L-2021-112, In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)

From kanterella
Jump to navigation Jump to search
In-Service Inspection Program, ISI Fifth Interval - First Period SL1-30, Owner'S Activity Report (OAR-1)
ML21225A744
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/13/2021
From: Godes W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2021-112
Download: ML21225A744 (5)


Text

August 13, 2021 L-2021-112 10 CFR 50.36 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 In-Service Inspection Program ISI Fifth Interval - First Period SL1-30 Owners Activity Report (OAR-1)

Enclosed is the Owners Activity Report, Form OAR-1, for the St. Lucie Unit 1 SL1-30 refueling outage. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL1-30 refueling outage ended on May 17, 2021.

Should you have any questions regarding this submittal, please contact me at (772) 467-7435.

Sincerely, Wyatt Godes Licensing Manager St. Lucie Plant WG/rcs

Attachment:

PSL1-30 Refueling Outage OAR-1 Owners Activity Report cc: NRC Region II Administrator NRC Site Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2021-112 Attachment Page 1 of 4 Attachment 1 PSL1-30 Refueling Outage OAR-1 Owners Activity Report

L-2021-112 Attachment EC-296570 Page 2 ofRev.

4 0 PSL-ENG-SESJ-21-001 Page 2 of 4 Report Number: ISl-PSL-1-2021 Plant: St. Lucie Nuclear Power Plant Unit 1 6501 South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: December 21. 1976 Refueling Outage No.: SL 1-30 Current Inspection Interval: ISi-Fifth Interval. IWE-Third Interval Current Inspection Period: ISi - Third Outage First Period. IWE - Second Outage First Period Edition and Addenda of Section XI applicable to the inspection plan: ISi Fifth Interval and IWE Third Interval - 2007 Edition through 2008 Addenda Date and Revision of inspection plan: ISi - Fifth Interval Februarv 10. 2018 Rev. O IWE - Third Interval July 15. 2018. Rev. O Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases Used: N-513-4. N-532-5. N-706-1. N-722-1. N-729-6. N770-2 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SL 1-30 conform to the requirements of Section XI.

Signed-~~ -~----~ --~ --+-------------

PSL Engineering Programs Manager Date 8/12/2021 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property da:~ :?Jj/;"~ Y kin_d arising from or connected with this inspection.

l ""::::::='.'.'.:""7

~'~~ ~~:..:::~-..:.~~~---Commissions tJB Jc./dff+. ~ ' N. J Inspector's Sig, e National Board Number and Endorsements Date Atf'-"..sf l.3,- ..).Q:;.J EN-AA-203-1100-F01 REVISION 3 I ECFORM-130

L-2021-112 Attachment Page 3 of 4 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

L-2021-112 Attachment Page 4 of 4 TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair /

Code Item Date Description of Work Replacement Class Description Completed Plan Number INSTALL NEW SPOOL PIECE BY 3 CW-68 6/30/21 SL1-20003 BOLTED CONNECTION REPLACE COUPLING BY WELDING PER 3 CW-72 5/11/21 SL1-20004 EC 294847 REMOVE DEFECT AND INSTALL HALF 3 CW-13 COUPLING AND CAP BY WELDING PER 5/10/21 SL1-20005 EC 294845 2 SI-511 REPLACE PIPE SPOOL BY WELDING 8/13/21 SL1-21005