDWATER FLOW vs. TIME FIGURE 15.4.2-9 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER MSSV FLOW vs. TIME FIGURE 15.4.2-10 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR UNCONTROLLED CEA WITHDRAWAL AT POWER TOTAL STEAM FLOW vs. TIME FIGURE 15.4.2-11 JUNE 2015 REVISION 18

FIGURE 15.4.7-1 DELETED

FIGURE 15.4.7-2 DELETED

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA EJECTION CORE POWER vs. TIME (Plots are based on bounding 3990 MWt case)

FIGURE 15.4.8-1 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA EJECTION PEAK POWER DENSITY vs. TIME (Plots are based on bounding 3990 MWt case)

FIGURE 15.4.8-2 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA EJECTION CORE AVERAGE HEAT FLUX vs. TIME (Plots are based on bounding 3990 MWt case)

FIGURE 15.4.8-3 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA EJECTION PEAK HOT CHANNEL GEAT FLUX vs. TIME (Plots are based on bounding 3990 MWt case)

FIGURE 15.4.8-4 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA EJECTION HOT AND AVERAGE CHANNEL FUEL AND CLAD TEMPERATURE (Plots are based on bounding 3990 MWt case)

FIGURE 15.4.8-5 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION CORE POWER vs. TIME FIGURE 15.5.2-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION CORE AVERAGE HEAT FLUX vs. TIME FIGURE 15.5.2-3 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION PRESSURIZER PRESSURE vs. TIME FIGURE 15.5.2-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FIGURE 15.5.2-4A JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION CORE AVERAGE COOLANT TEMPERATURES vs.

TIME FIGURE 15.5.2-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION PRESSURIZER WATER VOLUME vs. TIME FIGURE 15.5.2-6 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION STEAM GENERATOR WATER LEVEL vs. TIME FIGURE 15.5.2-7 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION STEAM GENERATOR PRESSURE vs. TIME FIGURE 15.5.2-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION TOTAL STEAM FLOW vs. TIME FIGURE 15.5.2-9 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION FEEDWATER FLOW vs. TIME FIGURE 15.5.2-10 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PLCS MALFUNCTION FEEDWATER ENTHALPY vs. TIME FIGURE 15.5.2-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE CORE POWER VS. TIME FIGURE 15.6.2-1 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE CORE AVERAGE HEAT FLUX VS. TIME FIGURE 15.6.2-2 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE PRESSURIZER PRESSURE VS. TIME FIGURE 15.6.2-3 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE RCS PRESSURE VS. TIME FIGURE 15.6.2-4 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE RCS TEMPERATURE VS. TIME FIGURE 15.6.2-5 JUNE 2013 REVISION 17

PRESSURIZER LEVEL, percent PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE PRESSURIZER LEVEL VS. TIME FIGURE 15.6.2-6 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE INTEGRATED PRIMARY COOLANT DISCHARGE VS. TIME FIGURE 15.6.2-7 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE BREAK FLOW VS. TIME FIGURE 15.6.2-8 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE BREAK FLASHING FRACTION VS. TIME FIGURE 15.6.2-9 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE RCS INVENTORY VS. TIME FIGURE 15.6.2-10 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE SG PRESSURE VS. TIME FIGURE 15.6.2-11 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE SG WATER LEVEL VS. TIME FIGURE 15.6.2-12 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE TOTAL STEAM FLOW VS. TIME FIGURE 15.6.2-13 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE TOTAL FW FLOW VS. TIME FIGURE 15.6.2-14 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE FW ENTHALPY VS. TIME FIGURE 15.6.2-15 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE DNBR VS. TIME FIGURE 15.6.2-16A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LETDOWNLINE BREAK, OUTSIDE CONTAINMENT, UPSTREAM OF LETDOWN LINE CONTROL VALVE DNBR VS. TIME FIGURE 15.6.2-16B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT CORE POWER vs. TIME FIGURE 15.6.3-1 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT CORE POWER vs. TIME FIGURE 15.6.3-1 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS PRESSURE vs. TIME FIGURE 15.6.3-2 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS PRESSURE vs. TIME FIGURE 15.6.3-2 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS TEMPERATURES AFFECTED LOOP vs. TIME FIGURE 15.6.3-3 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS TEMPERATURES AFFECTED LOOP vs. TIME FIGURE 15.6.3-3 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT UPPER HEAD TEMPERATURE vs. TIME FIGURE 15.6.3-4 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT UPPER HEAD TEMPERATURE vs. TIME FIGURE 15.6.3-4 (SHEET 2 OF 2)

JUNE 2017 REVISION 19

TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT PRESSURIZER LIQUID VOLUME vs. TIME FIGURE 15.6.3-5 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT PRESSURIZER LIQUID VOLUME vs. TIME FIGURE 15.6.3-5 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT UPPER HEAD LEVEL vs. TIME FIGURE 15.6.3-6 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT UPPER HEAD LEVEL vs. TIME FIGURE 15.6.3-6 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS TOTAL MASS vs. TIME FIGURE 15.6.3-7 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RCS TOTAL MASS vs. TIME FIGURE 15.6.3-7 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SG PRESSURE vs. TIME FIGURE 15.6.3-8 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SG PRESSURE vs. TIME FIGURE 15.6.3-8 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT AFW INTEGRATED FLOW vs. TIME FIGURE 15.6.3-9 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT AFW INTEGRATED FLOW vs. TIME FIGURE 15.6.3-9 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT TUBE LEAK RATE vs. TIME FIGURE 15.6.3-10 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT TUBE LEAK RATE vs. TIME FIGURE 15.6.3-10 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT INTEGRATED TUBE LEAK FLOW vs. TIME FIGURE 15.6.3-11 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT INTEGRATED TUBE LEAK FLOW vs. TIME FIGURE 15.6.3-11 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RUPTURED TUBE LEAK FLASHING FRACTION vs. TIME FIGURE 15.6.3-12 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT RUPTURED TUBE LEAK FLASHING FRACTION vs. TIME FIGURE 15.6.3-12 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SG LIQUID INVENTORY vs. TIME FIGURE 15.6.3-13 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SG LIQUID INVENTORY vs. TIME FIGURE 15.6.3-13 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

TIME, seconds PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT INTEGRATED ADV FLOW vs. TIME FIGURE 15.6.3-14 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT INTEGRATED ADV FLOW vs. TIME FIGURE 15.6.3-14 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SUBCOOLED MARGIN vs. TIME FIGURE 15.6.3-15 (SHEET 1 OF 2)

JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR SGTRLOP WITH SINGLE FAILURE EVENT SUBCOOLED MARGIN vs. TIME FIGURE 15.6.3-15 (SHEET 2 OF 2)

JUNE 2011 REVISION 16

FIGURE 15.6.3 DELETED JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR A FUEL HANDLING ACCIDENT INSIDE CONTAINMENT FIGURE 15.7.4-2 JUNE 2007 REVISION 14

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR LIMITING INFREQUENT EVENTS (i.e. AOOs WITH SINGLE FAILURE)

Figure 15E-1A JUNE 2019 CE16STD Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED UFSAR LIMITING INFREQUENT EVENTS (i.e. AOOs WITH SINGLE FAILURE)

Figure 15E-1B JUNE 2019 CE16NGF Fuel REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR REACTOR COOLANT GAS VENT SYSTEM SIMPLIFIED ISOMETRIC FIGURE 18.II.B-1 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR ACCIDENT MONITORING SYSTEM (QSPDS/ERFDADS)

FIGURE 18B-1 JUNE 2009 REVISION 15