ML19205A222

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted)
ML19205A222
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/2019
From: Stephenson C
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
102-07935-MLL/TNW
Download: ML19205A222 (551)


Text

ggA^^XTENSION CEDM Stephenson,

_ . DN: cn=Stephaison, Cart Carl J(Z05778)

Reason: I attest to the accuracy l/7n^77ft^ and integrity of this document Date:2019.06J8135650-07W hm SSEMBLY FUEL ASSEMBLEY

,ggl,5UPP0RT FLOW SKIRT CORE STOP

,OWFR jUPPQRT STRUCTURE IN-CORE INSTRMENTATION NOZZLE PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR REACTOR VERTICAL ARRANGEMENT FIGURE 4.1-1 JUNE 2001 REVISION 11

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FULL-STRENGTH CONTROL ELEMENT ASSEMBLY (4-ELEMENT)

FIGURE 4.2-3 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION FULL-STRENGTH CONTROL ELEMENT ASSEMBLY (12-ELEMENT)

FIGURE 4.2-4 JUNE 2011 REVISION 16

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PART-STRENGTH CONTROL ELEMENT ASSEMBLY FIGURE 4.2-5 JUNE 2011 REVISION 16

NOTE -

1. All dimensions typical, not for design purposes. NGF has two additional intermediate flow mixer grids. PALO VERDE NUCLEAR GENERATING STATION
2. Proprietary GUARDIAN grids UPDATED FSAR may replace the lower Inconel grids on reload assemblies. FUEL ASSEMBLY
3. Inconel grid may replace FIGURE 4.2-6 Zircaloy top grid on reload assemblies. JUNE 2019 REVISION 20

GRID INTERIOR STRIP NOTE -

1. Proprietary GUARDIAN grids may replace the lower Inconel grids on reload assemblies.
2. Inconel grid may replace PALO VERDE NUCLEAR GENERATING STATION Zircaloy top grid on reload UPDATED FSAR assemblies.
3. Pre-NGF mid grid with wavy FUEL SPACER GRID interior strips shown. NGF mid FIGURE 4.2-7 grids have straight interior strips.

JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR COMPARISON OF PRE-NGF (CURRENT DESIGN)

AND NGF FUEL ROD ASSEMBLIES FIGURE 4.2-8B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR COMPARISON OF PRE-NGF (CURRENT DESIGN)

AND NGF BURNABLE ABSORBER ROD ASSEMBLIES FIGURE 4.2-9B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR NORMALIZED POWER DISTRIBUTION OF UNSHIMMED ASSEMBLY USED IN SAMPLE DNB ANALYSIS IN PARAGRAPH 4.4.2.2 FOR TORC/CE-1 CORRELATION PREDICTIONS FIGURE 4.3-2 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR ROD RADIAL POWER FACTORS IN HOT ASSEMBLY FOR SAMPLE DNB ANALYSIS FOR TORC/CE-1 CORRELATION PREDICTIONS FIGURE 4.4-3 JUNE 2019 REVISION 20

1.11 0.97 1.00 1.05 0.99 0.95 093 1.01 1.01 1.01 1.01 1.01 1.01 0.99 0.86 0.98 0.87 0.83 0.84 1.04 0.93 0.90 1.02 0.87 0.94 0.99 1.01 0.96 0.89 0.96 0.96 0.89 0.96 0.96 1.01 1.01 0.93 1.16 1.12 0.97 1.11 1.08 1.13 1.11 1.06 1.09 0.85 0.99 1.10 1.01 0.96 1.08 1.03 1.08 1.03 1.08 1.08 1.03 1.08 0.89 0.96 1.01 1.07 0.89 0.95 0.93 0.95 0.95 1.01 1.00 1.07 0.96 0.96 0.92 0.88 0.84 0.98 1.01 0.89 0.96 0.89 1.01 1.01 1.01 1.01 1.01 1.01 1.01 0.96 0.89 0.96 1.01 1.10 1.08 0.98 1.08 1.05 1.02 0.95 1.07 0.99 0.95 1.04 1.08 0.96 1.09 1.12 1.01 1.08 0.96 1.08 0.99 1.01 0.99 1.01 1.01 0.99 1.01 1.08 0.96 1.08 0.99 0.90 0.86 1.03 0.89 0.98 0.98 0.95 0.95 0.99 1.15 1.01 1.04 0.98 1.03 0.98 0.94 0.90 1.01 0.89 1.08 0.99 1.01 1.01 1.01 1.01 0.99 1.01 1.01 0.99 1.01 1.01 1.03 0.96 1.01 0.95 1.03 1.05 1.02 1.04 1.07 1.03 1.06 1.08 1.05 1.01 1.05 1.05 1.05 1.12 1.20 0.96 1.01 0.96 1.03 1.01 1.01 0.99 1.01 1.01 1.01 1.01 1.01 1.01 1.01 0.99 1.08 0.96 1.01 1.02 0.90 1.02 0.92 0.97 0.98 0.99 1.03 0.96 0.96 1.01 0.91 0.93 0.96 0.98 1.00 0.94 1.01 0.96 1.08 0.99 1.01 1.01 1.01 0.99 1.01 1.01 1.01 0.99 1.01 1.01 1.08 0.96 0.99 1.05 0.88 0.92 1.03 0.87 0.99 0.98 1.03 1.01 0.97 1.02 1.00 0.92 0.95 0.94 0.85 1.16 0.99 0.96 1.03 1.01 0.99 1.01 1.01 1.01 0.99 0.99 1.01 1.01 1.01 1.01 1.08 0.89 1.01 1.05 1.09 1.08 0.96 0.94 1.04 1.06 1.09 0.97 0.91 0.97 1.11 1.05 0.94 1.047 0.81 0.96 1.01 0.96 1.08 1.01 1.01 0.99 1.01 1.01 1.01 1.01 0.99 1.01 1.01 0.99 1.08 0.96 1.01 0.93 1.09 1.04 1.01 1.16 1.12 1.02 1.06 1.02 1.11 0.96 1.05 1.00 1.08 0.98 1.00 1.01 0.99 0.96 1.08 0.99 1.01 1.01 0.99 1.01 0.99 1.01 1.01 0.99 1.01 1.01 1.03 0.96 1.01 1.02 0.92 1.05 0.95 0.79 1.08 0.98 0.99 0.89 1.01 0.99 1.03 0.93 0.93 1.03 0.87 0.90 1.01 1.96 1.03 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 0.99 1.08 0.89 1.01 1.00 1.08 0.96 1.03 1.05 0.98 1.08 1.03 1.04 1.14 1.03 1.09 1.05 1.13 1.08 1.01 1.08 0.96 1.03 1.01 0.99 1.01 1.01 0.99 1.01 0.99 1.08 0.96 1.08 1.01 1.01 0.97 0.91 0.86 0.97 1.05 0.97 1.00 0.95 0.90 1.00 0.92 0.93 0.90 1.00 1.01 0.96 0.96 0.96 1.01 1.01 1.01 0.99 1.01 1.01 1.01 0.89 0.96 0.89 1.01 1.07 0.94 0.93 1.10 1.11 1.13 1.17 1.03 1.11 1.09 0.98 1.00 1.06 0.99 0.96 0.89 1.08 1.03 1.08 1.08 1.03 1.08 1.03 1.08 0.96 1.01 0.94 1.07 0.90 0.99 0.89 1.00 0.88 0.94 0.79 1.07 0.86 1.01 1.01 0.96 0.96 0.89 0.96 0.96 0.89 0.96 1.01 0.99 0.93 0.96 1.02 1.04 1.02 0.96 1.03 0.99 1.01 1.01 1.01 1.01 1.01 1.01 Note: The first (top) values represents the original 4-pump flow distribution based on 3/16 scale flow model tests. The second (bottom) values represents current TORC 4-pump flow distributions based on later Yonggwang 177-assembly tests.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CORE INLET FLOW DISTRIBUTION Qi/Q Bar FIGURE 4.4-14 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR REACTOR COOLANT SYSTEM ARRANGEMENT 3817 MWt FIGURE 5.1-3 Sheet 1 of 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR REACTOR COOLANT SYSTEM ARRANGEMENT 4013 MWt FIGURE 5.1-3 Sheet 2 of 2 JUNE 2009 REVISION 15

NOTE: DATA POINTS ARE DEFINED BY TABLE 5.3-20 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TRANSITION TEMPERATURE SHIFT FOR PLATE AND WELD METAL METAL CONTAINING 0.10 W/O COPPER FIGURE 5.3-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PALO VERDE PRESSURIZER TYPICAL LEVEL SETPOINT PROGRAM FIGURE 5.4-2 JUNE 2009 REVISION 15

REACTOR COOLANT TEMPERATURE ºF STEAM GENERATOR POWER, PERCENT OF RATED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PALO VERDE TYPICAL TEMPERATURE CONTROL PROGRAM FIGURE 5.4-3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR STEAM GENERATOR (TYPICAL)

FIGURE 5.4-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR STEAM GENERATOR CEFLASH MODEL NODES FIGURE 5D-1A JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PV-2 STEAM GENERATOR CEFLASH MODEL FLOW PATHS FIGURE 5D-1B JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PV-2 STEAM GENERATOR CEFLASH MODEL NODES FIGURE 5E-1A JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR PV-2 STEAM GENERATOR CEFLASH MODEL FLOW PATHS FIGURE 5E-1B JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, DOUBLE-ENDED HOT LEG SLOT BREAK, CORE POWER OF 4070 MWt FIGURE 6.2.1-1 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MINIMUM ECCS,,

CORE POWER OF 4070 MWt FIGURE 6.2.1-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MAXIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, DOUBLE-ENDED SUCTION LEG SLOT BREAK, MINIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-4 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, DOUBLE-ENDED SUCTION LEG SLOT BREAK, MAXIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, MSLB (GUILLOTINE) INSIDE CONTAINMENT WITH LOSS OF ONE TRAIN OF CONTAINMENT SPRAY CORE POWER OF 4070 MWt FIGURE 6.2.1-6 SHEET 1 OF 3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, MSLB (GUILLOTINE) INSIDE CONTAINMENT WITH LOSS OF ONE TRAIN OF CONTAINMENT SPRAY CORE POWER OF 4070 MWt FIGURE 6.2.1-6 SHEET 2 OF 3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PRESSURE AND TEMPERATURE RESPONSE, MSLB (GUILLOTINE) INSIDE CONTAINMENT WITH LOSS OF ONE TRAIN OF CONTAINMENT SPRAY CORE POWER OF 4070 MWt FIGURE 6.2.1-6 SHEET 3 OF 3 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONDENSING HEAT TRANSFER COEFFICIENT, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MAXIMUM ECCS, CORE POWER OF 4070 MWt FIGURE 6.2.1-7 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONDENSING HEAT TRANSFER COEFFICIENT, DOUBLE-ENDED SUCTION LEG SLOT BREAK, MINIMUM ECCS, CORE POWER OF 4070 MWt FIGURE 6.2.1-8 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY INVENTORY, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MAXIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-10 SHEET 1 OF 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY INVENTORY, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MAXIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-10 SHEET 1 OF 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY INVENTORY, DOUBLE-ENDED DISCHARGE LEG SLOT BREAK, MAXIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-10 SHEET 2 OF 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY INVENTORY, DOUBLE-ENDED SUCTION LEG SLOT BREAK, MINIMUM ECCS CORE POWER OF 4070 MWt FIGURE 6.2.1-11 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY DISTRIBUTION, MAIN STEAM LINE GUILLOTINE BREAK INSIDE CONTAINMENT WITH LOSS OF ONE TRAIN OF CONTAINMENT SPRAY SYSTEM CORE POWER OF 4070 MWt FIGURE 6.2.1-12 SHEET 1 OF 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ENERGY DISTRIBUTION, MAIN STEAM LINE GUILLOTINE BREAK INSIDE CONTAINMENT WITH LOSS OF ONE TRAIN OF CONTAINMENT SPRAY SYSTEM CORE POWER OF 4070 MWt FIGURE 6.2.1-12 SHEET 2 OF 2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 3990 MWt, STEAM GEN. COMPARTMENT MODEL,55 NODES PRESSURE vs. TIME CURVES FOR 129 IN2 SHUTDOWN COOLING BREAK FIGURE 6.2.1-18 JUNE 2009 REVISION 15

0.6 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE FOR ZIRCALOY-4 CLADDING CONTAINMENT SPRAY AND ECCS SPILLAGE FLOW RATE CE16STD FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT SPRAY AND ECCS SPILLAGE FLOW RATES USED IN THE MINIMUM CONTAINMENT CE16STD FUEL FIGURE 6.2.1-21A JUNE 2019 REVISION 20

0.8 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE CONTAINMENT SPRAY AND ECCS SPILLAGE FLOW RATE CE16NGF FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT SPRAY AND ECCS SPILLAGE FLOW RATES USED IN THE MINIMUM CONTAINMENT PRESSURE ANALYSIS FOR ECCS PERFORMANCE CE16NGF FUEL FIGURE 6.2.1-21B JUNE 2019 REVISION 20

0.6 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE FOR ZIRCALOY-4 CLADDING CONTAINMENT PRESSURE CE16STD FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MINIMUM CONTAINMENT PRESSURE FOR ECCS PERFORMANCE ANALYSIS 0.6 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16STD FUEL FIGURE 6.2.1-22A JUNE 2019 REVISION 20

0.8 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE CONTAINMENT PRESSURE CE16NGF FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MINIMUM CONTAINMENT PRESSURE FOR ECCS PERFORMANCE ANALYSIS 0.8 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16NGF FUEL FIGURE 6.2.1-22B JUNE 2019 REVISION 20

0.6 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE FOR ZIRCALOY-4 CLADDING CONTAINMENT ATMOSPHERE TEMPERATURE CE16STD FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ATMOSPHERE TEMPERATURE 0.6 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16STD FUEL FIGURE 6.2.1-23A JUNE 2019 REVISION 20

0.8 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE CONTAINMENT ATMOSPHERIC TEMPERATURE CE16NGF FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT ATMOSPHERE TEMPERATURE 0.8 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16NGF FUEL FIGURE 6.2.1-23B JUNE 2019 REVISION 20

0.6 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE FOR ZIRCALOY-4 CLADDING CONTAINMENT SUMP TEMPERATURE CE16STD FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT SUMP TEMPERATURE 0.6 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16STD FUEL FIGURE 6.2.1-24A JUNE 2019 REVISION 20

0.8 DOUBLE-ENDED GUILLOTINE COLD LEG BREAK AT PUMP DISCHARGE CONTAINMENT SUMP TEMPERATURE CE16NGF FUEL PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT SUMP TEMPERATURE 0.8 DOUBLE ENDED GUILLOTINE BREAK IN PUMP DISCHARGE LEG CE16NGF FUEL FIGURE 6.2.1-24B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE FIGURE 6.2.4-1 SHEET 1 OF 10 JUNE 2019 REVISION 20

Note 9 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 2 OF 10 JUNE 2015 REVISION 18

SEE NOTE 8 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 3 OF 10 JUNE 2019 REVISION 20

14 SEE NOTE 2 (2,3)

Note 10 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 4 OF 10 JUNE 2015 REVISION 18

See Note 11 See Note 11 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 5 OF 10 JUNE 2015 REVISION 18

See Note 11 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 5A OF 10 JUNE 2015 REVISION 18

SEE NOTES 1 & 7 T

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 6 OF 10 JUNE 2015 REVISION 18

SEE NOTES 1 & 7 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 6A OF 10 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 7 OF 10 JUNE 2015 REVISION 18

SEE NOTE 8 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 8 OF 10 JUNE 2019 REVISION 20

SEE NOTE 12 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 9 OF 10 JUNE 2015 REVISION 18

SEE NOTE 12 PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 9A OF 10 JUNE 2015 REVISION 18

LEGEND:

D = DRAIN V = VENT T = TEST IV = ISOLATION VALVE NOTES:

1. VALVES ARE OPEN IN EVENT OF LOCA.
2. VALVES ARE IN THE SECONDARY SIDE OF THE STEAM GENERATOR (SG). THESE VALVES ARE NOT SUBJECTED TO TYPE C TESTS BECAUSE THEY ARE NOT DEPENDED ON IN THE LOCA DOSE CALCULATIONS TO KEEP THE RADIOLOGICAL CONSEQUENCES OF A LOCA TO WITHIN GDC 19 AND 10 CFR 100 LIMITS. THE LOCA DOSE CALCULATIONS ASSUME A SINGLE FAILURE OF A GDC 57 VALVE OR A STUCK OPEN ADV.
3. ONE BUTTERFLY VALVE WILL BE LEAKAGE TESTED IN REVERSE DIRECTION.
4. BLIND FLANGES MAY ISOLATE PENETRATION IN PLANT OPERATING MODES 1 - 4. WHEN BLIND FLANGE IS INSTALLED, ONLY TYPE B TESTING OF THE BLIND FLANGE IS REQUIRED.
5. THIS NOTE HAS BEEN DELETED.
6. THIS NOTE HAS BEEN DELETED.
7. CONFIGURATION BEFORE (SHEET 6A OF 10) AND AFTER (SHEET 6 OF 10) IMPLEMENTATION OF DMWO 3234780.
8. IN UNITS WHERE DMWO 2529758 HAS BEEN IMPLEMENTED, VALVE CHA-UV-715 IS REMOVED AND VALVES HPA-UV-023 &

HPA-UV-024 ARE DE-TERMINATED WITH UPSTREAM PIPING CUT AND CAPPED AS THE NEW CONTAINMENT BOUNDARY.

9. ALTERNATE RC MAKEUP CONNECTIONS APPLY ONLY TO PENETRATIONS 14 AND 16. EFFECTIVE FOR UNITS WHERE DMWO 4304156 HAS BEEN IMPLEMENTED.
10. LOCATION FOR ALTERNATE SG MAKEUP IS SHOWN FOR PENETRATION 76. PRIMARY SG MAKEUP AT PENETRATION 75 IS SIMILAR BUT IS LOCATED DOWNSTREAM OF FLOW ELEMENT OUTSIDE CONTAINMENT. EFFECTIVE FOR UNITS WHERE DMWO 4345882 HAS BEEN IMPLEMENTED.
11. CONFIGURATION BEFORE (SHEET 5A OF 10) AND AFTER (SHEET 5 OF 10) VALVE (JCHBUV0924) HAS BEEN REMOVED AND REPLACED WITH A SOCKET WELD CAP IN UNITS WHERE DMWO 2778159 HAS BEEN IMPLEMENTED.
12. CONFIGURATION BEFORE (SHEET 9A OF 10) AND AFTER (SHEET 9 OF 10) VALVE (JSIAUV0708) AND DOWNSTREAM DRAIN VALVE (PSSNV082) HAVE BEEN REMOVED AND REPLACED WITH A SOCKET WELD CAP IN UNITS WHERE DMWO 2778159 HAS BEEN IMPLEMENTED.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT PENETRATION VALVE ARRANGEMENT FIGURE 6.2.4-1 SHEET 10 OF 10 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POST-LOCA H3 BUILDUP CORE POWER 4070 MWt FIGURE 6.2.5-1 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR H2 PRODUCTION RATES vs. TIME CORE POWER 4070 MWt FIGURE 6.2.5-2 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.2-1A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.2-1A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16STD FUEL FIGURE 6.3.3a.2-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16NGF FUEL FIGURE 6.3.3b.2-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK LEAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK LEAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16STD FUEL FIGURE 6.3.3a.2-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16NGF FUEL FIGURE 6.3.3b.2-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK CONTAINMENT PRESSURE CE16STD FUEL FIGURE 6.3.3a.2-1F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK CONTAINMENT PRESSURE CE16NGF FUEL FIGURE 6.3.3b.2-1F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16STD FUEL FIGURE 6.3.3a.2-1G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16NGF FUEL FIGURE 6.3.3b.2-1G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-1H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 1.0 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.2-1H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.2-2A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.2-2A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16STD FUEL FIGURE 6.3.3a.2-2B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16NGF FUEL FIGURE 6.3.3b.2-2B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK LEAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-2C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK LEAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-2C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-2D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-2D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16STD FUEL FIGURE 6.3.3a.2-2E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16NGF FUEL FIGURE 6.3.3b.2-2E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CONTAINMENT PRESSURE CE16STD FUEL FIGURE 6.3.3a.2-2F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CONTAINMENT PRESSURE CE16NGF FUEL FIGURE 6.3.3b.2-2F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16STD FUEL FIGURE 6.3.3a.2-2G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16NGF FUEL FIGURE 6.3.3b.2-2G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-2H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.2-2H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK MID ANNULUS FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-2I JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK QUALITY ABOVE AND BELOW THE CORE CE16NGF FUEL FIGURE 6.3.3b.2-2J JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CORE PRESSURE DROP CE16NGF FUEL FIGURE 6.3.3b.2-2K JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK SAFETY INJECTION FLOW RATE INTO INTACT DISCHARGE LEG CE16NGF FUEL FIGURE 6.3.3b.2-2L JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK WATER LEVEL IN DOWNCOMER DURING REFLOOD CE16NGF FUEL FIGURE 6.3.3b.2-2M JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT SPOT GAP CONDUCTANCE CE16NGF FUEL FIGURE 6.3.3b.2-2N JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK LOCAL CLADDING OXIDATION PERCENTAGE CE16NGF FUEL FIGURE 6.3.3b.2-2O JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK FUEL CL & AVE., CLAD, COOLANT TEMPS AT THE HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.2-2P JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT SPOT HEAT TRANSFER COEFFICIENT CE16NGF FUEL FIGURE 6.3.3b.2-2Q JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK HOT PIN PRESSURE CE16NGF FUEL FIGURE 6.3.3b.2-2R JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CONTAINMENT ATMOSPHERE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.2-2S JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CONTAINMENT SUMP TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.2-2T JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.8 DEG/PD BREAK CORE BULK CHANNEL FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-2U JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.2-3A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.2-3A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16STD FUEL FIGURE 6.3.3a.2-3B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16NGF FUEL FIGURE 6.3.3b.2-3B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK LEAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-3C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK LEAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-3C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-3D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.2-3D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16STD FUEL FIGURE 6.3.3a.2-3E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16NGF FUEL FIGURE 6.3.3b.2-3E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CONTAINMENT PRESSURE CE16STD FUEL FIGURE 6.3.3a.2-3F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CONTAINMENT PRESSURE CE16NGF FUEL FIGURE 6.3.3b.2-3F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16STD FUEL FIGURE 6.3.3a.2-3G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16NGF FUEL FIGURE 6.3.3b.2-3G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-3H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.2-3H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK MID ANNULUS FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-3I JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK QUALITY ABOVE AND BELOW THE CORE CE16STD FUEL FIGURE 6.3.3a.2-3J JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CORE PRESSURE DROP CE16STD FUEL FIGURE 6.3.3a.2-3K JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK SAFETY INJECTION FLOW RATE INTO INTACT DISCHARGE LEG CE16STD FUEL FIGURE 6.3.3a.2-3L JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK WATER LEVEL IN DOWNCOMER DURING REFLOOD CE16STD FUEL FIGURE 6.3.3a.2-3M JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT SPOT GAP CONDUCTANCE CE16STD FUEL FIGURE 6.3.3a.2-3N JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK LOCAL CLADDING OXIDATION PERCENTAGE CE16STD FUEL FIGURE 6.3.3a.2-3O JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK LOCAL CLADDING OXIDATION PERCENTAGE CE16NGF FUEL FIGURE 6.3.3b.2-3O JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK FUEL CL & AVE., CLAD, COOLANT TEMPS AT THE HOT SPOT CE16STD FUEL FIGURE 6.3.3a.2-3P JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT SPOT HEAT TRANSFER COEFFICIENT CE16STD FUEL FIGURE 6.3.3a.2-3Q JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK HOT PIN PRESSURE CE16STD FUEL FIGURE 6.3.3a.2-3R JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CONTAINMENT ATMOSPHERE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-3S JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CONTAINMENT SUMP TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-3T JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.6 DEG/PD BREAK CORE BULK CHANNEL FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-3U JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.2-4A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK PRESSURE IN CENTER HOT ASSEMBLY NODE CE16STD FUEL FIGURE 6.3.3a.2-4B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK LEAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-4C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK HOT ASSEMBLY FLOW RATE CE16STD FUEL FIGURE 6.3.3a.2-4D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK HOT ASSEMBLY QUALITY CE16STD FUEL FIGURE 6.3.3a.2-4E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK CONTAINMENT PRESSURE CE16STD FUEL FIGURE 6.3.3a.2-4F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK MASS ADDED TO CORE DURING REFLOOD CE16STD FUEL FIGURE 6.3.3a.2-4G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LBLOCA ECCS PERFORMANCE ANALYSIS 0.4 DEG/PD BREAK PEAK CLADDING TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.2-4H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-1A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-1A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-1F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-1F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-1G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-1G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-1H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.075 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-1H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-2A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-2A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-2B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-2B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-2C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-2C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-2D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-2D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-2E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-2E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-2F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-2F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-2G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-2G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.06 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-2H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.07 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-2H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-3A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-3A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-3B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-3B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-3C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-3C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-3D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-3D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-3E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-3E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-3F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-3F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-3G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-3G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-3H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.065 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-3H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-4A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-4A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-4B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-4B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-4C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-4C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-4D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-4D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-4E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-4E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-4F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-4F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-4G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-4G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.04 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-4H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.05 FT2 COLD LEG BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-4H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-5A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-5A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-5B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-5B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-5C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-5C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-5D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-5D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-5E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-5E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-5F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-5F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-5G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-5G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-5H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.03 FT2 BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-5H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-6A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-6A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-6B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-6B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-6C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-6C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-6D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-6D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-6E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-6E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-6F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-6F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-6G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-6G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-6H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 0.01 FT2 BREAK AT PUMP DISCHARGE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-6H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER CE16STD FUEL FIGURE 6.3.3a.3-7A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER CE16NGF FUEL FIGURE 6.3.3b.3-7A JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL PRESSURE CE16STD FUEL FIGURE 6.3.3a.3-7B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL PRESSURE CE16NGF FUEL FIGURE 6.3.3b.3-7B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE BREAK FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-7C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE BREAK FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-7C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL INLET FLOW RATE CE16STD FUEL FIGURE 6.3.3a.3-7D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL INLET FLOW RATE CE16NGF FUEL FIGURE 6.3.3b.3-7D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16STD FUEL FIGURE 6.3.3a.3-7E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE LEVEL CE16NGF FUEL FIGURE 6.3.3b.3-7E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-7F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE HEAT TRANSFER COEFFICIENT AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-7F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT CE16STD FUEL FIGURE 6.3.3a.3-7G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT CE16NGF FUEL FIGURE 6.3.3b.3-7G JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE HOT SPOT CLAD SURFACE TEMPERATURE CE16STD FUEL FIGURE 6.3.3a.3-7H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BREAK AT PRESSURIZER SAFETY VALVE HOT SPOT CLAD SURFACE TEMPERATURE CE16NGF FUEL FIGURE 6.3.3b.3-7H JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MAXIMUM HOT SPOT CLAD TEMPERATURE VERSUS BREAK SIZE CE16STD FUEL FIGURE 6.3.3a.3-8 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MAXIMUM HOT SPOT CLAD TEMPERATURE VERSUS BREAK SIZE CE16NGF FUEL FIGURE 6.3.3b.3-8 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LONG TERM COOLING PLAN CE16STD FUEL FIGURE 6.3.3a.4-1 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LONG TERM COOLING PLAN CE16NGF FUEL FIGURE 6.3.3b.4-1 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CORE FLUSH BY HOT SIDE INJECTION FOR 9.8 Ft2 COLD LEG BREAK CE16STD FUEL FIGURE 6.3.3a.4-2 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR INNER VESSEL BORIC ACID CONCENTRATION VS TIME CE16STD FUEL FIGURE 6.3.3a.4-3 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BORIC ACID CONCENTRATION IN THE CORE VS TIME CE16NGF FUEL FIGURE 6.3.3b.4-3 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR RCS REFILL TIME VS BREAK AREA CE16STD FUEL FIGURE 6.3.3a.4-4 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR RCS REFILL TIME VS BREAK AREA CE16NGF FUEL FIGURE 6.3.3b.4-4 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR OVERLAP OF ACCEPTABLE LTC MODES IN TERMS OF COLD LEG BREAK SIZE CE16STD FUEL FIGURE 6.3.3a.4-5 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR OVERLAP OF ACCEPTABLE LTC MODES IN TERMS OF COLD LEG BREAK SIZE CE16NGF FUEL FIGURE 6.3.3b.4-5 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR RCS PRESSURE AFTER REFILL VS BREAK AREA CE16STD FUEL FIGURE 6.3.3a.4-6 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR RCS PRESSURE AT THE DECISION TIME VS BREAK AREA CE16NGF FUEL FIGURE 6.3.3b.4-6 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 1 OF 6 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 1 OF 6 JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 2 OF 6 CESSAR FIG. 6.3.3.5-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 2 OF 6 CESSAR FIG. 6.3.3.5-1B JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 3 OF 6 CESSAR FIG. 6.3.3.5-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 3 OF 6 CESSAR FIG. 6.3.3.5-1C JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 4 OF 6 CESSAR FIG. 6.3.3.5-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 4 OF 6 CESSAR FIG. 6.3.3.5-1D JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 5 OF 6 CESSAR FIG. 6.3.3.5-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 5 OF 6 CESSAR FIG. 6.3.3.5-1E JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16STD FUEL FIGURE 6.3.3a.5-1 SHEET 6 OF 6 CESSAR FIG. 6.3.3.5-1F JUNE 2019 REVISION 20

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SEQUENCE OF EVENTS DIAGRAM FOR LARGE AND SMALL BREAK LOCAS CE16NGF FUEL FIGURE 6.3.3b.5-1 SHEET 6 OF 6 CESSAR FIG. 6.3.3.5-1F JUNE 2019 REVISION 20

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CONTAINMENT RECIRCULATION SUMP REPLACMENT STRAINER DETAIL FIGURE 6A-5 JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR CEA POSITION SIGNALS WITHIN REACTOR PROTECTIVE SYSTEM FIGURE 7.2-0D JUNE 2017 REVISION 19

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

FIGURE 7.2-4 DELETED

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SPLA FUNCTIONAL BLOCK DIAGRAM FIGURE 7.2-5 JUNE 2019 REVISION 20

FIGURE 7.2-6 DELETED

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BASIC PPS TESTING SYSTEM (SHOWN FOR REACTOR PROTECTIVE SYSTEM)

FIGURE 7.2-7 JUNE 2019 REVISION 20

FIGURE 7.2-8 DELETED

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR MATRIX, BISTABLE TRIP AND LOG TRIP INTERLOCK CKT.

FIGURE 7.2-9 JUNE 2019 REVISION 20

FIGURE 7.2-10 DELETED

FIGURE 7.2-11 DELETED

(Captive screws hold slide out chassis in place.)

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR TYPICAL P.P.S. BAY LAYOUT FIGURE 7.2-13 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR ESFAS AUXILIARY RELAY CABINET SCHEMATIC DIAGRAM FOR TYPICAL ACTUATION SIGNAL FIGURE 7.3-8A JUNE 2009 REVISION 15

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR NOTE: FOR CABINET B SUBSTITUTE VITAL BUS C FOR A, D FOR B, EFAS-2 VALVE 1B1 FOR EFAS-1 VALVE 1A1 AND EFAS-2 VALVE 2B1 ESFAS AUXILIARY RELAY CABINET FOR EFAS-1 VALVE 2A1 SCHEMATIC DIAGRAM FOR THE EFAS FIGURE 7.3-8B JUNE 2009 REVISION 15

This Figure has been redacted.

SDCVI - SHUTDOWN COOLING VALVE INTERLOCKS SITVI - SAFETY INJECTION TANK VALVE INTERLOCKS PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SAFETY-RELATED INTERLOCK LOGIC CIRCUIT FIGURE 7.6-1 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SAFETY INJECTION TANK ISOLATION VALVE INTERLOCKS FIGURE 7.6-2 JUNE 2003 REVISION 12

FIGURE 7.7-10 DELETED

Figure 8.1-1 Sheet 1 of 2 has been deleted Refer to Western Electricity Coordinating Council (WECC) maps for latest Grid System.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR GRID SYSTEM FIGURE 8.1-1 SHEET 1 OF 2 JUNE 2015 REVISION 18

Figure 8.1-1 Sheet 2 of 2 has been deleted Refer to Western Electricity Coordinating Council (WECC) maps for latest Grid System.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR GRID SYSTEM FIGURE 8.1-1 SHEET 2 OF 2 JUNE 2015 REVISION 18

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 525 KV SWITCHYARD AND CONNECTIONS TO ONSITE POWER SYSTEM FIGURE 8.2-1 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR 525 SWITCHYARD AND SINGLE LINE DIAGRAM FOR UNITS 1, 2, AND 3 FIGURE 8.2-2 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LOGIC DIAGRAM DIESEL GENERATOR STARTING AND ESF BUS LOADING SEQUENCE FIGURE 8.3-1 SHEET 1 OF 2 JUNE 2017 REVISION 19

SIAS / CSAS SIAS / CSAS PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LOGIC DIAGRAM DIESEL GENERATOR STARTING AND ESF BUS LOADING SEQUENCE FIGURE 8.3-1 SHEET 2 OF 2 JUNE 2017 REVISION 19

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR FAILURE MODE AND EFFECTS ANALYSIS AC POWER SYSTEM FIGURE 8.3-2 JUNE 2017 REVISION 19

Figure only applicable to Class 1E buses not yet modified by DMWO 4544651.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR LOSS OF BUS VOLTAGE SETTING TIME VS. VOLTS FIGURE 8.3-3 JUNE 2019 REVISION 20

FIGURE 8B.1A-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 1A FIGURE 8B.1A-1 JUNE 2013 REVISION 17

FIGURE 8B.1B-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 1B FIGURE 8B.1B-1 JUNE 2013 REVISION 17

FIGURE 8B.2A-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 2A FIGURE 8B.2A-1 JUNE 2013 REVISION 17

FIGURE 8B.2B-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 2B FIGURE 8B.2B-1 JUNE 2013 REVISION 17

FIGURE 8B.3A-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 3A FIGURE 8B.3A-1 JUNE 2013 REVISION 17

FIGURE 8B.3B-1 DELETED PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR POWER FLOW MAP CASE 3B FIGURE 8B.3B-1 JUNE 2013 REVISION 17

This Figure has been redacted.

FIGURE 9.1-5 DELETED

FIGURE 9.1-6 DELETED

FIGURE 9.1-7 DELETED

FIGURE 9.1-7A DELETED

Array A 1 X Two Region 1 assemblies (1) checkerboarded with two blocked cells (X). The Region 1 assemblies are each in a cell with a stainless steel L-insert. No NETCO-SNAP-IN inserts are credited. X 1 Array B 1 TC Two Region 1 assemblies (1) checkerboarded with two cells containing trash cans (TC). The Region 1 assemblies are each in a cell with a stainless steel L-insert. Every cell without a stainless TC 1 steel L-insert must contain a NETCO-SNAP-IN insert.

Array C 2 X Two Region 2 assemblies (2) checkerboarded with one Region 3 assembly (3) and one blocked cell (X). The Region 2 assemblies are each in a cell with a stainless steel L-insert. The Region 3 3 2 assembly is in a cell containing a NETCO-SNAP-IN insert.

Array D 2 4 One Region 2 assembly (2) checkerboarded with three Region 4 assemblies (4). The Region 2 assembly and the diagonally located Region 4 assembly are each in a storage cell with a stainless steel L-insert. The two storage cells without stainless steel L-insert contain a NETCO-SNAP-IN 4 4 insert.

Array E 5 5 Four Region 5 assemblies (5). Two storage cells contain a stainless steel L-insert. One cell contains a NETCO-SNAP-IN insert. One storage cell contains no insert.

5 5 Array F 6 6 Four Region 6 assemblies (6). Two storage cells contain a stainless steel L-insert. The other two cells contain no inserts.

6 6 Notes:

1. The shaded locations indicate cells which contain a stainless steel L-insert.
2. A blocked cell (X) contains a blocking device.
3. NETCO-SNAP-IN inserts must be oriented in the same direction as the stainless steel L-inserts.
4. NETCO-SNAP-IN inserts are only located in cells without a stainless steel L-insert.
5. Any cell containing a fuel assembly or a TC may instead be an empty (water-filled) cell in all storage arrays.
6. Any storage array designated for fuel assembly may be replaced with non-fissile material.
7. Interface Requirements: Each cell is part of up to four 2x2 arrays and each cell must simultaneously meet the requirements of all those arrays of which it is a part.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR ALLOWABLE STORAGE ARRAYS FIGURE 9.1-8 JUNE 2019 REVISION 20

Figure 9.5-1 has been deleted.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SCHEMATIC DIAGRAM PUBLIC ADDRESS EQUIPMENT FIGURE 9.5-1 JUNE 2013 REVISION 17

Figure 9.5-2 has been deleted.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR SCHEMATIC DIAGRAM PUBLIC ADDRESS EQUIPMENT FIGURE 9.5-2 JUNE 2013 REVISION 17

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BLOCK DIAGRAM NORMAL OFFSITE COMMUNICATIONS FIGURE 9.5-3 JUNE 2013 REVISION 17

Figure 9.5-4 has been deleted.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BLOCK DIAGRAM EMERGENCY COMMUNICATION SYSTEM FIGURE 9.5-4 SHEET 1 OF 2 JUNE 2013 REVISION 17

Figure 9.5-4 has been deleted.

PALO VERDE NUCLEAR GENERATING STATION UPDATED FSAR BLOCK DIAGRAM EMERGENCY COMMUNICATION SYSTEM FIGURE 9.5-4 SHEET 2 OF 2 JUNE 2013 REVISION 17

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.

This Figure has been redacted.