ML17158B339
| ML17158B339 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 02/03/2017 |
| From: | David Reeser NRC/RGN-III/DRS/OLB |
| To: | FirstEnergy Nuclear Operating Co |
| Shared Package | |
| ML16242A222 | List: |
| References | |
| Download: ML17158B339 (5) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Perry Date of Examination:
Feb 2017 Examination Level: RO Operating Test Number: 2017301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R, N Perform daily Jet Pump surveillance Conduct of Operations S or C, N Perform Weekly DG Fuel Oil Record Equipment Control R, D Determine identified/unidentified leakage rates Radiation Control R, D Determine dose for job Emergency Procedures/Plan N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Perry Date of Examination:
Feb 2017 Examination Level: SRO Operating Test Number: 2017301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R, N Review daily Jet Pump SVI Conduct of Operations C, D Determine reporting requirements Equipment Control R, N Determine Fire Protection impairment requirements Radiation Control R, D Determine if an operator can perform an emergency evolution Emergency Procedures/Plan R, M Declare the EAL and PARs NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-2 Facility:
Perry Date of Examination: Feb 2017 Exam Level: RO Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- a. RPS / Perform RPS Manual Scram Functional A, N, S 1
- d. RHR / Establish Shutdown Cooling A, D, S, L 4
- e. PCIS / Perform Isolations and Actuations HC A, N, S, L 5
- f.
EDG / Unload and shutdown Div 1 DG D, S, EN 6
g LPRM / Bypass failed LPRM M, S 7
h SBGT / Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS DG / Single Compressor Ops for Div 3 DG N, E 6
- j.
ESW / Perform ESW Pumphouse Actions for fire in control room D, E 7
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Administrative Topics Outline Form ES-301-2 Facility:
Perry Date of Examination: Feb 2017 Exam Level: SRO-I Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- d. RHR / Establish Shutdown Cooling A, D, S, L 4
- e. PCIS / Perform Isolations and Actuations HC A, N, S, L 5
- f.
n/a n/a n/a g
LPRMS / Bypass failed LPRM M, S 7
h SBGT / Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS DG / Single Compressor Ops for Div 3 DG N, E 6
- j.
ESW / Perform ESW Pumphouse Actions for fire in control room D, E 7
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Administrative Topics Outline Form ES-301-2 Facility:
Perry Date of Examination: Feb 2017 Exam Level: SRO-U Operating Test No.: 2017301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- b. n/a
- c. n/a
- d. n/a
- e. PCIS / Perform Isolations and Actuations HC A, N, S, L 5
- f.
n/a g
Na/
h SBGT / Shift AEGT fans M, EN, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
HPCS DG / Single Compressor Ops for Div 3 DG N, E 6
- j.
n/a
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1