Notification of NRC Inspection TI-191 05000275/2017007 and 05000323/2017007 and Request for Information
ML17227A525
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/15/2017
From: Mark Haire
NRC Region 4
To: Halpin E
Pacific Gas & Electric Co
Haire M
References
IR 2017007
Download: ML17227A525 (7)


See also: IR 05000275/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

August 15, 2017

Mr. Edward D. Halpin, Senior Vice President,

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC

INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND

SPENT FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY

PREPAREDNESS COMMUNICATION/STAFFING/MULTI-UNIT DOSE

ASSESSMENT PLANS (05000275/2017007 AND 05000323/2017007) AND

REQUEST FOR INFORMATION

Dear Mr. Halpin:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a Mitigation Strategies for Beyond-Design-Basis External Eevents, Spent Fuel

Pool Instrumentation, and Emergency Preparedness Enhancements Inspection at your Diablo

Canyon Power Plant, Units 1 and 2, from November 13 - 16, 2017. The inspection will consist

of three reactor inspectors from the NRCs Region IV office, plus one of the assigned resident

inspectors at Diablo Canyon Power Plant for one week. The inspection will be conducted in

accordance with the NRCs Temporary Instruction 2515/191, Inspection of the Implementation

of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency

Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and licensee staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection

activity. Please note that the documents are requested to be provided by October 27, 2017.

During the on-site inspection, inspectors will verify that plans for complying with NRC

Orders EA-12-049 and EA-12-051 are in place and are being implemented. Inspectors will

also verify the establishment of staffing and communications plans provided in response to the

March 12, 2012, request for information letter, and multi-unit dose assessment information

provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency

Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and

information were provided in the site-specific submitals, which were subsequently reviewed by

the NRC staff for understanding and documented in the NRCs plant safety evaluations (SEs)

and safety assessments. Therefore, appropriate personnel knowledgeable of the stations

FLEX strategies, spent fuel pool instrumentation, and emergency preparedness enhancements

should be available to support the inspectors at the site during the inspection.

E. Halpin 2

We have discussed the schedule for this inspection activity with your staff. If there are any

questions about this inspection or the material requested, please contact the lead inspector,

John Mateychick, by telephone at (817) 200-1560 or by e-mail at John.Mateychick@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Branch Chief

Project Branch A

Division of Reactor Projects

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

Attachment:

FLEX Strategies, Spent Fuel Pool

Instrumentation, and EP Enhancements

Inspection Request for Information

Request for Information

FLEX Strategies, Spent Fuel Pool Instrumentation, and EP Enhancements Inspection

Diablo Canyon Power Plant

Inspection Report: 05000275/2017007 and 05000323/2017007

Inspection Dates: November 13 - 16, 2017

Inspection Procedure: Temporary Instruction 2515/191, Inspection of the

Implementation of Mitigating Strategies and Spent Fuel Pool

Instrumentation Orders, and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans

Inspectors: John Mateychick, Team Lead, Sr. Reactor Inspector, Region IV

Chris Newport, Diablo Canyon Senior Resident Inspector

Ryan Alexander, Senior Project Engineer, Region IV

Eduardo Uribe, Reactor Inspector, Region IV

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (use of the Certrec IMS information portal is preferred), to the attention of John

Mateychick, by October 27, 2017. (If electronic/CD format is preferred by Diablo Canyon

Power Plant, three copies will need to be sent to the Region IV office and one to the Diablo

Canyon Power Plant resident inspectors office.) The inspectors will select specific items from

the information requested below and then request from your staff additional documents needed

during the on-site inspection week. Also, we request that you categorize the documents in your

response with the numbered list below. Please provide requested documentation electronically

if possible. If requested documents are large and only hard copy formats are available, please

inform the lead inspector, and provide subject documentation during the first day of the on-site

inspection. If you have any questions regarding this information request, please call the lead

inspector as soon as possible.

TI 2515/191 - Appendix A

1. Provide current revision of the FLEX Final Integrated Plan (i.e., current FLEX Program

Document), including any revisions since the September 2015 submission to the NRC.

2. Provide the FLEX Strategy Basis Document.

3. Provide each operating, off-normal, abnormal, and/or emergency procedures where entry

into one or more FLEX Support Guidelines are initiated.

4. Provide a list and copies of every FLEX Support Guideline or equivalent procedure which

you developed or revised to implement your mitigating strategies.

5. Provide a list of key pieces of equipment that directly perform a FLEX mitigation strategy for

core cooling (RCS and steam generators), containment, and/or spent fuel pool cooling.

6. Provide a listing/summaries of plant modifications completed related to the FLEX program.

7. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX

program.

Attachment

8. Applicable site specific hazards for Diablo Canyon Power Plant:

a. Provide documents which show the locations and configuration of structure(s) which

store FLEX equipment.

b. Seismic

i. Provide the travel route(s) for FLEX equipment from storage location(s) to their

location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil

liquefaction is not of a concern for these travel route(s).

ii. Seismic concerns for water source(s)

1. If the FLEX water sources are seismically robust, then provide the assessment

that shows that they are.

2. If the FLEX water sources are not seismically robust, then provide:

a. an assessment of alternate water sources, and

b. the procedure(s) which describe when and how to access those sources.

c. External Flooding

i. Provide description of where FLEX equipment is stored relative to protection from

flood waters in accordance with site flood analysis.

1. If any FLEX equipment is stored below flood level, then (1) on an event timeline,

show when that equipment will be needed; and (2) provide the procedure(s) used

to retrieve and deploy that equipment.

ii. Provide your plans/procedures to support successful FLEX equipment deployment

for floods which persist over a long time period.

iii. If credited in the strategy, provide plans/procedures for storage and deployment of

temporary flood barriers, including timeline of deployment strategy.

d. Severe storms with high winds

i. Provide evaluation/evidence as to how FLEX equipment is stored relative to

protection from severe storms with high winds:

1. In a structure that meets the plants design basis for high wind hazards

(e.g., existing safety-related structure); OR

2. In a structure that meets the design requirements as described in ASCE 7-10,

Minimum Design Loads for Buildings and Other Structures, given the limiting

tornado wind speeds from Regulatory Guide 1.76, and/or design-basis hurricane

wind speeds.

ii. Provide pathways via which you plan to move FLEX equipment from on-site storage

areas to final deployment locations.

1. Show how you designated and evaluated those pathways for post-storm

accessibility for staging and connecting FLEX equipment.

2

e. Ice, Snow, and Extreme Cold

For each key piece of equipment described in item 5 (above) that directly performs or

implements a FLEX mitigation strategy:

i. Provide procedures/documents demonstrating that the FLEX equipment is

maintained at a temperature within a range to ensure that it will function when called

upon.

ii. Provide procedures/documents demonstrating how the FLEX equipment can be

moved from the storage location to its deployment location during extreme snowfall

and ice storms.

f. Extreme high temperatures

For each key piece of equipment described in item 5 (above) that directly performs or

implements a FLEX mitigation strategy:

i. Provide procedures/documents which describes the high-temperature limit of the

range within which the equipment will function.

ii. Provide procedures/documents which describe how the equipment is maintained

below that limit in its storage location.

9. Provide the station-specific FLEX strategies time validation study(ies)

10. Provide the relevant station procedure(s)/guideline(s) which describe the testing and

maintenance program for FLEX equipment.

11. Provide documents which describe the programmatic controls in place to ensure that if

equipment and applicable connections are unavailable (e.g., due to maintenance,

non-functionality), then compensatory measures are implemented in accordance with

guidance outlined NEI 12-06.

12. Provide the station-specific National SAFER Center Playbook

13. Relative to personnel training on FLEX strategies, provide:

a. FLEX training bases document(s)

b. Lesson plans/training documents for site emergency response leaders responsible for

the implementation of FLEX strategies. [Records for staff completing this training may

be requested for review during the on-site inspection week.]

c. Lesson plans/training documents for site personnel responsible for the execution of

mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation

protection, etc.). [Records for staff completing this training may be requested for review

during the on-site inspection week.]

14. A current copy of administrative procedure(s) for the CAP, modification program, operations

procedure writing and implementation, and top-level documents for the work control and

work scheduling programs. (If FLEX related procedures such as FLEX Support Guidelines

or the Final Integrated Plan (FIP) are maintained under a different process please include

copies of those procedures.)

15. A current copy of the updated final safety analysis report, technical specifications, and

technical specification bases documents.

16. Listing of corrective action program document summaries generated related to FLEX

equipment, strategies, procedures, and/or training.

3

17. A copy of any audits/self-assessments related to your preparation for this inspection, as well

as any related to the implementation or maintenance of the FLEX program.

TI 2515/191 - Appendix B

18. Provide the procedures implemented for maintenance, testing, calibration, and use of the

primary and backup spent fuel pool (SFP) instrumentation channels.

19. Provide lesson plans/training documents which describe the training program that address

the use, maintenance, calibration, surveillance, and the use of alternate power to the

primary and backup SFP instrument channels.

TI 2515/191 - Appendix C

20. Communications:

a. Provide documents which show that the communications system(s), technologies,

equipment, and power supplies would be available from the beginning of the event and

operate during an ELAP.

b. Provide the procedures and/or guidance used to implement the communication

capabilities.

c. Provide documents which show that you have added any new communications

equipment, portable power supplies and/or systems have been added to ongoing testing

and preventative maintenance programs.

21. Staffing:

a. Provide documents which show that on-site and augmented staff will be available to

implement the strategies in response to a large scale natural event that results an ELAP

and impedes access to the site, and that functions/tasks have been appropriately

staffed.

b. Provide documents which show that the site access methods (e.g., roadways, navigable

bodies of water and dockage, airlift, etc.) expected to be available following the event

and available to the Emergency Response Organization (ERO) [as described in your

Phase 1 and 2 staffing assessments and NRC safety assessment].

c. Provide documents which show the testing, training, and drills/exercises performed by

you to demonstrate the EROs ability to utilize the communications systems and/or

equipment.

22. Provide documents and procedures which show that your dose assessment is capable of

analyzing concurrent radiological releases from all on-site significant sources, including

releases from spent fuel pools (i.e., multi-unit/multi-source dose assessment capability).

Lead Inspector Contact Information:

John Mateychick, Senior Reactor Inspector Mailing Address:

817-200-1560 U.S. NRC, Region IV

John.Mateychick@nrc.gov Attn: John Mateychick, DRS

1600 East Lamar Blvd.

Arlington, TX 76011-4511

4

ML17227A525

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JMM Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:EB2 C:PBA

NAME JMateychick MHaire

SIGNATURE /RA/ /RA/

DATE 08/15/2017 08/15/2017