ML18193A911

From kanterella
Jump to navigation Jump to search
Figure 10.1-1, Process Flow Diagram Steam and Power Conversion System. Sheet 1 of 2
ML18193A911
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/19/1976
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
10.1.1
Download: ML18193A911 (1)


Text

MAIN FEEDWATER CONTROL VALVE CONTAINMENT 150 L AT I0 N VALVES STEAM DUMP VALVES TO ATMOSPHERE TO ATMOSPHERE TO ATMOSPHERE 2

22 22 MAINTURBINE CONTROL VALVES REHEATERS 1ST 2ND STOP INTERCEPT VALVE STOPINTERCEPT VALVE 10 STOPINTERCEPT VALVE STEAM GENERATOR MAIN STEAM SAFETY VALVES 15 PER LINEI 23 MAIN STEAM ISOLATION VALVES MAIN TURBINE STOP VALVES MOISTURE SEPARATOR LOW PRESSURE TURBINE A LOW PRESSURE TURBINE B

LOW PRESSURE TURBINE 0 I

11 TO ATMOSPHERE STEAM DUMP VALVES TO AT IIID5P H E R E 2

22 MAIN TURBINE STOP VALVES HIGH PRESSURE TURBINE 15 MOISTURE SEPARATOR 5

9 REHEATERS 1ST 2NI 16 3

2 I

4 4

3 2

I 16 16 4

3 2

4 3

2 I

16 16 4

3 2

I 16 BLOWDOWN TO CONDENSATE CLEANUP STEAM GENERATOR TO ATMOSPHERE MAINSTEAM SAFETY VALVES (5 PER LINE) 22 MAIN STEAM ISOLATION VAIYES MAINTURBINE CONTROL VALVES 6d 24 15 9

9 FROM CIRCULATING INATER SYSTEM OY5 22 TURBINE BYPASS VALVES 22 TURBINE BYPASS VALVES 12 22 TURBINE BYPASS VALVES TO CIRCULATING WATER SYSTEM CWS TO PLANT VENT 23 16 j MO7DR AUXILIARY FEEOWATER PUMP 19 19 MAIN CONDENSER 19 14 MAIN CONDENSER 19 24 SLOWDOWN TO CONDENSA E

CLEANUP 17 TO AND FROM TURBINE COOLING WATER SYSTEM MAINTURBINE GLAND STEAM EXHAUSTER 14 DEMINERALIZE WATER MAKEUP 21 CDNOENSATE TANK TURBMIB MOTOR MAKEUP FEED A0 X I LI AR 7 FEEDINATER PUMP AUXILIARY FEEDWATER PUMP 17 17 CONDENSATE PUMP CONDENSATE PUMP VACUUM PUMPS HEATER 7

HEATER 6

HEATER 5

15 FEEOWATER PUMPS 12 HEATER 4

HEATER 3

HEATER 2

HEATER I

19 MOISTURE SEPARATOR CHARCOAL BED AOSORBERS POST FILTERS BLOWER TO ATMOSPHERE HEATER DRAI~

TANK HEATER DRAIN PIJMP FEEOWATER PUMP TURBINE 10 20 HEATER 4

HEATER 3

HEATER 2

HEATER I

19 CONDENSATE CLEANUP SYSTEM MOISTURE SEPARATOR 21 MCES FILTRATIONSYSTEM CHARCOAL BED ADSORBERS POST FILTERS BI.OWER HEATER 7

HEATER 6

HEAIER 5

15 F

EDWATER PUMP TURBINE 12 10 HEATER 4

HEATER 3

HEATER 2

HEATER I

19 21 MCES FILTRATIONSYSTEM Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2 & 3 HIGH PRESSURE FEEOWATER PIEATERS HEATE 7A HEATER DR A I N PUMP R DRAIN NK 20 LOW PRESSURE FEEDWATER HEATERS PROCESS FLOW DIAGRAN STEAM AND POWER CONVERSION SYSTEN (St2eet 1 of 2)

CHANGE'0407-IIA-105 103A5 Figure 10.1-1 January 19, 1976 Amendment 15