2017 Perry Nuclear Power Plant Initial Licensed Operator Examination ES-201-2
ML17170A198
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/31/2016
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML16242A222 List:
References
Download: ML17170A198 (1)


Text

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Per[Y Nuclear Power Plant Date of Examination: 02/17/2017 Initials Item Task Description a b* c#

1.

w

a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 or ES-401 N. J,.. P/A (j.-

R b. Assess whether the outline was systematically and randomly prepared in accordance with T

I Section D.1 of ES-401 or ES-401 N and whether all KIA categories are appropriately sampled. Ju. lr I~ 8-T E c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

N

d. *Assess whether the justifications for deselected or rejected KIA statements are appropriate. J..,. ~

2.

s

a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major transients.

Ju.  ?

I M b. Assess whether there are enough scenario sets (and spares) to test the projected number and u mix of applicants in accordance with the expected crew composition and rotation schedule L

A without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the

~ fct?-

T applicants' audit test(s), and that scenarios will not be repeated on subsequent days.

0 R

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D. ~ uz-
3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed w among the safety functions as specified on the form A

L (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) ~ iJL K (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on T the form.

H R b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form 0

u (2) at least one task is new or significantly modified ~~ (F-G (3) no more than one task is repeated from the last two NRC licensing examinations H

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. ~ ,;?--

~

4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections. iJ-G E b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate. ~ 6l-N E
c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5. ~ JZ..

R A

d. Check for duplication and overlap among exam sections. ~ uz-L e. Check the entire exam for balance of coverage. ~ ~
f. Assess whether the exam fits the appropriate job level (RO or SRO). t{M ~~ oz.-

Printed ~ffiignature rt:f Date W

~

a. Author Dell McNeil 1 /?tctf?t.

~.i:IL

b. Facility Reviewer(*) n/a
c. NRC Chief Examiner(#) o.,;, Ree"' I ~
d. NRC Supervisor RobertOrlikowskiL==-~ 'L
  • Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
  • Not applicable for NRC-prepared examination outlines.

ES-201, Page 1 of 28