ML21103A053
| ML21103A053 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/13/2021 |
| From: | Richard Guzman NRC/NRR/DORL/LPL1 |
| To: | Sinha S Dominion Generation |
| References | |
| L-2021-LLR-0018 | |
| Download: ML21103A053 (3) | |
Text
From:
Guzman, Richard Sent:
Tuesday, April 13, 2021 7:50 AM To:
Shayan.Sinha@dominionenergy.com Cc:
RidsNRRLIC109 Resource; Danna, James
Subject:
Millstone Unit No. 3 - Acceptance Review Determination: Request for Alternative Frequency to Supplemental Valve Position Indication Verification Testing Requirement [EPID: L-2021-LLR-0018]
Mr. Sinha, By letter dated March 24, 2021 (ADAMS Accession No. ML21084A239), Dominion Energy Nuclear Connecticut, Inc. (DENC) submitted a proposed alternative request to the American Society of Mechanical Engineers, Operation and Maintenance of Nuclear Power Plants Code, ISTC-3700 frequency requirement to allow performance of supplemental valve position verification at a frequency consistent with 10 CFR 50, Appendix J Type C testing for the valves within the scope of this request.
The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the submittal has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed DENCs submittal and concludes that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that the review of the relief request will take approximately 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> to complete. The NRC staff expects to complete this review by April 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date (greater than a month) or significant changes in the forecasted hours (greater than 25%), the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.
- Thanks,
Rich Guzman Sr. PM, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov
Hearing Identifier:
NRR_DRMA Email Number:
1117 Mail Envelope Properties (MN2PR09MB5322CA0BE1F32C7E7C14F70B964F9)
Subject:
Millstone Unit No. 3 - Acceptance Review Determination: Request for Alternative Frequency to Supplemental Valve Position Indication Verification Testing Requirement [EPID:
L-2021-LLR-0018]
Sent Date:
4/13/2021 7:49:55 AM Received Date:
4/13/2021 7:49:56 AM From:
Guzman, Richard Created By:
Richard.Guzman@nrc.gov Recipients:
"RidsNRRLIC109 Resource" <RidsNRRLIC109.Resource@nrc.gov>
Tracking Status: None "Danna, James" <James.Danna@nrc.gov>
Tracking Status: None "Shayan.Sinha@dominionenergy.com" <Shayan.Sinha@dominionenergy.com>
Tracking Status: None Post Office:
MN2PR09MB5322.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3211 4/13/2021 7:49:56 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: