ES-301 Administrative Topics Outline Form ES-301-1 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination:
Feb 2017 Examination Level: RO Operating Test Number: 2017301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations OT-3701-ADM_029_RO R, N 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Importance RO 4.4 Perform daily Jet Pump surveillance Conduct of Operations OT-3701-ADM_012_RO S or C, N 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, and reports.
Importance RO 3.6 Perform Weekly DG Fuel Oil Record Equipment Control OT-3701-ADM_022_RO R, D 2.2.12 Knowledge of surveillance procedures.
Importance RO 3.7 Determine identified/unidentified leakage rates Radiation Control OT-3701-ADM_011_RO R, D 2.3.14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
Importance RO 3.4 Determine dose for job Emergency Procedures/Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination:
Feb 2017 Examination Level: SRO Operating Test Number: 2017301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations OT-3701-ADM_029SRO R, N 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Importance SRO 4.7 Review daily Jet Pump SVI Conduct of Operations OT-3701-ADM_024SRO C, D 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, and reports.
Importance SRO 3.8 Determine reporting requirements Equipment Control OT-3701-ADM_030SRO R, N 2.2.14 Knowledge of the process for controlling equipment configuration or status.
IMPORTANCE SRO 4.3 Determine Fire Protection impairment requirements.
Radiation Control OT-3701-ADM_019SRO R, D 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.
Importance SRO 3.7 Determine if an operator can perform an emergency evolution Emergency Procedures/Plan OT-3701-ADM_312SRO R, M 2.4.30 Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
Importance SRO 4.1 Declare the EAL and PARs NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination: Feb 2017 Exam Level: RO Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- a. Reactor Protection System OT-3701-C71_501 Perform RPS Man Scram Functional A, N, S 1
- c. Reactor Core Isolation Cooling System OT-3701-E51_003 Control RPV Pressure with RCIC M, S, L 3
- d. RHR/Shutdown Cooling System OT-3701-E12_504 Establish Shutdown Cooling A, D, S, L 4
- e. Primary Containment Isolation System OT-3701-B21_508 Perform Isolations and Actuations HC A, N, S, L 5
- f.
Emergency Generator System OT-3701-R43_016 Unload and shutdown Div 1 DG D, S, EN 6
g Local Power Range Monitoring System OT-3701-C51_002 Bypass failed LPRM M, S 7
h Standby Gas Treatment System OT-3701-M15_001 Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS Diesel Generator System OT-3701-E22B_001 Single Compressor Ops for Div 3 DG N, E 6
- j.
Control Room Abandonment OT-3701-C61_003 Perform ESW Pumphouse Actions for fire in control room D, E 7
- k. Component Cooling Water System OT-3701-P41_001 Perform recovery from providing ESW keep-fill N, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination: Feb 2017 Exam Level: SRO-I Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- a. Reactor Protection System OT-3701-C71_501 Perform RPS Man Scram Functional A, N, S 1
- c. Reactor Core Isolation Cooling System OT-3701-E51_003 Control RPV Pressure with RCIC M, S, L 3
- d. RHR/Shutdown Cooling System OT-3701-E12_504 Establish Shutdown Cooling A, D, S, L 4
- e. Primary Containment Isolation System OT-3701-B21_508 Perform Isolations and Actuations HC A, N, S, L 5
- f.
g Local Power Range Monitoring System OT-3701-C51_002 Bypass failed LPRM M, S 7
h Standby Gas Treatment System OT-3701-M15_001 Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS Diesel Generator System OT-3701-E22B_001 Single Compressor Ops for Div 3 DG N, E 6
- j.
Control Room Abandonment OT-3701-C61_003 Perform ESW Pumphouse Actions for fire in control room D, E 7
- k. Component Cooling Water System OT-3701-P41_001 Perform recovery from providing ESW keep-fill N, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination: Feb 2017 Exam Level: SRO-U Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- a. Reactor Protection System OT-3701-C71_501 Perform RPS Man Scram Functional A, N, S 1
- b.
- c.
- d.
- e. Primary Containment Isolation System OT-3701-B21_508 Perform Isolations and Actuations HC A, N, S, L 5
- f.
g h
Standby Gas Treatment System OT-3701-M15_001 Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS Diesel Generator System OT-3701-E22B_001 Single Compressor Ops for Div 3 DG N, E 6
- j.
- k. Component Cooling Water System OT-3701-P41_001 Perform recovery from providing ESW keep-fill N, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1