ML17158B414
ML17158B414 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 02/03/2017 |
From: | David Reeser NRC/RGN-III/DRS/OLB |
To: | FirstEnergy Nuclear Operating Co |
Shared Package | |
ML16242A222 | List: |
References | |
Download: ML17158B414 (4) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Crew-1 Facility: PERRY Date of Exam: Feb 2017 Operating Test No.:2017-01 A E Scenarios P V 1 2 3 x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U SRO-I-1 RX 2 6 2 1 1 0 NOR 1 1 2 1 1 1 I/C 4,5,6, 4,7 5,9 8 4 4 2 7
MAJ 6,7 6,7 7,8 6 2 2 1 TS 3,4 2 0 2 2 SRO-I-2 3 1 RX 2 2 6 1 0 NOR 1 1 2 1 1 1 I/C 3,5 3,4,5, 3,4,5, 10 4 4 2 7 9 MAJ 6,7 6,7 7,8 6 2 2 1 TS 3,4 1,2 4 0 2 2 RO-I 1 1 Rx 2 1 0 NOR 1 1 2 1 1 1 I/C 4,6,7 5 3,4 6 4 4 2 MAJ 6,7 6,7 7,8 6 2 2 1 TS 0 0 2 2 Rx NOR I/C MAJ TS Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 1 of 4 FENOC Facsimile Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Crew-2 Facility: PERRY Date of Exam: Feb 2017 Operating Test No.:2017-01 A E Scenarios P V 1 3 x x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U SRO-U-1 RX 2 1 1 1 0 NOR 1 1 2 1 1 1 I/C 4,5,6, 3,4 6 4 4 2 7
MAJ 6,7 7,8 4 2 2 1 TS 3,4 2 0 2 2 SRO-I-3 2 1 RX 2 6 1 0 NOR 1 1 1 1 1 I/C 3,5 3,4,5, 6 4 4 2 9
MAJ 6,7 7,8 4 2 2 1 TS 1,2 2 0 2 2 RO-2 1 1 Rx 6 1 0 NOR 1 1 1 1 1 I/C 4,6,7 5,9 5 4 4 2 MAJ 6,7 7,8 4 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 2 of 4 FENOC Facsimile Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Crew-3 Facility: PERRY Date of Exam: Feb 2017 Operating Test No.:2017-01 A E Scenarios P V 1 3 x x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U RO-3 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 3,5 3,4 4 4 4 2 MAJ 6,7 7,8 4 2 2 1 TS 0 0 2 2 RO-4 1 1 RX 6 1 0 NOR 1 1 1 1 1 I/C 4,6,7 5,9 5 4 4 2 MAJ 6,7 7,8 4 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 3 of 4 FENOC Facsimile Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Crew-4 Facility: PERRY Date of Exam: Feb 2017 Operating Test No.:2017-01 A E Scenarios P V 1 3 x x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U RO-5 RX 2 1 1 1 0 NOR 1 1 1 1 1 I/C 3,5 3,4 4 4 4 2 MAJ 6,7 7,8 4 2 2 1 TS 0 0 2 2 RO-6 1 1 RX 6 1 0 NOR 1 1 1 1 1 I/C 4,6,7 5,9 5 4 4 2 MAJ 6,7 7,8 4 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.