ML17354B186

From kanterella
Jump to navigation Jump to search
Forwards Turkey Point Nuclear Plant Simulator Certification Update 2, Per Requirements of 10CFR55.45(b)(5)(11) & (B) (5)(vi).Rept Describes Activities of Previous Four Years, Current Status & Plans for Subsequent Four Years
ML17354B186
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/09/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354B187 List:
References
L-98-268, NUDOCS 9811180149
Download: ML17354B186 (4)


Text

CATEGORY 1 .

REGULA aRY INFORMATION DISTRIBUTI A SYSTEM (RIDS)

ACCESSION NBR:9811180149 DOC.DATE: 98/11/09 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and. Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J'. Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards "Turkey Point Nuclear Plant Simulator Certification C Update 2," per requirements of 10CFR555.45 (b) (5) (11) & (b)

(5) (vi) .Rept describes activities of previous four years, A current status 6 plans for subsequent .four years.

T DISTRIBUTION CODE: A005D TITLE: Simulator COPIES RECEIVED:LTR Facility Certification 1

- GL-90-08 ENCL J SIZE:

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JABBOUR,K 1 1 INTERNAL E CEN ER 1 1 1 EXTERNAL: NRC PDR 1 1 D

NOTE TO ALE "RIDS" RECIPIENTS:

PLEASE HELP.'S TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415"2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 3 ENCL '3

NOVO9 t998 L-98-268 10 CFR 55.45 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Plant-Referenced Simulator

'fi i n R r As required by 10 CFR 55.45(b)(5)(ii) and (b)(5)(vi), enclosed is the Plant-Referenced Simulator Certification Report. This report is submitted to the Commission every four years and describes the activities of the previous four years, the current status, and plans for the subsequent four years. The original certification was submitted on January 2, 1991.

Per the requirements of 10 CFR 55.45(b) (5) (vi), the enclosed report includes a description of the performance tests completed during the previous four years, a description of the performance tests that are different from those in the previous four years, and a schedule for the conduct of approximately 25 percent of the performance tests per year for the next four years'er the requirements of 10 CFR 55.45(b)(5)(ii), the outstanding simulator Discrepancy Reports (DRs), and the schedule for completion of these DRs are also included. Changes have been made to the test plan to improve the overall quality of certification testing for the next four year cycle. A discussion of the basis for the changes is presented and the test plan abstracts for the tests that have been added or changed are included in Appendix A.

If there are any questions, please contact us.

Very truly yours, 6~J. Hovey R.

Vice President Turkey Point Plant pg-4 OIH Enclosure cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant q8iii80i49 gDOCK 0 5000250 pDR @DR P

an FPL Group company

U h