Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23181A170 | 30 June 2023 | 2 to Updated Final Safety Analysis Report, Figures | Shutdown Margin |
ML23181A169 | 30 June 2023 | 2 to Updated Final Safety Analysis Report, Figures | |
ML23181A168 | 30 June 2023 | 2 to Updated Final Safety Analysis Report, Figures | |
ML23181A167 | 30 June 2023 | 2 to Updated Final Safety Analysis Report, Figures | |
ML21201A265 | 30 June 2021 | Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) | Shutdown Margin |
ML21201A261 | 30 June 2021 | Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) | |
ML21201A266 | 30 June 2021 | Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) | Boric Acid |
ML19205A220 | 30 June 2019 | Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) | |
ML19205A222 | 30 June 2019 | Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) | Boric Acid |
ML19205A223 | 30 June 2019 | Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) | Shutdown Margin |
ML19205A221 | 30 June 2019 | Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) | |
ML18277A303 | 21 September 2018 | Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 | |
ML18194A095 | 6 August 2018 | Log of Boring PV-45 | |
ML18193A898 | 6 August 2018 | Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. | |
ML18194A087 | 6 August 2018 | Log of Boring PV-62 | |
ML18193A899 | 6 August 2018 | Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. | |
ML18194A094 | 6 August 2018 | Log of Boring PV-44 | |
ML18192B885 | 30 July 2018 | Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. | |
ML18192B887 | 30 July 2018 | Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts | |
ML18192B886 | 30 July 2018 | Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. | |
ML18192B889 | 30 July 2018 | Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. | |
ML18193A079 | 30 July 2018 | Figure 10.4-8, Basic Flow Diagram Feedwater System. | |
ML18193A082 | 30 July 2018 | Figure 11.2-2 P&I Diagram Liquid Radwaste System. | |
ML18192B892 | 30 July 2018 | Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. | |
ML18192B890 | 30 July 2018 | Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. | |
ML18193A080 | 30 July 2018 | Figure 10.4-9, Auxiliary Feedwater System. | |
ML18192B891 | 30 July 2018 | Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. | |
ML18192B888 | 30 July 2018 | Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. | |
ML18192C005 | 18 July 2018 | Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. | |
ML18192B837 | 18 July 2018 | Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. | |
ML18194A258 | 13 July 2018 | Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. | |
ML18194A155 | 13 July 2018 | Log of Boring PV-2 | |
ML18194A367 | 13 July 2018 | Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. | |
ML18194A254 | 13 July 2018 | Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. | |
ML18194A070 | 13 July 2018 | Log of Boring PV-64 | |
ML18194A277 | 13 July 2018 | Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. | |
ML18194A156 | 13 July 2018 | Log of Boring PV-3 | |
ML18194A052 | 13 July 2018 | Site Property | |
ML18194A069 | 13 July 2018 | Log of Boring PV-63 | |
ML18194A158 | 13 July 2018 | Log of Boring PV-5 | |
ML18194A369 | 13 July 2018 | Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. | |
ML18194A058 | 13 July 2018 | Figure 2.5-8, Sections Through Site Vicinity. | |
ML18194A161 | 13 July 2018 | Log of Boring PV-1 | |
ML18194A260 | 13 July 2018 | Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. | |
ML18194A261 | 13 July 2018 | Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. | |
ML18194A157 | 13 July 2018 | Log of Boring PV-4 | |
ML18194A160 | 13 July 2018 | Log of Boring PV-7 | |
ML18194A045 | 13 July 2018 | Figure 2.5-27, Palo Verde Hills, Profile 3-4 | |
ML18194A046 | 13 July 2018 | Figure, Profile 1-2. | |
ML18194A067 | 13 July 2018 | Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. |