U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000259/2018413, 05000260/2018413, and 05000296/2018413
ML19024A340
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/24/2019
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Sovizral S
Tennessee Valley Authority
References
IR 2018413
Download: ML19024A340 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2019

SUBJECT:

BROWNS FERRY NUCLEAR PLANT- U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000259/2018413, 05000260/2018413, AND 05000296/2018413

Dear Mr. Sovizral:

On December 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Browns Ferry Nuclear Plant, Units 1, 2 and 3, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation, or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Browns Ferry Nuclear Plant. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC Resident Inspector at the Browns Ferry Nuclear Plant.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related InformationWithhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-259, 50-260, 50-296 License No.: DPR-33, DPR-52, DPR-68 Enclosure:

Inspection Report No. 05000259/2018413, 05000260/2018413, and 05000296/2018413 w/ Attachment: Supplementary Information cc: (See page 3) cc:

Glen E. Pry, General Manager, Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Mr. Werner K. Paulhardt Plant Manager, Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 Mr. James A. Kent Director, Plant Support Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Mr. C. E. Glover Director, Nuclear Security (temp)

Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 _ML19024A340 __ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/EB2 RII/DRS/EB2 SIGNATURE MJS6 SMS NAME S.SINGLETARY S.SHAEFFER DATE 1/ 23 /2019 1/ 24 /2019 E-MAIL COPY? YES NO YES NO