Letter Sequence Request |
---|
|
|
MONTHYEARML0531401872005-11-0404 November 2005 G20050762 - Brian Farber of Representative Timothy Bishop'S Staff e-mail Re Millstone Nuclear Project stage: Request ML0532600772005-12-13013 December 2005 G20050762/LTR-05-0571 - Hon. Timothy Bishop Ltr Response to Brian Farber'S Email Dated November 4, 2005 Project stage: Other 2005-11-04
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21141A0482021-05-18018 May 2021 5/18/2021 E-mail Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21103A0532021-04-13013 April 2021 NRR E-mail Capture - Millstone Unit No. 3 - Acceptance Review Determination: Request for Alternative Frequency to Supplemental Valve Position Indication Verification Testing Requirement ML21084A0042021-03-25025 March 2021 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements 2024-02-01
[Table view] Category:Congressional Correspondence
MONTHYEARCY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 ML0927506252009-10-22022 October 2009 G20090534/LTR-09-0459/EDATS: SECY-2009-0422- Senator Joseph T. Lieberman Letter Release of Radionuclides by Millstone Power Station ML0927208922009-08-17017 August 2009 G20090534/LTR-09-0459/EDATS: SECY-2009-0422 - Ltr. Senator Joseph I. Lieberman Release of Radionuclides by Millstone Power Station ML0532600772005-12-13013 December 2005 G20050762/LTR-05-0571 - Hon. Timothy Bishop Ltr Response to Brian Farber'S Email Dated November 4, 2005 ML0531401872005-11-0404 November 2005 G20050762 - Brian Farber of Representative Timothy Bishop'S Staff e-mail Re Millstone Nuclear ML0529800352005-11-0404 November 2005 G20050698/LTR-05-0499 - Christopher J. Dodd Ltr Re. Licensing Employees Who Perform HVAC Work at the Millstone Nuclear Power Plant ML0528701082005-10-0707 October 2005 G20050698/LTR-05-0499 - Sen Christopher Dodd Ltr. Millstone Nuclear Power Plant (Robert Vivari, Jr.) Licensing Employees Who Perform HVAC Work ML0514404752005-05-27027 May 2005 G20050330/LTR-05-0250 - Sen. C. J. Dodd Letter Dated 4/27/05 Regarding Millstone Unit 3 (Nancy Burton, Connecticut Coalition Against Millstone) ML0514603082005-03-17017 March 2005 Invitation Letters for Millstone Annual Assessment Public Meeting on 29 March 2005 ML0504101612005-03-10010 March 2005 G20050111 - Congressman Timothy Bishop Ltr. Millstone-Evacuation Concerns ML0505403882005-02-0808 February 2005 G20050111 - Rep. Timothy Bishop (Brian D. Farber) e-mail Re Millstone - Evacuation Concerns ML0426104722004-11-0909 November 2004 G20040598/LTR-04-0555 - Ltr to Rep. Rob Simmons, Protection of Millstone ML0426700232004-10-0808 October 2004 G20040618/LTR-04-0565 - Senator Joseph I. Lieberman Ltr. Re. Storage of Nuclear Waste and Chemical and Radiologic Pollutants at the Millstone Power Station ML0425905412004-08-25025 August 2004 G20040618/LTR-04-0565 - Sen Joseph I. Lieberman Ltr Express Concerns About Safety and Environmental Issues Related to Millstone Nuclear Power Plant ML0419401442004-07-0202 July 2004 Ltr to Congressman Christopher Shays from K. Cyr Millstone Nuclear Power Plant ML0408906392004-03-11011 March 2004 Invitee Letters to March 25, 2004 NRC Annual Assessment Meeting of Millstone Power Station ML0405700802004-02-23023 February 2004 Connecticut Coalition Against Millstone V. NRC, No. 04-0109, Dated 02/23/04 ML0306601412003-04-14014 April 2003 G20030086/LTR-03-0102 - W. D. Travers Ltr. to Sen. Joseph I. Lieberman Ltr. Re Safety Issues with Millstone (Gertrude Birk) ML0305902022003-02-14014 February 2003 G20030086/LTR-03-0102 - Sen. Joseph I. Lieberman Ltr. Safety Issues with Millstone (Gertrude Birk) ML0302800322003-01-22022 January 2003 G20030034/LTR-03-0035 - Sen. Hiliary Rodham Clinton Ltr Request Commission Review Draft Report by Witt Associates Regarding Emergency Preparedness for Areas of New York State Around Indian Point & Millstone Nuclear Power Plants ML0212703592002-05-29029 May 2002 G20020236/LTR-02-0287 - Sen. Joseph I. Lieberman Ltr. Re Concerns Missing Nuclear Spent Fuel Rods from Nuclear Utilities (Laurel Pierce) 2011-07-14
[Table view] |
Text
EDO .P.rincipal Correspondence Control FROM: DUE: 11/23/05 EDO CONTROL: G20050762 DOC DT: 11/04/05 FINAL REPLY:
Brian Farber Representative Timothy Bishop Shane, OCA FOR SIGNATURE OF : ** GRN ** CRC NO:
Reyes, EDO DESC: ROUTING:
Millstone Nuclear Reyes Virgilio Kane Silber Dean Cyr/Burns DATE: 11/08/05 Zimmerman,NSIR Collins, RI ASSIGNED TO: CONTACT: Schmidt, OCA NRR Dyer SPECIAL INSTRUCTIONS OR REMARKS:
Prepare response to Representative Bishop for EDO signature.
me~et' ED -DC) F-booi1
I. Cathy Jaeaers - MILLSTONE NUCLEA'R Pagie 1 ;
- NCLER I ath Jaeers- MILSTNE Pae i From: "Farber, Brian" <Brian.Farber@mail.house.gov>
To: "'RMS2@hrc.gov"' <RMS2@nrc.gov>
Date: 11/4/05 9:37AM
Subject:
MILLSTONE NUCLEAR Raeann:
Thank you for sending over the information relating to Haddam Neck. Would you also please have sorneone at the NRC take a look at the following issues raised by one of Mr. Bishop's constituents? Our constituent has inquired as to the status of improvements to the items listed below. Long Island has a significant interest in the plant's security as a large portion of the Island is within the emergency planning zone. I understand that there are security concerns when specifics are released, therefore, we would be satisfied with the NRC's assurance that necessary measures are being taken to address vulnerabilities at the plant.
- Waterborne Intake Barrier
- Radiation Monitoring We would appreciate a response in writing. If you have any questions, please do not hesitate to contact me.
Thanks very much and good luck in your new role.
Brian Brian D. Farber Press Secretary/Legislative Assistant Congressman Timothy Bishop (NY-01) 1133 Longworth HOB Washington, DC 20515 (202) 225-3826/Fax: (202) 225-3143
Il c:\empXGW)00001.TMP Paqe 1 Pageii Ic p---------.MP Mail Envelope Properties (436B721D.4FF:116: 34047)
Subject:
MILLSTONE NUCLEAR Creation Date: 11/4/05 9:36AM From: "Farber, Brian" <Brian.Farber(@mail.house.gov>
Created By: Brian.Farberemail.house.gov Recipients nrc.gov TWGWPOO2.HQGWDO0 1 RMS2 (Raeann Shane)
Post Office Route TWGWPOO2.HQGWDOO 1 nrc.gov Files Size Date & Time MESSAGE 1097 11/04/05 09:36AM TEXT.htm 2003 Mime.822 4834 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard