Text

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Per[Y Nuclear Power Plant Date of Examination: 02/17/2017 Initials Item Task Description a

b*

c#

1. w
a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 or ES-401 N.

J,.. P/A (j.-

R

b. Assess whether the outline was systematically and randomly prepared in accordance with I

Ju.

lr T

Section D.1 of ES-401 or ES-401 N and whether all KIA categories are appropriately sampled.

T Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

I~

8-E

c.

N J..,.

~

d. *Assess whether the justifications for deselected or rejected KIA statements are appropriate.
2.
a.

Using Form ES-301-5, verify that the proposed scenario sets cover the required number of Ju.

?

normal evolutions, instrument and component failures, technical specifications, and major s

transients.

I M

b.

Assess whether there are enough scenario sets (and spares) to test the projected number and u

mix of applicants in accordance with the expected crew composition and rotation schedule

~

fct?-

L without compromising exam integrity, and ensure that each applicant can be tested using at A

least one new or significantly modified scenario, that no scenarios are duplicated from the T

applicants' audit test(s), and that scenarios will not be repeated on subsequent days.

0 To the extent possible, assess whether the outline(s) conform(s) with the qualitative and

~

uz-R

c.

quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3.
a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed w

among the safety functions as specified on the form

~

A (2) task repetition from the last two NRC examinations is within the limits specified on the form iJL L

(3) no tasks are duplicated from the applicants' audit test(s)

K (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on T

the form.

H R

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

0 (1) the tasks are distributed among the topics as specified on the form

~~

(F-u (2) at least one task is new or significantly modified G

(3) no more than one task is repeated from the last two NRC licensing examinations H

Determine if there are enough different outlines to test the projected number and mix of

~

c.

,;?--

applicants and ensure that no items are duplicated on subsequent days.

4.
a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the

~

iJ-appropriate exam sections.

G

~

6l-E

b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

N Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5.

~

JZ..

E

c.

R

d. Check for duplication and overlap among exam sections.

~

uz-A

~

~

L

e. Check the entire exam for balance of coverage.
f.

Assess whether the exam fits the appropriate job level (RO or SRO).

t{M

~~ oz.-

Printed ~ffiignature rt:f Date

~

a. Author Dell McNeil 1 W /?tctf?t.
b. Facility Reviewer(*)

n/a

c.

NRC Chief Examiner(#)

o.,;, Ree"' I ~

~.i:IL

d.

NRC Supervisor RobertOrlikowskiL==-~ 'L

  • Note:
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
  • Not applicable for NRC-prepared examination outlines.